Planning application

University Of Leeds Mechanical Engineering Woodhouse Lane Woodhouse Leeds LS2 9JT

Awaiting decision Leeds 26/9/00151/MOD

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement of doors and fenestration to existing entrance - NON MATERIAL AMENDMENT TO 25/02952/FU - Amendment to the colour proposed for the curtain walling and revolving door to the new entrance for the School of Mechanical Engineering.

As published by the council, reference 26/9/00151/MOD

Application record

Reference
26/9/00151/MOD
Status
Current
Validated
29 Sep 2026
Postcode
LS2 9JT

Site history

Applications at this address on the Leeds register

This site has had 2 applications since 2023: 1 approved, 0 refused.

  • 23/9/00024/MOD Granted

    University Of Leeds Mechanical Engineering Woodhouse Lane Woodhouse Leeds LS2 9JT

    New internal mezzanine floor replacement of existing roof top vents, removal of existing external pipework, additional grills within the facade, replacement solar shading film to glazing and alterations to the existing roller shutter door NON MATERIAL AMENDMENT to 21/08297/FU - Amended elevation to suit provision of additional natural vents. Previously approved new section curtain wall no longer required and existing roller shutter door is to be replaced with new matching shutter.

    Decided 17 Mar 2023 Amendments

Timeline

Dates from the published record

  1. 29 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  2. 1 Oct 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 24 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Leeds took a median of 51 days over the applications it decided in the last year.

What happens while it is decided

This application is with Leeds for determination, against a statutory target of eight weeks. Over the last year Leeds's median decision took 51 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Leeds's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles