Planning application
2 - 4 Palatine Road Hampden House Manchester M20 3JA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of condition no. 2 attached to planning permission 049677 to allow the premises to open between 7.00am to 9.30pm on Mondays to Fridays and Bank Holidaysand 8.00am to 7.00pm on Saturdays and Sundays
As published by the council, reference 122190/JO/2018
Application record
- Reference
- 122190/JO/2018
- Type
- Variation or Removal of Condition
- Status
- Decided
- Decision
- Approved
- Received
- 19 Dec 2018
- Validated
- 19 Dec 2018
- Decided
- 13 Feb 2019
- Ward
- Old Moat Ward
- Decision by
- Delegated Decision
- Postcode
- M20 3JA
Timeline
Dates from the published record
-
19 Dec 2018
Received by Manchester
-
13 Feb 2019
Decision issued: Approved
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 13 February 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Flat 2 Palatine Mews 6 Palatine Road Manchester M20 3JB
Use of property as a house in multiple occupation (Use Class C4).
Granted Lawful development 6 docs -
3A Burton Road Manchester M20 3GD
Works to trees - proposed felling of dead Ash (T1) and pruning works to Ash (T2) and 2x Poplars (T3, T4)
Granted Trees 3 docs -
2-4 Palatine Road Manchester M20 3JA
99% historically approved · decision due ~15 Sep
Works to tree - proposed works to fell a dead cherry tree.
Awaiting decision Trees 2 docs -
6 Burton Road Manchester M20 3ED
Prior approval application for the change of use from Office (Class B1a) to a dwellinghouse (class C3)
Granted Prior approval 10 docsDomestic -
9 Copson Street Manchester M20 3HE
Installation of 2no. Externally Illuminated individual letter signs
Granted Advertising 9 docs -
Former Cine City 494 Wilmslow Road Manchester M20 3BG
Variation of Condition 13 attached to application 107434/FO/2014/S1 to alter the entrance to the bin store via Wilmslow Road
Granted Amendments 3 docs
Other amendment applications
In Manchester
-
144011/JO/2025 Granted
271 Oldham Road Manchester M40 7PS
Variation of planning application 127971/FO/2020 to vary conditions 2 (Specified Plans), 18 (Landscaping), 20 (Noise), and 29 (off site highways) to make elevational alterations, reduce car parking spaces and amend triggers in the conditions
-
OTH-2026-001083 Granted
Walkers Of Manchester Crabtree Lane Manchester M11 4GU
Non Material Change to planning permission reference 143419/JO/2025 to allow increase in external floor levels of +100mm, area increase by 3%, roof plan updates following detailed design of PV and Rooflights arrangement, External Wall Louvres added and alterations to boundary treatments and hard landscaping finishes.
-
PLA-2026-001061 Granted
18 Kempton Road Manchester M19 2GJ
Variation of Condition 2 (specified plans) attached to Planning Permission 145495/FH/2026 to allow changes to roof form.
-
PLA-2026-000985 Granted
Sunlight House Seventh & Eighth Floor Quay Street Manchester M3 3JZ
Variation of condition 2 (Approved Plans) and 5 (Finishes) attached to Listed Building Consent 145027/LO/2026 to reflect internal layout changes and finishes.
-
OTH-2026-001247 Granted
Birtles House Unit 1 Market Place Civic Centre Manchester M22 5RE
Non material amendment to planning permission referenced 144669/FO/2025 to allow alterations to the wording of conditions 5 (Metrolink CMP), 7 (electromagnetic compatibility plan), 9 (local labour), 13 (surface water drainage) and 31 (Bird Hazard Management Plan) in order to alter the timescales to facilitate demolition and site clearance works