Skip to content
PlanIndex Get alerts
Menu

Planning application

Woodlesford Primary School Church Street Woodlesford Leeds LS26 8RD

Awaiting decision Leeds 26/03671/FU Full Planning Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of air source heat pumps mounted on associated new hardstanding, with associated works and enclosure

As published by the council, reference 26/03671/FU

Application record

Reference
26/03671/FU
Type
Full Planning Application
Status
Current
Received
15 Jul 2026
Validated
15 Jul 2026
Ward
Rothwell
Decision by
Delegated Decision
Postcode
LS26 8RD

Comment by 18 September 2026

The council is taking comments on this application until then. Have your say on Leeds's portal.

Timeline

Dates from the published record

  1. 15 Jul 2026

    Received by Leeds

  2. 20 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 9 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Leeds took a median of 51 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

  • - HIGHWAYS TEAM Consultee · 30 Jul 2026
  • - FLOOD RISK MANAGEMENT Consultee · 17 Jul 2026
  • DESIGN AND ACCESS STATEMENT BackGround Papers · 15 Jul 2026
  • LOCATION AND BLOCK PLANS Drawing · 15 Jul 2026
  • ASHP SITE ELEVATIONS PROPOSED Drawing · 29 Jun 2026
  • NOISE IMPACT ASSESSMENT BackGround Papers · 29 Jun 2026
  • ASHP SITE - EXISTING Drawing · 29 Jun 2026
  • PLANNING APPLICATION FORM Application Form · 29 Jun 2026
  • ASHP ENCLOSURE AND SERVICES Drawing · 29 Jun 2026
  • PRODUCT INFORMATION BackGround Papers · 29 Jun 2026
  • ASHP SITE ELEVATIONS EXISTING AND PROPOSED Drawing · 29 Jun 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Leeds for determination, against a statutory target of eight weeks. Over the last year Leeds decided full applications in a median of 55 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Leeds

  • 26/04872/FU Awaiting decision

    56 - 58 Brussels Street Leeds LS9 8AB

    Retrospective change of use to allow for part sui generis bar and live music venue use in the evenings

    10 Sep 2026 Full applications
  • 26/04840/FU Awaiting decision

    Chapel Allerton Methodist Church Town Street Chapel Allerton Leeds LS7 4NB

    Installation of photovoltaic panels and two air source heat pumps; replacement entrance doors and shutters; internal alterations to form an ancillary cafe and seating area

    10 Sep 2026 Full applications
  • 26/04780/FU Awaiting decision

    11 Meadow Road Garforth Leeds LS25 2EN

    Increase in size to dormer window to front; bi-fold doors to rear

    10 Sep 2026 Full applications
  • 26/03285/FU Refused

    The Grove London Lane Rawdon Leeds LS19 6BR

    Deconstruction of existing boundary wall and rebuilding with a bridged section to accommodate tree growth

    21 Jul 2026 Full applications
  • 26/04683/FU Awaiting decision

    11 Woodbine Terrace Claremont Road Headingley Leeds LS6 4AF

    Retrospective application for the Installation of ground mounted air source heat pump

    9 Sep 2026 Full applications