Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Albert Place Methley Leeds LS26 9EN

Granted Leeds 24/05119/FU Full Planning Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension following the demolition of existing rear conservatory.

As published by the council, reference 24/05119/FU

Application record

Reference
24/05119/FU
Type
Full Planning Application
Status
Decided
Decision
Approved
Received
13 Sep 2024
Validated
13 Sep 2024
Decided
19 Nov 2024
Ward
Kippax & Methley
Decision by
Delegated Decision
Postcode
LS26 9EN

Timeline

Dates from the published record

  1. 13 Sep 2024

    Received by Leeds

  2. 19 Nov 2024

    Decision issued: Approved

  3. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21 Station Road Methley Leeds LS26 9ER

    25/07029/FU Submitted 2 Jan 2026 93m away

    Single storey rear extension

    Granted Full applications Extension 8 docs
    Small domestic
  • 31 Station Road Methley Leeds LS26 9ER

    26/04825/FU Submitted 3 Sep 2026 105m away

    81% historically approved · decision due ~29 Oct

    Part single, part first floor side extension. Replacing all windows throughout and alterations to first floor side window

    Awaiting decision Full applications Extension Windows or glazing 5 docs
  • 16 The Hollings Methley Leeds LS26 9EJ

    26/02496/CLP Submitted 1 May 2026 110m away

    Certificate of Proposed Lawful Development for an extension to the gable, dormer window to the rear; removal of chimney and alterations to soil and vent pipe and rooflights to the front

    Granted Lawful development Extension Loft or dormer +1 2 docs
  • 32 Leeds Road Methley Leeds LS26 9EQ

    26/02827/TR Submitted 18 May 2026 181m away

    Beech (T1): 5 - 6m Crown lift. Branches drawn back from property by 2m to provide 2 - 3m clearance. 10% thin crown. (Not applying for, but also included - deadwood removal).

    Split decision Trees 8 docs
  • 24 Leeds Road Methley Leeds LS26 9EQ

    26/00180/FU Submitted 20 Apr 2026 242m away

    Conversion to garage to form store and habitable room, incorporating blocking up of entrance to rear and new side window

    Refused Full applications Windows or glazing 6 docs
  • 5 Whitecross Grove Methley Leeds LS26 9FA

    26/04061/FU Submitted 24 Jul 2026 253m away

    83% historically approved · decision due ~18 Sep

    Retrospective application for Installation of 3 air to air heat pumps

    Awaiting decision

In Leeds

  • 26/02683/FU Granted

    Burton Grange Burton Crescent Headingley Leeds LS6 4DN

    Variation of condition 1 (Approved plans) to previously approved Planning Application 26/00918/FU for the addition of two windows to the North West facing elevation (Elevation 02)

    20 May 2026 Full applications
  • 25/00110/FU Granted

    Land Rear Of 31 Back Lane New Farnley Leeds LS12 5HN

    Demolition of existing barn and replaced with a single dwelling (C3) using the same footprint and massing.

    16 Jan 2025 Full applications
  • 26/04708/FU Awaiting decision

    Howley Beck Cottage 201 Scotchman Lane Morley Leeds LS27 0PA

    Demolition of existing side extensions; construction of part single-storey, part two-storey side and rear extension; conversion of integrated garage to form habitable space; new raised terrace and steps to side

    4 Sep 2026 Full applications
  • 26/04774/FU Awaiting decision

    Former Allotments Off Bruntcliffe Road Morley Leeds LS27 0QQ

    Variation of condtion 2 (approved plans) to approved planning application 26/00905/FU (Variation of condition 2 (Approved Plans) to previously approved application 24/06291/FU (Erection of 45 residential dwellings with associated access and landscaping) to allow updated house types plans to reflect the new developer) for alterations to approved house types and rewording of supporting CEMP document to align with Plan for routes of access to site

    4 Sep 2026 Full applications
  • 26/04771/FU Awaiting decision

    61 - 69 Town Street Horsforth Leeds LS18 5BP

    Alterations associated with fit out of cafe unit, including new louvred grilles, wall mounted condensers to the rear

    3 Sep 2026 Full applications