Planning application

48 Brundretts Road Manchester M21 9DE

Granted Manchester 123124/FO/2019 Full Application Consent

Works: Extension Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of rear dormer together with extension to existing rear dormer and associated elevational alterations

As published by the council, reference 123124/FO/2019

Application record

Reference
123124/FO/2019
Type
Full Application Consent
Status
Decided
Decision
Approved
Received
27 Mar 2019
Validated
27 Mar 2019
Decided
20 May 2019
Ward
Chorlton Park Ward
Decision by
Delegated Decision
Postcode
M21 9DE

Timeline

Dates from the published record

  1. 27 Mar 2019

    Received by Manchester

  2. 20 May 2019

    Decision issued: Approved

  3. 13 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Manchester

40 applications on PlanIndex · across 2 councils · 90% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 48 Brundretts Road Manchester M21 9DE

    125256/JO/2019 Submitted 24 Oct 2019 3m away

    Application to vary condition no. 2 attached to planning permission 123124/FO/2019 to allow for amendments to the layout of the ground floor flat and the dormer.

    Granted Amendments Loft or dormer 5 docs
  • 11 Groby Road Manchester M21 8AF

    122068/FH/2018 Submitted 12 Dec 2018 42m away

    Erection of single-storey side and rear extension with raised patio to rear, enlargement of basement to rear to form additional living accommodation and demolition of boundary wall to front to allow new vehicular access

    Granted Householder Extension Demolition 11 docs
    Small domestic
  • 14 Groby Road Manchester M21 9GQ

    128946/FH/2020 Submitted 30 Dec 2020 43m away

    Erection of a single storey rear/side extension to provide additional living accommodation

    Granted Householder Extension 6 docs
    Small domestic
  • 16 Napier Road Manchester M21 8AW

    128567/FH/2020 Submitted 24 Nov 2020 48m away

    Erection of a single storey side and rear extension together with a rear dormer and associated rooflights to form additional living accommodation

    Granted Householder Extension Loft or dormer 7 docs
    Small domestic
  • 22 Groby Road Manchester M21 9GQ

    CDN/25/1106 Submitted 17 Nov 2025 53m away

    Discharge of Condition 5 (privacy screen) attached to Planning Permission referenced 134394/FH/2022.

    Granted Conditions 4 docs
  • 9 Napier Road Manchester M21 8AW

    PLA-2026-001153 Submitted 20 Aug 2026 56m away

    80% historically approved · decision due ~15 Oct

    Change of Use of house from a dwellinghouse (C3) to a 4 bedroom House in Multiple Occupation (C4).

    Awaiting decision Full applications 4 docs
    Domestic

In Manchester

  • PLA-2026-001359 Awaiting decision

    Ground floor of 62-64 Reddish Lane Manchester M18 7JL

    Change of Use of the ground floor of 62-64 Reddish Lane from Class E (estate agents) to a tuition and education centre Class F1(a) including bin store and cycle store.

    2 Sep 2026 Full applications
  • PLA-2026-001326 Awaiting decision

    10 Fairfield Road Manchester M11 1EW

    Change of Use from vacant place of worship/hall (F1/F2 use), to a restaurant lounge and bar (Class E/Sui Generis), together with external alterations and installation of external plant equipment.

    2 Sep 2026 Full applications
  • PLA-2026-000525 Refused

    80 Mauldeth Road West Manchester M20 1AB

    Change of Use from shop to residential ground floor flat and associated works.

    26 Jun 2026 Full applications
  • PLA-2026-000808 Granted

    46 Withenfield Road Manchester M23 9BS

    Erection of single-storey detached dwellinghouse with associated car parking landscaping and boundary treatments.

    28 Jul 2026 Full applications
  • 144470/FO/2025 Awaiting decision

    20 Mayfield Road Manchester M16 8FT

    Erection of a single-storey rear extension to form additional accommodation, and elevational alterations to side extension.

    1 Sep 2026 Full applications