Skip to content
PlanIndex Get alerts
Menu

Planning application

21 Mayfields Lisburn

Granted Lisburn and Castlereagh LA05/2021/0655/F Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey extension to rear of dwelling

As published by the council, reference LA05/2021/0655/F

Application record

Reference
LA05/2021/0655/F
Type
Full
Status
Determined
Decision
Granted
Received
10 Jun 2021
Validated
11 Jun 2021
Decided
25 Aug 2021
Ward
Magheralave

Timeline

Dates from the published record

  1. 10 Jun 2021

    Received by Lisburn and Castlereagh

  2. 11 Jun 2021

    Validated

    Checked as complete and ready for consideration.

  3. 25 Aug 2021

    Decision issued: Granted

  4. 17 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy

22 applications on PlanIndex · across 6 councils · 95% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Lisburn and Castlereagh granted permission on 25 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 9 Marna Brae Park, Lisburn, BT28 3PD

    LA05/2025/0621/F Submitted 18 Aug 2025 129m away

    Proposed rear single storey extension to provide larger kitchen, dining room, utility room and extended bedrooms

    Granted Full applications Extension 9 docs
    Small domestic
  • 69 Meadow Green, Lisburn, BT28 3PB

    LA05/2025/0646/F Submitted 8 Sep 2025 181m away

    2 storey rear kitchen and bedroom extension including new first floor windows to side elevation

    Granted Full applications Extension Windows or glazing 12 docs
  • 101 Magheralave Meadows, Lisburn, BT28 3NT

    LA05/2024/0561/F Submitted 24 Jul 2024 242m away

    Proposed attic conversion to existing two storey dwelling to include new rear dormer window

    Granted Full applications Loft or dormer Windows or glazing 9 docs
    Domestic
  • 165 Belsize Road, Lisburn, BT27 4BT

    LA05/2025/0917/F Submitted 18 Dec 2025 355m away

    Demolition of single storey to front, side and rear and rebuilding single storey with higher flat roof.

    Granted Full applications Demolition 9 docs
    Small domestic
  • 6 Magheralave Meadows, Lisburn, BT28 3NT

    LA05/2024/0684/NMC Submitted 23 Sep 2024 368m away

    Amend wall finish to proposed extension from sandstone render to red/brown brick to match existing main dwelling

    Granted Amendments Extension 6 docs
    Domestic
  • 1, 3 & 5 Kirkwoods Road, Lisburn, BT28 3SA

    LA05/2026/0009/F Submitted 18 Dec 2025 403m away

    Demolition of existing dwelling houses and construction of one retail unit with associated site access, bulk fuels, parking, landscaping and other site works

    Granted Full applications Demolition 41 docs
    Domestic

In Lisburn and Castlereagh

  • 12 The Hermitage, Dunmurry, Belfast, BT17 9NH

    Demolition of existing sunroom to rear, construction of a single-storey rear ground floor extension, comprising of a new Kitchen/Living/Dining room. Internal reconfigurations to include a new snug/study and utility room.

    8 Oct 2025 Full applications
  • Millars Lane WwPS 5 Millmount Quarry Close, Dundonald, BT16 1YT

    A wastewater storage tank for the existing Millars Lane Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a water booster set, telemetry and lighting aerial above ground. Other works include a 2.4m high paladin fence, access gate and associated site and access works.

    4 Feb 2025 Full applications
  • LA05/2026/0697/F Awaiting decision

    12 Culross Place, Belfast, BT16 2SN

    Proposed single storey extension to rear

    2 Sep 2026 Full applications
  • LA05/2026/0695/F Awaiting decision

    330m East of 24 Eglantine Road, Lisburn

    Dwelling and garage to replace vacant/derelict farm buildings (formerly pig crews)

    2 Sep 2026 Full applications
  • LA05/2026/0701/F Awaiting decision

    3 Breda Park, Belfast, BT8 6JR

    Construction of a two storey extension to gable and single storey extension to rear of existing property together with associated site works and landscaping.

    2 Sep 2026 Full applications