Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The South Of Keelings Road Dengie Essex

Awaiting decision Maldon 26/05077/DET

Relates to 25/00003/FUL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Compliance with conditions notification 25/00003/FUL (Installation of a 167metre long underground cable providing a point of connection to the National Grid, for the previously granted adjoining Solar Array development (ref. 23/01236/FULM) ) Condition 4 - programme of archaeological work.

As published by the council, reference 26/05077/DET

Application record

Reference
26/05077/DET
Status
Conditions discharged
Received
10 Jun 2026
Validated
11 Jun 2026

Site history

Applications at this address on the Maldon register

This site has had 6 applications since 2023: 3 approved, 1 refused.

  • 25/00003/FUL Granted

    Land To The South Of Keelings Road Dengie Essex

    Installation of a 167metre long underground cable providing a point of connection to the National Grid, for the previously granted adjoining Solar Array development (ref. 23/01236/FULM) at Land at Dengie, Keelings Road, Southminster.

    Decided 25 Apr 2025 Full applications
  • 24/05173/DET Decided

    Land To The South Of Keelings Road Dengie Essex

    Discharge of conditions on applicaiton 23/01236/FULM (Erection of a 19 MW Solar PV Array, comprising ground mounted solar PV panels, with co-located 5 MW battery energy storage system (BESS), vehicular access from Keelings Road, internal access tracks, landscaping and associated infrastructure including security fencing, CCTV cameras, and grid connection infrastructure including transformers, substation compound buildings and cabling route to the point of connection) Condition 5 - archaeological assessment. Condition 6 - implementation of a programme of archaeological work. Condition 11 - soil management plan. Condition 18 - tree retention and protection. Condition 20 - construction environmental management plan. Condition 22 - biodiversity monitoring strategy.

    Decided 10 Jan 2025 Reserved matters
  • 24/00669/NMA Granted

    Land To The South Of Keelings Road Dengie Essex

    Application for non-material amendment following grant of 23/01236/FULM (Erection of a 19 MW Solar PV Array) Amendment sought: Condition 2 - Correction to Site Location Plan and Access Road Sections Plan. Condition 4 - Alteration to life span of development wording.

    Decided 19 Sep 2024 Amendments
  • 23/01236/FULM Granted

    Land To The South Of Keelings Road Dengie Essex

    Erection of a 19 MW Solar PV Array, comprising ground mounted solar PV panels, with co-located 5 MW battery energy storage system (BESS), vehicular access from Keelings Road, internal access tracks, landscaping and associated infrastructure including security fencing, CCTV cameras, and grid connection infrastructure including transformers, substation compound buildings and cabling route to the point of connection

    Decided 24 Apr 2024 Full applications
  • 23/00244/FULM Refused

    Land To The South Of Keelings Road Dengie Essex

    Erection of a 19 MW Solar PV Array, comprising ground mounted solar PV panels, with co-located 5 MW battery energy storage system (BESS), vehicular access from Keelings Road, internal access tracks, landscaping and associated infrastructure including security fencing, CCTV cameras, and grid connection infrastructure including transformers, substation compound buildings and cabling route to the point of connection

    Decided 3 Jul 2023 Full applications

Timeline

Dates from the published record

  1. 10 Jun 2026

    Received by Maldon

  2. 11 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. 8 Aug 2026

    Status changed to Conditions discharged

    Previously Pending consideration.

  5. Decision

    Awaiting decision

    Decision expected by 6 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Maldon took a median of 78 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 25/00003/FUL Granted

    Land To The South Of Keelings Road Dengie Essex

    Installation of a 167metre long underground cable providing a point of connection to the National Grid, for the previously granted adjoining Solar Array development (ref. 23/01236/FULM) at Land at Dengie, Keelings Road, Southminster.

    Decided 25 Apr 2025 Full applications

What happens while it is decided

This application is with Maldon for determination, against a statutory target of eight weeks. Over the last year Maldon's median decision took 78 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Maldon's portal will say. Our guide explains the common types.