Planning application
Madina Masjid Mosque 128 - 130 Oak Road Luton LU4 8AD
Works: Extension
Relates to 24/01091/DOC
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of single and two storey rear extension with lower ground extension to provide a Community hall, Mortuary, Library and Prayer hall. Minor material amendment of planning permission 19/00753/FUL dated 19th October 2022 and 24/01091/DOC dated 24th January 2025 (Internal layout changes, extenal metal fire escape staircase to rear elevation)
As published by the council, reference 26/01064/MMAMD
Application record
- Reference
- 26/01064/MMAMD
- Status
- Awaiting decision
- Received
- 16 Oct 2026
- Validated
- 16 Oct 2026
- Ward
- BEECH HILL
- Decision by
- Delegated Decision
- Postcode
- LU4 8AD
Site history
Applications at this address on the Luton register
This site has had 3 applications since 2024: 1 approved, 0 refused.
-
26/00420/MMAMD Awaiting decision
Madina Masjid Mosque 128 - 130 Oak Road Luton LU4 8AD
Erection of single and two storey rear extension with lower ground extension to provide a Community hall, Mortuary, Library and Prayer hall. - Minor amendments to planning application no. 19/00753/FUL dated 20th October 2022, approved plans (Condition 2) and elevations to reflect internal layout (Access to and use of buildings) and updated fire strategy requirements.
-
24/01091/DOC Granted
Madina Masjid Mosque 128 - 130 Oak Road Luton LU4 8AD
Erection of single and two storey rear extension with lower ground extension to provide a Community hall, Mortuary, Library and Prayer hall. Discharge of conditions 3 (Construction Method Statement), 4 (Materials), 5 (Travel Plan), 6 (Foul and surface water scheme), 8 (Cycle storage) and 12 (Management Plan) of Planning permission 19/00753/FUL dated 20th October 2022.
Timeline
Dates from the published record
-
16 Oct 2026
Received by Luton
-
28 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Luton took a median of 73 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
24/01091/DOC Granted
Madina Masjid Mosque 128 - 130 Oak Road Luton LU4 8AD
Erection of single and two storey rear extension with lower ground extension to provide a Community hall, Mortuary, Library and Prayer hall. Discharge of conditions 3 (Construction Method Statement), 4 (Materials), 5 (Travel Plan), 6 (Foul and surface water scheme), 8 (Cycle storage) and 12 (Management Plan) of Planning permission 19/00753/FUL dated 20th October 2022.
- Application: 19/00753/FUL (PER - Application Permitted)
Documents
Plans, drawings, consultee responses and the officer's report
27 documents on file for this application
- APPLICATION FORM
- 7490/PL/300 - MATERIAL BOARD
- 7490/PL/301 - SITE PLAN - BINS & CYCLE STORAGE
- 7490/PL/202 - PROPOSED FRONT ELEVATION
- PL02 - ENVIRONMENTAL HEALTH STATEMENT
- 7490/PL/203 - PROPOSED SIDE ELEVATION
- 7490/PL/201 - PROPOSED REAR ELEVATION
- 7490/PL/102 - PROPOSED FIRST FLOOR PLAN
- 7490/PL/200 - PROPOSED SIDE ELEVATION FROM MAPLE ROAD
- 7490/PL/101 - PROPOSED GROUND FLOOR PLAN
- 7490/PL/103 - PROPOSED ROOF PLAN
- 7490/PL/100 - PROPOSED LOWER GROUND FLOOR PLAN
- PL03 - SECURITY AND DESIGNING OUT CRIME STATEMENT
- 7490/PL/01 - SITE PLAN
- 18072-105 REV A - PROPOSED FIRST FLOOR PLAN
- 18072-12 REV A - PROPOSED VIEW
- 18072-104 REV A - PROPOSED GROUND FLOOR PLAN
- 18072-14 REV A - STREET PROFILES
- 18072-11 REV A - PROPOSED VIEW
- 18072-510 - MATERIALS BOARD
- 18072-09 REV A - PROPOSED ELEVATIONS
- 18072-10 REV A - VIEW
- 18072-08 REV A - PROPOSED ELEVATIONS
- 18072-03 REV A - PROPOSED LOWER GROUND FLOOR PLAN
- 18072-511 - SITE PLAN - BINS AND CYCLE STORAGE
- 18072-05 REV A - SITE PLAN
- PL01 - DESIGN & ACCESS STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Luton for determination, against a statutory target of eight weeks. Over the last year Luton's median decision took 73 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Luton's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Madina Masjid Mosque 128 - 130 Oak Road Luton LU4 8AD
79% historically approved · decision due ~18 Jun
Erection of single and two storey rear extension with lower ground extension to provide a Community hall, Mortuary, Library and Prayer hall. - Minor amendments to planning application no. 19/00753/FUL dated 20th October 2022, approved plans (Condition 2) and elevations to reflect internal layout (Access to and use of buildings) and updated fire strategy requirements.
Awaiting decision Amendments Extension 27 docs -
33 Ash Road Luton LU4 8AG
Request for a determination as to whether prior approval is required under Part 1 Class A of the Town and Country Planning (General Permitted Development) Order 2015 - Single storey rear extension. Depth 4m, Maximum height of extension 4m, Height to eaves 3m.
Granted Full applications Extension 3 docsSmall domestic -
50 Ivy Road Luton LU1 1DN
Erection of a single storey rear/side extension.
Refused Full applications Extension 22 docsSmall domestic -
243B Dunstable Road Luton LU4 8BW
Erection of a first floor extension to create a 2-storey building, to form an office and alterations to shopfront and fenestration
Refused Full applications Extension Windows or glazing 19 docs -
Luton Town Football Club Kenilworth Road Luton LU1 1DH
Planning permission for the retention of existing floodlights and installation of new floodlights with associated works.
Granted Full applications 34 docs -
Madina Masjid Mosque 128 - 130 Oak Road Luton LU4 8AD
Erection of single and two storey rear extension with lower ground extension to provide a Community hall, Mortuary, Library and Prayer hall. Discharge of conditions 3 (Construction Method Statement), 4 (Materials), 5 (Travel Plan), 6 (Foul and surface water scheme), 8 (Cycle storage) and 12 (Management Plan) of Planning permission 19/00753/FUL dated 20th October 2022.
Granted Conditions Extension 16 docs