144791/FO/2025

Weston Student Halls And Pendulum Hotel 78 Sackville Street Manchester M1 3BB

Awaiting decision Manchester Full planning permission

Proposal

Phased development comprising: (a) Partial removal of existing structures and erection of two buildings comprising purpose-built student accommodation (sui generis), one of 50 storeys and one of 17 storeys with an 8-storey link, together with associated amenity space, external landscaping, highways works, and change of use of the Pendulum Hotel to purpose-built student accommodation; and (b) Removal of remaining existing structures and erection of two buildings comprising purpose-built student accommodation (sui generis), one of 33 storeys and one of part-24 and part-8 storeys with a 1-storey link, together with associated amenity space, external landscaping, and highways works.

As published by the council, reference 144791/FO/2025

Timeline

Dates from the published record

  1. 16 Dec 2025

    Received by Manchester

  2. 20 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Manchester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • EIASCO/25/009 Decided

    Weston Halls & Pendulum Hotel Sackville Street Manchester M1 3BB

    Request for Scoping opinion under Part 4, Regulation 15 of The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended)

    30 Sep 2025 4m away Outline
  • EIASCO/25/013 Decided

    Plot H Sister Land Bounded By Charles Street To The South, Manchester South Junction And Altrincham Railway Viaduct And Granby Row To The North, Sackville Street To The East And Princess Street To The West Manchester

    Request for Scoping opinion under Part 4, Regulation 15 of The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended)

    28 Nov 2025 60m away Outline
  • 143741/FO/2025 Granted

    Charles Street Multi Storey Car Park (Plot H Sister) Charles Street Manchester M1 7AR

    Demolition of existing multi-storey car park and associated commercial units (retail and sui generis bar uses) to prepare site for future development.

    14 Aug 2025 61m away Full applications
  • 128535/FO/2020 Granted

    Charles Street Multi Storey Car Park Manchester

    Installation of galvanised wire mesh panels to infill open balconies and staircases and the provision of electrically operated galvanised roller shutters to the vehicles entrances; new anti-climb fencing installed around the plant roof; and new external doors are to be installed to staircases 001 and 004.

    9 Nov 2020 61m away Full applications
  • 144277/FO/2025 Granted

    Land To North Of John Garside Building 131 Princess Street Manchester M1 7DN

    Installation of temporary NMR Liquid Nitrogen Storage Compound in association with planning permission 141496/FO/2024.

    15 Oct 2025 64m away Full applications
  • 143769/FO/2025 Granted

    Faraday Tower The University Of Manchester Sackville Street Manchester

    Demolition of Faraday Tower to ground floor slab level and works to remediate/make safe the retained structure (including the erection of a perimeter hoarding) to prepare site for future development.

    19 Aug 2025 92m away Full applications

In Manchester

  • 145306/FO/2026 Granted

    24 Mount Street Manchester M2 3NX

    Installation of 2no. air conditioning units to roof.

    1 Jun 2026 Full applications
  • PLA-2026-000097 Refused

    8 Grandale Street, Manchester, M14 5WG

    Change of Use from Residential (Class C3) to 6 bed House in Multiple Occupation (Class C4).

    1 Jun 2026 Full applications
  • 143236/FO/2025 Granted

    Army Reserve Centre Ardwick Green North Manchester M12 6HD

    Erection of part three/part two storey extension to form entrance and stairway together with the formation of a roof terrace following demolition of existing extensions

    7 Jul 2025 Full applications
  • 142419/FO/2025 Granted

    Land Bound By Cross Keys Street, Goulden Street, Chadderton Street And Marshall Street New Cross Manchester M4 5ET

    Erection of 9-storey residential building (Use Class C3) comprising 104no. residential units with communal space, landscaping, infrastructure and other associated works.

    31 Mar 2025 Full applications
  • PLA-2026-000431 Granted

    302 St Mary's Road Manchester M40 0BD

    Retention of Automated Teller Machine.

    21 May 2026 Full applications