Skip to content
PlanIndex Get alerts
Menu

Planning application

Osea Leisure Park Goldhanger Road Heybridge Maldon Essex CM9 4SA

Awaiting decision Maldon 25/00945/VARM Variations Major

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of condition Conditions 1, 3 and 5 on approved planning permission 24/00516/VAR (Removal of condition 11 of planning permission 18/00791/FUL (Change of Use of inner field from touring caravans occupied between 1st April - 30th September to use for stationing of Holiday Lodges, with occupation between the 1st March - 14th February each year in line with current static caravan and lodges on the wider site.)) The proposed amendments comprise a change to the layout of the approved 18 lodges and the corresponding changes in drainage and landscape strategies.

As published by the council, reference 25/00945/VARM

Application record

Reference
25/00945/VARM
Type
Variations Major
Status
Pending consideration
Received
20 Oct 2025
Validated
21 Nov 2025
Ward
Heybridge East
Parish
Heybridge East
Decision by
Delegated
Postcode
CM9 4SA

Site history

Applications at this address on the Maldon register

This site has had 3 applications since 2024: 2 approved, 0 refused.

  • 24/00517/VAR Granted

    Osea Leisure Park Goldhanger Road Heybridge Maldon Essex CM9 4SA

    Removal of condition 3 of planning permission 19/00404/FUL (Variation of condition 2 on approved planning application FUL/MAL/18/00120 to allow increase of occupation of all of the accommodation on the leisure park from 9 months to 11.5 months each year (not just the Square Slip and Lodge Park areas) excluding 15th February and 28th February (inclusive) each year.)

    Decided 21 Mar 2025 Amendments
  • 24/00518/VAR Granted

    Osea Leisure Park Goldhanger Road Heybridge Maldon Essex CM9 4SA

    Variation of condition 3 of planning permission 11/00111/FUL (Change of use of land to accommodate a camping and touring park)

    Decided 28 Mar 2025 Amendments

Timeline

Dates from the published record

  1. 20 Oct 2025

    Received by Maldon

  2. 21 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 20 February 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.

    Maldon took a median of 88 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Maldon for determination, against a statutory target of thirteen weeks. Over the last year Maldon decided full applications in a median of 176 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Maldon

  • 26/00013/FUL Refused

    Guisnes Lodge Back Road Tolleshunt D'Arcy Maldon Essex CM9 8TW

    Proposed change of use of dwelling to a SEMH residential establishment for children (age 11-18yrs old)

    8 Jan 2026 Full applications
  • 25/00866/FUL Refused

    Beresfords Estate Agents 2A Gate Street Maldon Essex CM9 5QF

    Conversion of existing outbuildings to 1no. 2 bedroom unit and 2no. 1 bedroom units, external alterations including removal of external staircase and new porch canopy's and associated parking.

    25 Sep 2025 Full applications
  • 26/00611/FUL Awaiting decision

    RSPB Old Hall Marshes Old Hall Lane Tolleshunt D'Arcy Maldon Essex CM9 8TP

    Erection of a 3.95m x 3.35m pony shelter/stable on a concrete pad, comprising concrete blockwork and external timber cladding with double doors and a roof overhang leading to an associated 4.75m x 3.35m fenced sand area.

    3 Sep 2026 Full applications
  • 26/00596/FUL Awaiting decision

    Collaroy Dreaming School Road Little Totham Maldon Essex CM9 8LD

    Conversion of agricultural building into a dwelling

    28 Aug 2026 Full applications
  • 26/00449/FUL Granted

    Southminster Church Of England Primary School Burnham Road Southminster Essex CM0 7ES

    Provision of 2no. heat pumps and construction of enclosure.

    2 Jul 2026 Full applications