Planning application
Land At Wycke Hill Maldon Essex
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Provision of infrastructure to provide electric vehicle charging facilities for six parking bays, comprising of three charger pillars and associated bollards, one feeder pillar, and one substation
As published by the council, reference 24/00313/FUL
Application record
- Reference
- 24/00313/FUL
- Type
- Full Application
- Status
- Application approved
- Decision
- Approved
- Received
- 3 Apr 2024
- Validated
- 3 Apr 2024
- Decided
- 4 Jul 2024
- Ward
- Maldon West
- Parish
- Maldon West
- Decision by
- Delegated
Timeline
Dates from the published record
-
3 Apr 2024
Received by Maldon
-
4 Jul 2024
Decision issued: Approved
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Maldon granted permission on 4 July 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Limebrook Trade Centre Wycke Hill Business Park Maldon Essex
Variation of conditions 2 (approved drawings) and 19 (no additional floorspace) on approved planning permission 21/00339/FUL (Erection of a mixed-use development comprising Class B2 (including autocentre with vehicle repair, MOT testing, servicing and associated operations) and/or specified Sui Generis uses and Class E (drive-thru coffee shop) uses together with access, servicing, car parking and associated works.)
Granted Amendments 17 docsMajor scheme -
Limebrook Trade Centre Wycke Hill Business Park Maldon Essex
Variation of conditions 2 (approved drawings) and 19 (no additional floorspace) on approved planning permission 21/00339/FUL (Erection of a mixed-use development comprising Class B2 (including autocentre with vehicle repair, MOT testing, servicing and associated operations) and/or specified Sui Generis uses and Class E (drive-thru coffee shop) uses together with access, servicing, car parking and associated works.)
Granted Full applications 17 docsMajor scheme -
Bus Shelter Wycke Hill Maldon Essex
Advertisement consent for double-sided digital displays installed at the departure end of the bus shelter. Digital displays to portray static advertising images that change every 10 seconds.
Granted Advertising -
Morrisons Petrol Station And Car Wash Wycke Hill Maldon Essex CM9 6GG
Demolition of existing car wash and jet wash and proposed extension to the existing petrol filling stations, sales building and creation of an EV charging zone, jet wash facilities, sub-station, LV panel and GRP enclosure and associated works.
Granted Full applications Extension Demolition 18 docs -
Land North And West Of Knowles Farm Wycke Hill Maldon Essex
Reserved matters application for the approval of appearance, landscaping, layout and scale for the Employment Land, identified as Phase 1b within the approved Strategic Phasing Plan for the site on approved planning application 15/01327/OUT (C3 residential development (up to 320 new homes) of mixed form, size and tenure, small scale employment development (up to 2,000sqm), community uses, a new relief road to the north of A414, strategic landscaping, pedestrian and cycle linkages, estate roads, open space, drainage and sewerage (including SUDS) and other associated development. - All matters reserved except for access.)
Granted Reserved matters New dwellingMajor scheme -
Land North And West Of Knowles Farm Wycke Hill Maldon Essex
81% historically approved · decision due ~14 May
Reserved matters application for the approval of appearance, landscaping, layout and scale for the Employment Land, identified as Phase 1b within the approved Strategic Phasing Plan for the site on approved planning application 15/01327/OUT (C3 residential development (up to 320 new homes) of mixed form, size and tenure, small scale employment development (up to 2,000sqm), community uses, a new relief road to the north of A414, strategic landscaping, pedestrian and cycle linkages, estate roads, open space, drainage and sewerage (including SUDS) and other associated development.- All matters reserved except for access.)
Awaiting decision Reserved matters New dwellingMajor scheme
Other full applications
In Maldon
-
25/00972/FUL Granted
Agricultural Building At Oak Nursery Hackmans Lane Purleigh Essex
Demolition of existing glasshouses and erection of new dwelling and associated parking area
-
26/00572/FUL Awaiting decision
32 Alexandra Road Burnham-On-Crouch Essex CM0 8BW
Erection of a two storey, 4 bedroom dwelling with associated landscaping and parking.
-
26/00314/FUL Granted
69 East Street Tollesbury Maldon Essex CM9 8QE
Proposed change of use from an office to a children residential home C2 to accommodate 3 children and a live in carer.
-
26/00565/FUL Awaiting decision
Cobbs Farm Maldon Road Goldhanger Maldon Essex CM9 8BQ
Construction of an additional livestock building for the housing of pigs at Cobbs Farm, and the construction of relating ancillary works.
-
25/00997/FUL Refused
Land Adjacent To Oak Corner Cottage Southend Road Woodham Mortimer Essex
Erection of a new self-build dwelling and associated works