Planning application
Sandbeck Lane At Swinnow Park Wetherby
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Consent, agreement or approval required by condition 34 (Sustainability Statement) of Planning Application 23/07190/FU
As published by the council, reference 26/05465/COND
Application record
- Reference
- 26/05465/COND
- Category
- Conditions
- Status
- Current
- Validated
- 29 Sep 2026
Site history
Applications at this address on the Leeds register
This site has had 7 applications since 2026: 2 approved, 1 refused.
-
26/05466/COND Awaiting decision
Sandbeck Lane At Swinnow Park Wetherby
Consent, agreement or approval required by conditions 12 (CEMP - Biodiversity), 13 (BNG HMMH), 16 (Bat Bird Enhancements) and 17 (Ditch EDS) of Planning Application 23/07190/FU
-
26/05463/COND Awaiting decision
Sandbeck Lane At Swinnow Park Wetherby
Consent, agreement, or approval required by condition 19 (bus shelter details) of application 23/07190/FU
-
26/05015/COND Awaiting decision
Sandbeck Lane At Swinnow Park Wetherby
Consent agreement or approval required by conditions 26 (foul water drainage) and 29 (temporary drainage measures) of planning application 23/07190/FU
-
26/04669/COND Granted
Sandbeck Lane At Swinnow Park Wetherby
Consent, agreement or approval required by condition 32 (heat hub connection) to previously approved planning application 23/07190/FU
-
26/04668/COND Refused
Sandbeck Lane At Swinnow Park Wetherby
Consent, agreement, or approval required by condition 24 (statement of Construction Practice) of previously approved planning application 23/07190/FU
-
26/04293/COND Granted
Sandbeck Lane At Swinnow Park Wetherby
Consent, agreement or approval required by conditions 3 (roofing material) and 22 (EV charging) to planning application 23/07190/FU
Timeline
Dates from the published record
-
29 Sep 2026
Validated
Checked as complete and ready for consideration.
-
8 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Leeds took a median of 51 days over the applications it decided in the last year.
What happens while it is decided
This application is with Leeds for determination, against a statutory target of eight weeks. Over the last year Leeds decided condition discharge and variation applications in a median of 50 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Leeds
-
26/04835/COND Granted
Springfield House Hyde Street Woodhouse Leeds LS2 9LH
Consent, agreement or approval required by conditions 26 (Protection for Bats) and 27 (Biodiversity General Enhancements) of Planning Application 23/06280/FU
-
26/05637/COND Granted
Land At Former Airedale Mills Moss Bridge Works Town Street Rodley Leeds LS13 1HP
Consent, agreement or approval required by condition 3 (Materials inc surfacing and boundaries) of Planning Application 25/05605/RM
-
26/05400/COND Refused
Broomfield South SILC Broom Place Belle Isle Leeds LS10 3JP
Consent, agreement or approval required by condition 45 (Concrete Slab) to Planning Application 25/06099/FU
-
26/05446/COND Granted
Brownberrie School 27 Church Street Boston Spa Wetherby LS23 6DW
Consent, agreement or approval required by condition 5 (statement of demolition practice) and 10 (bat licence) to planning application 25/05757/FU
-
26/05105/COND Refused
216 High Street Boston Spa Wetherby LS23 6AD
Consent, agreement or approval required by conditions 3 (Materials) and 4 (Window and door specification) of Planning Application 25/02183/FU