Skip to content
PlanIndex Get alerts
Menu

Planning application

Lands approximately 500 metres west of 37 Colinglen Road, Dunmurry, Belfast, BT17 0LP

Awaiting decision Lisburn and Castlereagh LA05/2026/0765/DC Discharge of Condition

Relates to LA05/2023/0149/F

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Condition 9 of LA05/2023/0149/F: Bat Mitigation and Monitoring Plan (BMMP)

As published by the council, reference LA05/2026/0765/DC

Application record

Reference
LA05/2026/0765/DC
Type
Discharge of Condition
Status
Valid
Received
29 Sep 2026
Validated
29 Sep 2026
Ward
Stonyford
Postcode
BT17 0LP

Timeline

Dates from the published record

  1. 29 Sep 2026

    Received by Lisburn and Castlereagh

  2. 1 Oct 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 24 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Lisburn and Castlereagh took a median of 100 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Lands approximately 500 metres west of 37 Colinglen Road, Dunmurry, Belfast, BT17 0LP (amended address)

    Proposed replacement of an existing wind turbine (with 24.5m hub height and 23m rotor diameter) with a wind turbine (with 40m hub height and 44m rotor diameter)

    Submitted 13 Feb 2023 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Lisburn and Castlereagh for determination, against a statutory target of eight weeks. Over the last year Lisburn and Castlereagh decided condition discharge and variation applications in a median of 84 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Lisburn and Castlereagh

  • New build site is located approximately 40m west of 34 Rock Road (provisionally designated as No.35).

    Request for Discharge of Conditions 2 and 3 listed within Approval of Reserved Matters application no. LA05/2023/0277/RM as works have now been carried out. Scaled site plan and photographs have been provided as part of this application.

    Received 23 Oct, published by the council 29 Jul 2026 Conditions
  • Lands approx 160m east of 39 Fairfield’s Glen, BT28 3SE, lands approx 114m south east of 50-58 (even no’s) Fairfield’s Glen

    Discharge of condition 2 of planning approval LA05/2025/0635/F- details of previous approval and evidence of sight lines installed

    Received 18 May, published by the council 29 Jul 2026 Conditions
  • LA05/2026/0770/DC Awaiting decision

    Lands 300m to the south east of 206 Millmount Road Dundonald BT16 1UT and 1-8 Millmount Chase Dundonald BT16 1WL

    Conditions 23 and 26: Verification Report (Plots 21,22,24,25,26).

    Received 29 Sep, published by the council 1 Oct 2026 Conditions
  • LA05/2026/0744/DC Awaiting decision

    Existing Millars Lane Wastewater Pumping Station (WwPS) at Millars Lane, Dundonald

    (4) No site works of any nature or development shall take place until a programme of archaeological work has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Lisburn and Castlereagh City Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: • The identification and evaluation of archaeological remains within the site; • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and • Preparation of the digital, documentary and material archive for deposition.

    Received 22 Sep, published by the council 25 Sep 2026 Conditions
  • Lands at 70 Belfast Road, Lisburn, BT27 4AU

    Submission of TSA Cover letter to notify of remediation works commencing in line with the requirements of condition 15 of LA05/2025/0384/F

    Received 30 Jul, published by the council 7 Aug 2026 Conditions