Planning application
DM/26/0682
Land At Hurst Farm Hurstwood Lane Haywards Heath West Sussex
Proposal
Reserved Matters Application Pursuant to Outline Planning Permission Mid Sussex District Council (MSDC) Reference: DM/25/1630, Lewes District Council (LDC) Reference: LW/2510707 at Hurst Farm, for appearance, layout, scale and landscaping only. (additional ecology information received 28/05/2026).
As published by the council, reference DM/26/0682
Timeline
Dates from the published record
-
17 Mar 2026
Received by Mid Sussex
-
24 Mar 2026
Validated
Checked as complete and ready for consideration.
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Mid Sussex for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About reserved matters applications
How this application type works
A reserved matters application fills in the detail held back from an earlier outline permission, typically appearance, landscaping, layout, scale or access. The council judges it against the outline permission already granted, not the principle of development, which is settled. It must normally be submitted within three years of the outline decision.
Nearby applications
Within 500 metres
-
LW/26/0262 Awaiting decision
Asylum Wood Greenhill Way Haywards Heath West Sussex
Approval of Reserved Matters following Outline planning application LW/22/0517 with all matters reserved except for access for the erection of up to 375 new homes, a two-form entry primary school, burial ground, allotments, open space with associated infrastructure, landscaping, and parking areas
-
LW/25/0707 Granted
Hurst Farm Hurstwood Lane Haywards Heath West Sussex
Non-material amendment of approval LW/22/0517 - Revised access location
-
DM/26/1114 Decided
16 Birch Way Haywards Heath West Sussex RH17 7SG
Two-storey side extension and single-storey front and rear extensions to existing dwelling
-
DM/24/2354 Decided
2 George Avenue Haywards Heath West Sussex RH17 7BZ
Proposed rear single storey extension and relocation of existing steps and gate garden entrance
Other reserved matters applications
In Mid Sussex
-
DM/26/1771 Awaiting decision
Land Off Scamps Hill Scaynes Hill Road Lindfield West Sussex
A reserved matters application (access within site, appearance, layout, scale and landscaping) for 87 dwellings and associated infrastructure.
-
DM/25/0446 Decided
Burgess Hill Northern Arc, Land N And NW Of Burgess Hill, Between Bedelands Nature Reserve In The East And, Goddard's Green Waste Water Treatment Works In The West
The construction of a single carriageway link road from the tie-in with the proposed Western Bridge and Link Road (WBLR), through to the proposed tie-in with Eastern Bridge and Link Road (EBLR) including tie-ins to the existing B2036 Cuckfield Road. The primary east-west route will typically comprise of a new 6.5m carriageway with one 3m shared footway/cycleway and one 2m wide footway and two 2.75m verges. While the 6.5m wide carriageway will be consistent throughout, some sections of the primary east-west route will diverge from this typical arrangement to complement area specific requirements. The northern link to the B2036 Cuckfield Road from the proposed east-west road will consist of a new 6.5m wide carriageway and single 2m footway. The southern link to the B2036 Cuckfield Road from the proposed east-west road will consist of a new 6.5m wide carriageway and a short extension of the Green Super Highway extending to the driveway entrance servicing the existing Oak Barn Bar & Restaurant carpark. The western end of the east-west road corridor and the southern link to the B2036 Cuckfield Road will both facilitate connections to the Green Superhighway. All will be constructed to an adoptable standard, together with associated crossing points, earthworks and vegetation removal, surface water and foul drainage infrastructure, utilities corridors and diversions, road lighting, soft landscaping, including tree-planting and temporary fencing, on-street parking and provision of in-line bus stops for bus services. (Amended plans recieved 15/02/2026).
-
DM/26/1186 Awaiting decision
Land West Of Selsfield Road Ardingly West Sussex
Reserved Matters application for consideration of consider all outstanding matters (layout, scale, landscaping and appearance) in respect of outline planning permission DM/22/1575 (and the subsequent variation of conditions 2 and 11 through permission DM/23/3250). (Amended plans received 14/07/2026)
-
DM/26/0131 Awaiting decision
Land South And West Of Upper Imberhorne School Imberhorne Lane East Grinstead West Sussex
Approval of Reserved Matters following Outline Planning Permission (Ref. DM/23/2699) relating to appearance, landscaping, layout and scale for 550no. new residential units. (Drainage addendum received 02/04/2026). (Amended plans and information received 20th to 27th May showing revisions to the proposed design, landscaping, highways, housing and sustainability measures) (Surface water calculations received 24/06/2026).
-
DM/25/1128 Awaiting decision
Burgess Hill Northern Arc, Land N And NW Of Burgess Hill, Between Bedelands Nature Reserve In The East And, Goddard's Green Waste Water Treatment Works In The West
Second phase of the Western Bridge and Link Road, comprising the construction of a two-lane single carriageway road, with 3m shared surface (cyclist/pedestrian) on the west side of the highway, and a segregated 5m cycleway/footway on the east side. Connecting to the first phase of WBLR at the roundabout junction on the A2300. Provision of Western Bridge, spanning 71m, carrying the highway and cycleway/footway over the River Adur and floodplain, connecting with future phases at the eastern extent. Includes provision of access to future residential areas, signalised crossing points, earthworks, surface water and foul drainage infrastructure, utilities corridors, lighting and landscaping. (Amended plans received 22.06.2026).