Planning application
All Saints Church Of England Primary School Highlands Drive Maldon Essex CM9 6HY
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey front extension, single storey rear extension, internal remodelling and alteration works.
As published by the council, reference 22/01075/FUL
Application record
- Reference
- 22/01075/FUL
- Type
- Full Application
- Status
- Application approved
- Decision
- Approved
- Received
- 17 Oct 2022
- Validated
- 9 Nov 2022
- Decided
- 26 Jan 2023
- Ward
- Maldon North
- Parish
- Maldon North
- Decision by
- Central Area Committee
- Postcode
- CM9 6HY
Timeline
Dates from the published record
-
17 Oct 2022
Received by Maldon
-
9 Nov 2022
Validated
Checked as complete and ready for consideration.
-
26 Jan 2023
Decision issued: Approved
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Day Nursery Highlands Drive Maldon Essex CM9 6HY
Erection of a timber frame cabin adjacent to the existing nursery building to provide additional nursery accommodation, extension of existing decking, new cycle store and air con unit.
Granted Full applications Extension -
17 Highlands Drive Maldon Essex CM9 6HX
Claim for lawful development certificate for a proposed 3m rear extension with roof light, demolish existing garage and create a new side extension (garage), relocate the entrance door.
Withdrawn Lawful development Extension Loft or dormer +1 20 docs -
18 Beacon Hill Maldon Essex CM9 6HR
Replacement of existing flat roof with pitched roof and installation of composite cladding boards to front and side elevations of existing single storey front projection.
Granted HouseholderSmall domestic -
78 Highlands Drive Maldon Essex CM9 6HY
Demolish lean-to side extension. New single storey rear and side extension.
Granted Householder Extension Demolition 14 docsSmall domestic -
37D London Road Maldon Essex CM9 6HG
Part two-storey, part single-storey front/side extension with Juliet balcony and balustrade to the front elevation. Alterations to fenestration.
Refused Householder Extension Windows or glazing 16 docsSmall domestic -
Wellington House 14A Wellington Road Maldon Essex CM9 6HL
Single storey rear extension for wheelchair accessible accommodation, (requiring demolition of existing off-shot utility and porch).
Granted Householder Extension DemolitionSmall domestic
Other full applications applications
In Maldon
-
25/00972/FUL Granted
Agricultural Building At Oak Nursery Hackmans Lane Purleigh Essex
Demolition of existing glasshouses and erection of new dwelling and associated parking area
-
26/00314/FUL Granted
69 East Street Tollesbury Maldon Essex CM9 8QE
Proposed change of use from an office to a children residential home C2 to accommodate 3 children and a live in carer.
-
26/00565/FUL Awaiting decision
Cobbs Farm Maldon Road Goldhanger Maldon Essex CM9 8BQ
Construction of an additional livestock building for the housing of pigs at Cobbs Farm, and the construction of relating ancillary works.
-
25/00997/FUL Refused
Land Adjacent To Oak Corner Cottage Southend Road Woodham Mortimer Essex
Erection of a new self-build dwelling and associated works
-
25/00809/FUL Refused
Land At Oxley House Tiptree Colchester Essex
New barn building for apiculture associated with adjoining meadowland