Planning application
LA05/2025/0893/DC
151-159 Moira Road, Lisburn, BT28 1RW
Proposal
Discharge of Condition 4 previously approved under LA05/2019/0961/F
As published by the council, reference LA05/2025/0893/DC
Timeline
Dates from the published record
-
9 Dec 2025
Received by Lisburn and Castlereagh
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Lisburn and Castlereagh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
LA05/2025/0740/NMC Granted
122 Tirowen Drive, Lisburn, BT28 1RX
Non material change application to planning approval LA05/2025/0056/F : In the initial application the northern side elevation, along the boundary with number 120 was to be constructed with a silver/ grey engineering brick, due to the narrow space and difficulty in applying a dash render. However we have be granted permission by the neighbour to temporarily remove/ replace the boundary fence and are now looking to apply the dry dash render to match the existing property and the rest of the extension.
-
LA05/2026/0284/DC Decided
Lands at 160 Moira Road, Lisburn.
Discharge of condition 13 previously approved application under LA05/2024/07345/F
-
LA05/2026/0411/DC Decided
Lands at 160 Moira Road, Lisburn.
Discharge of Conditions 24 and 25 of planning application LA05/2024/0734/F: Remediation Validation Report prepared by RSK
-
LA05/2025/0649/MDPA Decided
Lands at 160 Moira Road, Lisburn
Discharge of Condition 3.2- Commencement of development- Planning obligation under Section 76 of the Planning Act (Northern Ireland) 2011 relating to planning application LA05/2022/0830/F- re lands at Moira Road, Lisburn
-
LA05/2026/0021/DC Decided
Lands at 160 Moira Road, Lisburn.
Discharge of Condition 9 of Planning Permission LA05/2024/0734/F- Submission of Landscape Phasing Plan
-
LA05/2026/0020/DC Decided
Lands at 160 Moira Road, Lisburn.
Discharge of Condition 26 of planning permission LA05/2024/0734/F- submission of a Vibration Impact Assessment
Other conditions applications
In Lisburn and Castlereagh
-
LA05/2026/0605/DC Awaiting decision
Land at and to the north of 360 Saintfield Road (including 350, 352 Saintfield Road) Castlereagh, Belfast. (Zoning MCH 03/08 and MCH 03/10)
Discharge of condition 24: development shall not begin until drainage works have been carried out to the satisfaction of the Council in agreement with NI Water. Provision of a Drainage Assessment and Drainage Layout
-
LA05/2026/0604/DC Awaiting decision
Land at and to the north of 360 Saintfield Road (including 350, 352 Saintfield Road) Castlereagh, Belfast. (Zoning MCH 03/08 and MCH 03/10)
Discharge of condition 13 of Y/2009/0407/F. No development shall take place until measures have been agreed in writing with the Council to protect those trees to be retained within the site from damage during construction works. The agreed measures shall be put in place before the commencement of development and retained throughout the construction period. Provided: tree protection fencing details and plan showing location; photographs of measures erected on site.
-
LA05/2026/0603/DC Awaiting decision
Lands north of Ballymaconaghy Road including No's 14 & 22-24 Ballymaconaghy Road, Knockbreckan, Belfast, BT8 6SB
Submission of Post Installation Play Area Inspection Report to demonstrate that the play park, as approved under LA05/2025/0052/DC, has been subsequently installed in line with the requirements of Condition 26 of LA05/2022/1170/F
-
LA05/2026/0419/DC Decided
126 Hillsborough Road, Lisburn, BT28 1JZ
Discharge of condition 25 of planning approval LA05/2022/0018/F Prior to works commencing on site, all existing trees shown on Layout Plan, drawing no.25a, as being retained shall be protected in accordance with British Standard 5837:2012 Trees in relation to design, demolition and construction – Recommendations. No retained tree shall be cut down, uprooted or destroyed, or have its roots damaged within the crown spread nor shall arboricultural work or tree surgery take place on any retained tree other than in accordance with the approved plans and particulars, without the written approval of the Planning Authority
-
LA05/2026/0591/DC Awaiting decision
Lands north of Ballymaconaghy Road including No's 14 & 22-24 Ballymaconaghy Road Knockbreckan, Belfast, BT8 6SB
Discharge of condition 15 previously approved under LA05/2022/1170/F