Skip to content
PlanIndex Get alerts
Menu

Planning application

29 Stanley Road Manchester M16 8HS

Awaiting decision Manchester 145620/FO/2026 Full planning permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of single-storey outbuilding in rear garden to provide cycle, bin and ancillary storage

As published by the council, reference 145620/FO/2026

Application record

Reference
145620/FO/2026
Type
Full planning permission
Status
Under Consultation
Received
7 Apr 2026
Validated
7 Apr 2026
Ward
Whalley Range
Decision by
Delegated Decision
Postcode
M16 8HS

Timeline

Dates from the published record

  1. 7 Apr 2026

    Received by Manchester

  2. 20 Jul 2026

    Added to PlanIndex

  3. 30 Aug 2026

    Status changed to Under Consultation

    Previously Under Consideration.

  4. 18 Sep 2026

    Status changed to Under Consideration

    Previously Under Consultation.

  5. 8 Oct 2026

    Status changed to Under Consultation

    Previously Under Consideration.

  6. Decision

    Awaiting decision

    Decision expected by 2 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Manchester took a median of 55 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

NA Design Agent, a design practice

110 applications on PlanIndex · across 8 councils · 90% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Manchester for determination, against a statutory target of eight weeks. Over the last year Manchester decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Flat 5 29 Stanley Road Manchester M16 8HS

    116623/FO/2017 Submitted 11 Sep 2017 50 yards away

    Installation of dormer to rear to form enlarged flat

    Granted Full applications Loft or dormer 12 docs
  • 31 Stanley Road Manchester M16 8HS

    125026/TCA/2019 Submitted 3 Oct 2019 50 yards away

    Works to trees - proposed pruning works to 2 x Cherry (T1, T2 ) and a Lime (T3)

    Granted Trees 3 docs
  • 33 Stanley Road Manchester M16 8HS

    120119/FH/2018 Submitted 24 May 2018 50 yards away

    Retention of hip to gable roof conversion and installation of rear roof extension with Juliet balcony, to form additional accommodation

    Refused Householder Extension Loft or dormer 5 docs
    Domestic
  • Land To The Rear Of 5 Demesne Road Manchester M16 8HG

    143922/FO/2025 Submitted 17 Dec 2025 50 yards away

    Erection of bungalow in rear garden.

    Withdrawn Full applications 12 docs
  • 25A Stanley Road Manchester M16 8HS

    121627/TCA/2018 Submitted 19 Oct 2018 50 yards away

    Works to tree -proposed felling of a Cherry tree in front garden and a Lime tree in the rear garden

    Granted Trees 3 docs
  • 167 Withington Road Manchester M16 8EF

    115455/TCA/2017 Submitted 4 Sep 2017 50 yards away

    Works to tree - proposed felling of a cherry tree because the roots are causing damage to the driveway. Deep cracks are widening in the drive and could cause a hazard for visitors wearing stiletto heels. Concerned that damage could also be caused to my neighbour's drive.2. prune apple tree3. Prune ash tree to maintain trees good health

    Granted Trees 4 docs

In Manchester

  • PLA-2026-001258 Granted

    Vision House 100 Floats Road Manchester M23 9PL

    Installation of a multi-use games area (MUGA) to rear

    Received 6 Aug, published by the council 17 Aug 2026 Full applications
  • PLA-2026-000465 Granted

    21A Didsbury Park Manchester M20 5LH

    Erection of outbuilding (incorporating seating, dining, kitchen, spa, changing room, WC and plant room) with sunken swim spa, associated landscaping and side gate wall.

    Received 10 Jul, published by the council 20 Jul 2026 Full applications
  • PLA-2026-001705 Awaiting decision

    Oakley 188 Wilmslow Road Manchester M14 6LJ

    Partial demolition, refurbishment and conversion of existing buildings together with construction of 53no. residential dwellings (Use Class C3), along with associated hard and soft landscaping, car parking, access and associated works.

    Received 8 Oct, published by the council 10 Oct 2026 Full applications
  • PLA-2026-000769 Refused

    12 Kelstern Square Manchester M13 0XW

    Erection of a self-contained 2-bed ground floor residential dwelling to the rear of the existing property, including associated access, amenity space, refuse storage, bin storage, landscape and yard.

    Received 12 Aug, published by the council 24 Aug 2026 Full applications
  • PLA-2026-001800 Awaiting decision

    Northern Lawn Tennis Club Palatine Road Manchester M20 3YA

    Refurbishment works to the existing indoor tennis court building at Northern Lawn Tennis Club, including removal of the existing asbestos roof and replacement; replacement and alteration of rooflights; bricking up of selected windows; installation of new black louvred ventilation windows, replacement doors and mechanical ventilation system; removal of external fire escape stairs; upgrading of roof drainage; replacement of existing louvres and retained doors in black; and associated repairs and refurbishment to structural and external elements.

    Received 7 Oct, published by the council 10 Oct 2026 Full applications