Skip to content
PlanIndex Get alerts
Menu

Planning application

31 Station Road Methley Leeds LS26 9ER

Awaiting decision Leeds 26/04825/FU Full Planning Application

Works: Extension Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Part single, part first floor side extension. Replacing all windows throughout and alterations to first floor side window

As published by the council, reference 26/04825/FU

Application record

Reference
26/04825/FU
Type
Full Planning Application
Status
Current
Received
3 Sep 2026
Validated
3 Sep 2026
Ward
Kippax & Methley
Decision by
Delegated Decision
Postcode
LS26 9ER

Comment by 27 September 2026

The council is taking comments on this application until then. Have your say on Leeds's portal.

Timeline

Dates from the published record

  1. 3 Sep 2026

    Received by Leeds

  2. 5 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 29 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Leeds took a median of 52 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Leeds for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21 Station Road Methley Leeds LS26 9ER

    25/07029/FU Submitted 2 Jan 2026 44m away

    Single storey rear extension

    Granted Full applications Extension 8 docs
    Small domestic
  • 3 Albert Place Methley Leeds LS26 9EN

    24/05119/FU Submitted 13 Sep 2024 105m away

    Single storey rear extension following the demolition of existing rear conservatory.

    Granted Full applications Extension Demolition 7 docs
    Small domestic
  • 16 The Hollings Methley Leeds LS26 9EJ

    26/02496/CLP Submitted 1 May 2026 188m away

    Certificate of Proposed Lawful Development for an extension to the gable, dormer window to the rear; removal of chimney and alterations to soil and vent pipe and rooflights to the front

    Granted Lawful development Extension Loft or dormer +1 2 docs
  • 5 Whitecross Grove Methley Leeds LS26 9FA

    26/04061/FU Submitted 24 Jul 2026 248m away

    83% historically approved · decision due ~18 Sep

    Retrospective application for Installation of 3 air to air heat pumps

    Awaiting decision
  • Station Road Methley Leeds LS26 9ET

    19/9/00045/MOD Submitted 11 Feb 2019 254m away

    Substitution of Dwellings from Approval 15/04604/RM Pursuant to 15/07360/OT With the addition of 5 Dwellings - NON MATERIAL AMENDMENT to 17/06939/RM - amendment of Plots 177, 178, 179 and 180 to accomate the required Yorkshire Water Easement (5.5m) that runs between Plots 178 and 179

    Granted Amendments 3 docs
    Several homes
  • Station House Station Road Methley Leeds LS26 9ET

    17/9/00313/MOD Submitted 20 Dec 2017 254m away

    Outline Application for the erection of residential development - NON MATERIAL AMENDMENT to 15/04604/RM - Plot 207 & 208 moving 1.2m south, plot 208 will revert to front parking rather than side parking.

    Granted Amendments New dwelling 1 doc

In Leeds

  • 26/02683/FU Granted

    Burton Grange Burton Crescent Headingley Leeds LS6 4DN

    Variation of condition 1 (Approved plans) to previously approved Planning Application 26/00918/FU for the addition of two windows to the North West facing elevation (Elevation 02)

    20 May 2026 Full applications
  • 25/00110/FU Granted

    Land Rear Of 31 Back Lane New Farnley Leeds LS12 5HN

    Demolition of existing barn and replaced with a single dwelling (C3) using the same footprint and massing.

    16 Jan 2025 Full applications
  • 26/04708/FU Awaiting decision

    Howley Beck Cottage 201 Scotchman Lane Morley Leeds LS27 0PA

    Demolition of existing side extensions; construction of part single-storey, part two-storey side and rear extension; conversion of integrated garage to form habitable space; new raised terrace and steps to side

    4 Sep 2026 Full applications
  • 26/04774/FU Awaiting decision

    Former Allotments Off Bruntcliffe Road Morley Leeds LS27 0QQ

    Variation of condtion 2 (approved plans) to approved planning application 26/00905/FU (Variation of condition 2 (Approved Plans) to previously approved application 24/06291/FU (Erection of 45 residential dwellings with associated access and landscaping) to allow updated house types plans to reflect the new developer) for alterations to approved house types and rewording of supporting CEMP document to align with Plan for routes of access to site

    4 Sep 2026 Full applications
  • 26/04771/FU Awaiting decision

    61 - 69 Town Street Horsforth Leeds LS18 5BP

    Alterations associated with fit out of cafe unit, including new louvred grilles, wall mounted condensers to the rear

    3 Sep 2026 Full applications