Planning application
Land West Of Selsfield Road Ardingly West Sussex
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Reserved Matters application for consideration of consider all outstanding matters (layout, scale, landscaping and appearance) in respect of outline planning permission DM/22/1575 (and the subsequent variation of conditions 2 and 11 through permission DM/23/3250). (Amended plans received 12/08/2026)
As published by the council, reference DM/26/1186
Application record
- Reference
- DM/26/1186
- Type
- Reserved Matters Application
- Status
- Pending Consideration
- Received
- 12 May 2026
- Validated
- 12 May 2026
- Ward
- Ardingly, Balcombe And Turners Hill
- Parish
- Ardingly
Site history
Applications at this address on the Mid Sussex register
This site has had 5 applications since 2026: 1 approved, 0 refused.
-
DM/26/2143 Awaiting decision
Land West Of Selsfield Road Ardingly West Sussex
Discharge of condition 12 and 14 relating to planning application DM/23/3250
-
DM/26/1945 Awaiting decision
Land West Of Selsfield Road Ardingly West Sussex
Discharge of condition no 4 relating planning application DM/23/3250
-
DM/26/1405 Awaiting decision
Land West Of Selsfield Road Ardingly West Sussex
Discharge of condition 9 relating to planning reference DM/23/3250.
-
DM/26/1406 Granted
Land West Of Selsfield Road Ardingly West Sussex
Discharge of condtions 19, 20, and 21 relating to planning reference DM/23/3250.
Timeline
Dates from the published record
-
12 May 2026
Received by Mid Sussex
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 7 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Sussex took a median of 52 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
173 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Mid Sussex for determination, against a statutory target of eight weeks. Over the last year Mid Sussex's median decision took 52 days. More in our guide to how long planning decisions take.
About reserved matters applications
A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
20 Turnpike Court Hett Close Ardingly Haywards Heath West Sussex RH17 6GQ
Beech Tree (T1) - Remove lateral growth by up to 2-3 metres and Beech Tree (T2) - Fell.
Granted Trees 10 docs -
16 Gowers Close Ardingly Haywards Heath West Sussex RH17 6UF
Proposed loft conversion with rear dormer and 2 Velux windows
Granted Loft or dormer Windows or glazing -
Turnpike Court Hett Close Ardingly West Sussex RH17 6GQ
See tree schedule/plan of works.
Granted Trees 8 docs -
11 - 14 Hett Close Ardingly Haywards Heath West Sussex RH17 6TE
Replacement of existing double glazed timber framed casement windows with double-glazed uPVC casements windows. Replacement of double-glazed timber framed communal doors with new double-glazed composite uPVC doors. Amended Plans received 25.02.2026 to show substitution of UPVC replacement windows and doors to double glazed timber framed windows and doors, and replacement of two exisitng rear rooflights with new double glazed timber framed rooflights.
Granted Full applications Loft or dormer Windows or glazing 42 docs -
Little Deerswood High Street Ardingly Haywards Heath West Sussex RH17 6TG
T1 Oak - Reduce the crown by 2.5m, thin by 20%
Granted Trees 9 docs -
1, 2, 4, 5, 6, 7, 8 And 9 Hett Close Ardingly Haywards Heath West Sussex RH17 6TE
Replacement of existing front and side double-glazed timber framed casement windows with new double-glazed timber framed casement windows with glazing bars to match existing styles. Replacement of existing rear double-glazed timber framed casement windows with new double-glazed UPVC framed casement windows with glazing bars to match existing styles. Replacement of existing double-glazed timber framed rear doors with new double-glazed UPVC framed rear doors with glazing bars to match existing styles. (Amended Description and Amended Plans rcvd 01.04.2026)
Granted Full applications Windows or glazing 34 docs
Other reserved matters applications
In Mid Sussex
-
DM/25/0446 Granted
Burgess Hill Northern Arc, Land N And NW Of Burgess Hill, Between Bedelands Nature Reserve In The East And, Goddard's Green Waste Water Treatment Works In The West
The construction of a single carriageway link road from the tie-in with the proposed Western Bridge and Link Road (WBLR), through to the proposed tie-in with Eastern Bridge and Link Road (EBLR) including tie-ins to the existing B2036 Cuckfield Road. The primary east-west route will typically comprise of a new 6.5m carriageway with one 3m shared footway/cycleway and one 2m wide footway and two 2.75m verges. While the 6.5m wide carriageway will be consistent throughout, some sections of the primary east-west route will diverge from this typical arrangement to complement area specific requirements. The northern link to the B2036 Cuckfield Road from the proposed east-west road will consist of a new 6.5m wide carriageway and single 2m footway. The southern link to the B2036 Cuckfield Road from the proposed east-west road will consist of a new 6.5m wide carriageway and a short extension of the Green Super Highway extending to the driveway entrance servicing the existing Oak Barn Bar & Restaurant carpark. The western end of the east-west road corridor and the southern link to the B2036 Cuckfield Road will both facilitate connections to the Green Superhighway. All will be constructed to an adoptable standard, together with associated crossing points, earthworks and vegetation removal, surface water and foul drainage infrastructure, utilities corridors and diversions, road lighting, soft landscaping, including tree-planting and temporary fencing, on-street parking and provision of in-line bus stops for bus services. (Amended plans recieved 15/02/2026).
-
DM/25/2640 Granted
Burgess Hill Northern Arc, Land N And NW Of Burgess Hill, Between Bedelands Nature Reserve In The East And, Goddard's Green Waste Water Treatment Works In The West
Reserved matters application to consider access, appearance, landscaping, layout and scale pursuant to application DM/23/0747 (original reference DM/18/5114) for parcel P1.2 comprising of the construction of a primary school with nursery and special support centre, car parking, multi-use games area, playing fields, landscaping and associated infrastructure.
-
DM/26/0167 Granted
Penland Farmhouse Hanlye Lane Cuckfield Haywards Heath West Sussex RH17 5HR
Approval of Reserved Matters following Outline consent DM/23/0972 relating to appearance, layout, scale and landscaping details for the construction of four dwelling houses.
-
DM/26/0682 Awaiting decision
Land At Hurst Farm Hurstwood Lane Haywards Heath West Sussex
Reserved Matters Application Pursuant to Outline Planning Permission Mid Sussex District Council (MSDC) Reference: DM/25/1630, Lewes District Council (LDC) Reference: LW/2510707 at Hurst Farm, for appearance, layout, scale and landscaping only. (additional ecology information received 28/05/2026). (Amended plans received 12/08/2026 showing various design and layout changes).
-
DM/26/0131 Awaiting decision
Land South And West Of Upper Imberhorne School Imberhorne Lane East Grinstead West Sussex
Approval of Reserved Matters following Outline Planning Permission (Ref. DM/23/2699) relating to appearance, landscaping, layout and scale for 550 no. new residential units. (Drainage addendum received 02/04/2026). (Amended plans and information received 20th to 27th May showing revisions to the proposed design, landscaping, highways, housing and sustainability measures) (Surface water calculations received 24/06/2026). (Amended plans received 27th July showing design changes to some units and lighting to the pedestrian link to the northeast onto Imberhorne Lane).