Skip to content
PlanIndex Get alerts
Menu

Planning application

33 Ash Road Luton LU4 8AG

Granted Luton 23/00246/PARES Prior - Larger Household Extensions

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Request for a determination as to whether prior approval is required under Part 1 Class A of the Town and Country Planning (General Permitted Development) Order 2015 - Single storey rear extension. Depth 4m, Maximum height of extension 4m, Height to eaves 3m.

As published by the council, reference 23/00246/PARES

Application record

Reference
23/00246/PARES
Type
Prior - Larger Household Extensions
Status
Not Required
Decision
Prior Approval Not Required
Received
3 Mar 2023
Validated
3 Mar 2023
Decided
3 Apr 2023
Ward
DALLOW
Decision by
Delegated Decision
Postcode
LU4 8AG

Timeline

Dates from the published record

  1. 3 Mar 2023

    Received by Luton

  2. 3 Apr 2023

    Decision issued: Prior Approval Not Required

  3. 8 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Madina Masjid Mosque 128 - 130 Oak Road Luton LU4 8AD

    26/00420/MMAMD Submitted 23 Apr 2026 45m away

    82% historically approved · decision due ~18 Jun

    Erection of single and two storey rear extension with lower ground extension to provide a Community hall, Mortuary, Library and Prayer hall. - Minor amendments to planning application no. 19/00753/FUL dated 20th October 2022, approved plans (Condition 2) and elevations to reflect internal layout (Access to and use of buildings) and updated fire strategy requirements.

    Awaiting decision Amendments Extension 27 docs
  • 243B Dunstable Road Luton LU4 8BW

    21/00576/FUL Submitted 23 Apr 2021 94m away

    Erection of a first floor extension to create a 2-storey building, to form an office and alterations to shopfront and fenestration

    Refused Full applications Extension Windows or glazing 19 docs
  • 327, 329, 331, 333, 335, 337, 339, 341, 42, 43, & 44 Dunstable Road, Site 3 Birch Link, 57, 59 And 53 Leagrave Road Luton

    23/00157/ADV Submitted 9 Feb 2023 114m away

    Display of 15 lamppost banners.

    Granted Advertising 10 docs
  • 237 Dunstable Road Luton LU4 8BW

    26/00313/FUL Submitted 30 Mar 2026 121m away

    Installation of an ATM machine. Retrospective

    Granted Full applications 11 docs
  • 237 Dunstable Road Luton LU4 8BW

    26/00314/ADV Submitted 30 Mar 2026 121m away

    Installation of one illuminated surround sign and one illuminated logo panel. Retrospective

    Granted Advertising 12 docs
  • 176A - 178A Dunstable Road Luton LU4 8JJ

    26/00502/FUL Submitted 12 May 2026 135m away

    76% historically approved · decision due ~19 Oct

    Change of use of first floor from office to restaurant (Class E) and erection of a semi-covered pergola structure with glass balustrade to provide additional seating area.

    Awaiting decision Full applications 15 docs

In Luton

  • 26/00311/FULHH Withdrawn

    66 Hart Hill Drive Luton LU2 0AY

    Erection of single storey front, side conservatory, changing front roof from hip to gable end and raising of roof with two rear dormers, one rear and two front rooflights to facilitate a first floor extension

    30 Mar 2026 Full applications
  • 26/00224/FULHH Granted

    14 Shelley Road Luton LU4 0JA

    Erection of single storey side/rear extension together with access ramp to front and rear.

    3 Mar 2026 Full applications
  • 26/00470/FULHH Granted

    10 Rackham Drive Luton LU3 2AF

    Erection of a single storey rear extension

    5 May 2026 Full applications
  • 26/00129/FULHH Granted

    312 Old Bedford Road Luton LU2 7EJ

    Erection of a single and two storey rear extensions, roof alterations including the installation of three rear dormer windows and three front and four side rooflights.

    4 Feb 2026 Full applications
  • 26/00303/FUL Granted

    122 Ashcroft Road Luton LU2 9AX

    Erection of two x 4 bedroom dwellinghouses.

    27 Mar 2026 Full applications