Planning application
151-159 Moira Road, Lisburn, BT28 1RW
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Condition 4 previously approved under LA05/2019/0961/F
As published by the council, reference LA05/2025/0893/DC
Application record
- Reference
- LA05/2025/0893/DC
- Type
- Discharge of Condition
- Status
- Consultation Open
- Received
- 9 Dec 2025
- Validated
- 9 Dec 2025
- Ward
- Knockmore
- Postcode
- BT28 1RW
Timeline
Dates from the published record
-
9 Dec 2025
Received by Lisburn and Castlereagh
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lisburn and Castlereagh took a median of 100 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Fleming Mounstephen Planning Agent, a planning consultancy registered in Co Down
Active · incorporated 2007 · Co Down
45 applications on PlanIndex · across 8 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Lisburn and Castlereagh for determination, against a statutory target of eight weeks. Over the last year Lisburn and Castlereagh decided condition discharge and variation applications in a median of 84 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
8 Benvisteen Park, Lisburn, BT28 1RL
Single-storey rear extension (Retrospective)
Granted Full applications Extension 13 docsSmall domestic -
76c Tirowen Drive, Lisburn, BT28 1SD
Single storey rear extension to provide accessible bedroom for person with disabilities.
Granted Full applications Extension 7 docsSmall domestic -
122 Tirowen Drive, Lisburn, BT28 1RX
Non material change application to planning approval LA05/2025/0056/F : In the initial application the northern side elevation, along the boundary with number 120 was to be constructed with a silver/ grey engineering brick, due to the narrow space and difficulty in applying a dash render. However we have be granted permission by the neighbour to temporarily remove/ replace the boundary fence and are now looking to apply the dry dash render to match the existing property and the rest of the extension.
Granted Amendments Extension 6 docsSmall domestic -
Lands at 160 Moira Road, Lisburn
Discharge of conditions 13,14,15 and 17 of planning approval LA05/2022/0830/F.
Granted Conditions 9 docs -
Lands at 160 Moira Road, Lisburn.
Discharge of condition 13 previously approved application under LA05/2024/07345/F
Granted Conditions 7 docs -
Lands at 160 Moira Road, Lisburn.
Discharge of Conditions 24 and 25 of planning application LA05/2024/0734/F: Remediation Validation Report prepared by RSK
Granted Conditions 7 docs
Other condition discharge and variation applications
In Lisburn and Castlereagh
-
LA05/2025/0763/DC Granted
New build site is located approximately 40m west of 34 Rock Road (provisionally designated as No.35).
Request for Discharge of Conditions 2 and 3 listed within Approval of Reserved Matters application no. LA05/2023/0277/RM as works have now been carried out. Scaled site plan and photographs have been provided as part of this application.
-
LA05/2026/0423/DC Granted
Lands approx 160m east of 39 Fairfield’s Glen, BT28 3SE, lands approx 114m south east of 50-58 (even no’s) Fairfield’s Glen
Discharge of condition 2 of planning approval LA05/2025/0635/F- details of previous approval and evidence of sight lines installed
-
LA05/2026/0765/DC Awaiting decision
Lands approximately 500 metres west of 37 Colinglen Road, Dunmurry, Belfast, BT17 0LP
Discharge of Condition 9 of LA05/2023/0149/F: Bat Mitigation and Monitoring Plan (BMMP)
-
LA05/2026/0770/DC Awaiting decision
Lands 300m to the south east of 206 Millmount Road Dundonald BT16 1UT and 1-8 Millmount Chase Dundonald BT16 1WL
Conditions 23 and 26: Verification Report (Plots 21,22,24,25,26).
-
LA05/2026/0744/DC Awaiting decision
Existing Millars Lane Wastewater Pumping Station (WwPS) at Millars Lane, Dundonald
(4) No site works of any nature or development shall take place until a programme of archaeological work has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Lisburn and Castlereagh City Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: • The identification and evaluation of archaeological remains within the site; • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and • Preparation of the digital, documentary and material archive for deposition.