Skip to content
PlanIndex Get alerts
Menu

Planning application

Waste Transfer Station To The North Of The Railway Line Off Longley Lane Manchester

Awaiting decision Manchester 120297/FO/2018 Full Application Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a waste processing facility and ancillary equipment; erection of a waste storage building and site cabin; creation of a new access point off Sharston Road; installation of weighbridge and waste storage bins

As published by the council, reference 120297/FO/2018

Application record

Reference
120297/FO/2018
Type
Full Application Consent
Status
Awaiting decision
Received
23 Oct 2018
Validated
23 Oct 2018
Ward
Northenden Ward

Timeline

Dates from the published record

  1. 23 Oct 2018

    Received by Manchester

  2. 13 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 18 December 2018, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Manchester took a median of 55 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Oakbay Design Ltd Agent, a design practice registered in Eccles

Active · incorporated 1992 · Eccles

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

37 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Manchester for determination, against a statutory target of eight weeks. Over the last year Manchester decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Waste Transfer Station To The North Of The Railway Line Longley Lane Manchester M22 4SS

    CDN/25/0827 Submitted 29 Aug 2025 50 yards away

    Discharge of Conditions 4a and 4b (office waste) and 6a and 6b (bicycle storage) attached to planning permission 120297/FO/2018

    Granted Conditions 7 docs
  • Lancaster House Harper Road Manchester M22 4RG

    123741/FO/2019 Submitted 11 Jun 2019 100 yards away

    Installation of 15m x 5.5m log cabin in the rear car park to form a prayer room

    Granted Full applications 6 docs
  • Land Off Leestone Road Manchester M22 4RN

    122698/NMC/2019 Submitted 14 Feb 2019 150 yards away

    Non material amendment application to condition 10 attached to planning permission reference 121021/FO/2018 to extend the opening hours on Monday to Fridays from 0700-1900 to 0700-2000; and Saturdays from 0900-1700 to 0700-1800

    Withdrawn Amendments 5 docs
  • Land Off Leestone Road Manchester M22 4RH

    CDN/19/0313 Submitted 12 Apr 2019 150 yards away

    Application to discharge condition no. 11 (refuse store) attached to planning permission 121021/FO/2018

    Granted Conditions 6 docs
  • Land Off Leestone Road Manchester M22 4RN

    122900/JO/2019 Submitted 6 Mar 2019 150 yards away

    Variation of condition number 2 (specified plans) and condition 10 (hours of opening) attached to planning approval reference 121021/FO/2018 to allow for amendments to the site access from Leestone Road and to extend the opening hours on Monday to Fridays from 0700-1900 to 0700-2000; and Saturdays from 0900-1700 to 0700-1800

    Granted Amendments 7 docs
  • Unit A Plot 41 Leeston Road Sharston Industrial Estate Manchester M22 4RN

    123928/JO/2019 Submitted 14 Jun 2019 150 yards away

    Variation of Condition 10 attached to planning consent 122900/JO/2019 to allow opening hours of Monday to Saturday (Including Bank Holidays) : 0700 - 2000hrs; and Sundays: 0900 - 1700hrs

    Granted Amendments 6 docs

In Manchester

  • PLA-2026-001258 Granted

    Vision House 100 Floats Road Manchester M23 9PL

    Installation of a multi-use games area (MUGA) to rear

    Received 6 Aug, published by the council 17 Aug 2026 Full applications
  • PLA-2026-000465 Granted

    21A Didsbury Park Manchester M20 5LH

    Erection of outbuilding (incorporating seating, dining, kitchen, spa, changing room, WC and plant room) with sunken swim spa, associated landscaping and side gate wall.

    Received 10 Jul, published by the council 20 Jul 2026 Full applications
  • PLA-2026-001705 Awaiting decision

    Oakley 188 Wilmslow Road Manchester M14 6LJ

    Partial demolition, refurbishment and conversion of existing buildings together with construction of 53no. residential dwellings (Use Class C3), along with associated hard and soft landscaping, car parking, access and associated works.

    Received 8 Oct, published by the council 10 Oct 2026 Full applications
  • PLA-2026-000769 Refused

    12 Kelstern Square Manchester M13 0XW

    Erection of a self-contained 2-bed ground floor residential dwelling to the rear of the existing property, including associated access, amenity space, refuse storage, bin storage, landscape and yard.

    Received 12 Aug, published by the council 24 Aug 2026 Full applications
  • PLA-2026-001800 Awaiting decision

    Northern Lawn Tennis Club Palatine Road Manchester M20 3YA

    Refurbishment works to the existing indoor tennis court building at Northern Lawn Tennis Club, including removal of the existing asbestos roof and replacement; replacement and alteration of rooflights; bricking up of selected windows; installation of new black louvred ventilation windows, replacement doors and mechanical ventilation system; removal of external fire escape stairs; upgrading of roof drainage; replacement of existing louvres and retained doors in black; and associated repairs and refurbishment to structural and external elements.

    Received 7 Oct, published by the council 10 Oct 2026 Full applications