Skip to content
PlanIndex Get alerts
Menu

Planning application

Unit 1 And 1A Maybrook Industrial Estate Castleton Road Armley Leeds LS12 2EL

Awaiting decision Leeds 26/04585/FU

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Application record

Reference
26/04585/FU
Status
Current
Validated
25 Aug 2026
Postcode
LS12 2EL

Timeline

Dates from the published record

  1. 25 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  2. 27 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Leeds took a median of 52 days over the applications it decided in the last year.

What happens while it is decided

This application is with Leeds for determination, against a statutory target of eight weeks. Over the last year Leeds's median decision took 52 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Leeds's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Unit 5 Velocity Point Castleton Road Armley Leeds LS12 2EE

    25/06552/TR Submitted 7 Nov 2025 116m away

    1 Maple: Prune back from the building to give 2-3m clearance. the canopy pruned back is the north-east of the tree. Crown spread before works is 9-10m, after works is 8-9m. 1 Ash: Removed to ground level as it is showing of ash die back and has deadwood throughout the crown. 1 Alder: The north-east crown of this tree it to be pruned back by 2-3m to give enough clearance from the building. Crown spread at beginning of works is 12-13m, after works is completed spread would be 11-12m. all works carried out to BS3998.

    Granted Trees 8 docs
  • Velocity Point Castleton Road Armley Leeds

    24/06557/TR Submitted 14 Nov 2024 159m away

    G1 - Remove front row of Laurel encroaching on sub-station G2 - Remove dead Elder and Cherry against fence line G3 - Crown raise mixed group of trees and prune back to wall to facilitate 4m clearance from adjacent road way. G4 - Remove self-seeded Cherry and Maple, remove Ivy off wall G5 - Prune back group to boundary line G6 - Coppice all Hazel to appox 300mm, remove self-seeded cherry saplings G7 - Crown raise trees along roadside entrance to approx 4m G8 - Remove 1no Ash, 1no Maple, sever Ivy on trees to be retained G9 - Crown raise 4no Italian Alder to 4m, reduce back from adjacent unit to maintain 2m clearance.

    Split decision Trees 5 docs
    Small domestic
  • Suite 2B Crown House 94 Armley Road Armley Leeds LS12 2EJ

    25/05994/FU Submitted 17 Nov 2025 173m away

    Change of use of an office (Class E(g)(i) to a taxi office for administrative purposes only (sui generis)

    Granted Full applications 8 docs
  • Aire Place Mills 143 Kirkstall Road Burley Leeds LS3 1JL

    25/02120/FU Submitted 1 Apr 2025 313m away

    81% historically approved · decision due ~27 May

    Demolition of existing buildings, construction of 100 houses (Use Class C3), and other associated works

    Awaiting decision Full applications Demolition 123 docs
    Major scheme
  • 44 Abbott View Armley Leeds LS12 2JN

    26/01213/FU Submitted 4 Mar 2026 336m away

    Demolition of garage and construction of two storey side extension

    Granted Full applications Extension Demolition 4 docs
  • Former Arla Foods Depot 87 - 91 Kirkstall Road Burley Leeds

    26/9/00004/MOD Submitted 16 Jan 2026 343m away

    79% historically approved · decision due ~13 Mar

    Demolition of existing buildings and structures; construction of 618 residential dwellings (C3) and flexible commercial space (E and F1); associated refuse and plant infrastructure, landscaping, new public realm and open space - NON MATERIAL AMENDMENT TO 22/02505/FU - - Updated door positions across all blocks. - Changes to curtain wall design intent (addition of mullions, transoms and louvered panels to provide ventilation to amenity areas). - Development of louvered screens to undercroft and amenity spaces across all blocks. - Addition of stairs, landing and ramp to serve Block F substation as it is required to be raised to at least flood safe level. - Landscape changes - General tweaks to landscaping, Parking space locations (number maintained), EV Charger positions, External substation updates.

    Awaiting decision Amendments Demolition 13 docs