Skip to content
PlanIndex Get alerts
Menu

Planning application

LA05/2026/0009/F

1, 3 & 5 Kirkwoods Road, Lisburn, BT28 3SA

Granted Lisburn and Castlereagh Full

Proposal

Demolition of existing dwelling houses and construction of one retail unit with associated site access, bulk fuels, parking, landscaping and other site works

As published by the council, reference LA05/2026/0009/F

Timeline

Dates from the published record

  1. 18 Dec 2025

    Received by Lisburn and Castlereagh

  2. 22 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • LA05/2026/0592/F Awaiting decision

    24 Magheralave Court, Lisburn, BT28 3BY

    Proposed Single Storey Side Extension

    15 Jul 2026 177m away Full applications
  • LA05/2026/0387/F Awaiting decision

    Land 5 metres east of 10 Breton Park, Lisburn, BT28 3FU

    Section 54 application to remove condition 10 of planning approval LA05/2017/0741/F: "No dwellings shall be occupied until the access path as coloured in pink on Drawing 02B date stamped 21st August 2018 has been constructed. Reason: To ensure access is provided to the adjacent open space area in the interests of residential amenity". Reason for removal: The key rationale is that planning was not approved for the regional park and no formal leisure / amenity space with safe access has been developed. Also the location of the pathway is not safe or appropriate based on the topography of the site. It is expected that any future access will be at an appropriate location along the shared eastern boundary of Breton Hall and the open space and will reflect the nature of the overall Breton Hall development and the level of expected pedestrian traffic.

    6 May 2026 383m away Full applications
  • 9 Marna Brae Park, Lisburn, BT28 3PD

    Proposed rear single storey extension to provide larger kitchen, dining room, utility room and extended bedrooms

    18 Aug 2025 472m away Full applications

In Lisburn and Castlereagh

  • LA05/2026/0606/F Awaiting decision

    69 Wellington Park Drive, Lisburn, BT67 0UP

    Proposed rear/side extension to form family room

    24 Jul 2026 Full applications
  • 9 Islandkelly Park, Lisburn, BT28 3HB

    2 storey side extension and alteration to front garden to allow for parking (Amended plans)

    19 Mar 2026 Full applications
  • 52 Laverys Bridge Road, Craigavon, BT67 0PQ

    Erection of detached garage, conversion of existing garage to living accommodation and sun lounge extension to dwelling. (Renewal of extant permission)

    3 Mar 2026 Full applications
  • LA05/2026/0343/F Withdrawn

    Public Footpath approximately 80m south east of 1 Thornhill Manor, Dunmurry

    Proposed installation of telephone kiosk on public footpath

    29 Apr 2026 Full applications
  • LA05/2026/0598/F Awaiting decision

    13 Richmond Court, Lisburn, BT27 4QU

    Internal alterations and loft conversion which includes dormer extension to rear.

    20 Jul 2026 Full applications