Planning application
The Co-operative Funeralcare Marsh Lane Leeds LS9 8AD
Works: New dwelling Demolition Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing buildings and erection of part 10, part 11 storey building providing 205 apartments with associated parking, cycle store, bin store, plant rooms, and residents amenity space
As published by the council, reference 26/03033/FU
Application record
- Reference
- 26/03033/FU
- Type
- Full Planning Application
- Status
- Current
- Received
- 10 Jun 2026
- Validated
- 10 Jun 2026
- Ward
- Hunslet & Riverside
- Decision by
- Delegated Decision
- Postcode
- LS9 8AD
Comment by 24 July 2036
The council is taking comments on this application until then. Have your say on Leeds's portal.
Timeline
Dates from the published record
-
10 Jun 2026
Received by Leeds
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Leeds took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Brewsterbye Architects Agent, an architecture practice
16 applications on PlanIndex · across 4 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordOakapple Marsh Lane Ltd & Co-operative Group Ltd Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
94 documents on file for this application
- - NATURE TEAM
- - CLIMATE AND ENERGY
- ADD . RESPONSE TO LOCAL PLANS COMMENTS
- - LANDSCAPE TEAM
- - ENVIRONMENT AND DESIGN GROUP ACOUSTICS
- ADD: CARBON & ENERGY REPORTING TEMPLATE
- INFLUENCING TRAVEL BEHAVIOUR TEAM
- FIRE HSE
- - HIGHWAYS TEAM
- WEST YORKSHIRE ARCHAEOLOGY ADVISORY SERVICE
- REV. TRAVEL PLAN
- ADD. SWET PATH ANALYSIS
- ADD. BIRD & BAT BOX PLAN
- - CLIMATE AND ENERGY
- - FLOOD RISK MANAGEMENT
- REV . SOUTH EAST ELEVATION
- REV . CHAMFERED CORNERS
- ADD . FLOOD EXCEEDANCE ROUTES PLAN
- ADD . HANN TUCKER 32991-PTM1-REV1-WR RESPONSE TO EHO COMMENTS
- ADD . OAKAPPLE 30.07.2026 REUSE AND RECYCLE STATEMENT
- ADD . PWP DESIGN LTD RESPONSE TO LANDSCAPE TEAM COMMENTS
- ADD . EN1 HILL LAWRENCE MARSH LANE LANDLORD AREAS EPC[EPC]
- ADD . HIGHWAYS CONSULTATION APPLICANT RESPONSE
- REV . GF PLAN
- REV . SOUTH WEST ELEVATION
- REV . EXTERNAL COURTYARD ELEVATIONS
- ADD . ADOPTABLE AREAS PLAN
- ADD . VISIBILITY SPLAYS
- ADD . EN 1 HILL LAWRENCE MARSH LANE LANDLORD AREAS BRUKL
- ADD . EN1 HILL LAWRENCE MARSH LANE LEEDS STAGE 2 ENERGY STATEMENT P02
- ADD . EN1 HILL LAWRENCE MARSH LN CARBON AND ENERGY REPORTING TEMPLATE V1.0
- ADD . EN 4 HILL LAWRENCE LEEDS PIPES - MARSH LANE - CONNECTION PROPOSAL 10.03.23
- ADD . BBA WRITTEN RESPONSE TO DESIGN TEAM COMMENTS
- ADD . EN1 HILL LAWRENCE SAMPLE SAPS COMBINED
- ADD . EN 4 HILL LAWRENCE APPENDIX A - MARSH LANE - DH CONNECTION
- ADD . EN 4 HILL LAWRENCE APPENDIX B - MARSH LANE - END-USER COMPARATOR
- REV . NORTH WEST ELEVATION
- REV . SITE PLAN
- ADD . EN2 HILL LAWRENCE WATER CALCULATOR
- ADD . EN 4 HILL LAWRENCE HL1865 MARSH LANE - LEEDS PIPES REVIEW P01
- ADD . WYAAS APPLICANT RESPONSE
- - - PH PLANNING CONSULTATION
- - YORKSHIRE WATER SERVICE
- - LOCAL PLANS
- - HIGHWAYS TEAM
- - DESIGN TEAM
- - NATURE TEAM
- - LANDSCAPE TEAM
- - CLIMATE AND ENERGY
- - HIGHWAYS TEAM
- INFLUENCING TRAVEL BEHAVIOUR TEAM
- - WEST YORKSHIRE ARCHAEOLOGY ADVISORY SERVICE
- - CONSERVATION TEAM
- - ENVIRONMENT AND DESIGN GROUP ACOUSTICS
- ACTIVE TRAVEL ENGLAND
- - CONTAMINATED LAND TEAM
- - FLOOD RISK MANAGEMENT
- - ENVIRONMENTAL STUDIES TRANSPORT STRATEGY TEAM
- ROOF
- LEVEL 10
- PHASE 1 PRELIMINARY CONTAMINATION RISK ASSESSMENT
- PHASE 1 PRELIMINARY CONTAMINATION RISK ASSESSMENT
- PHASE 1 PRELIMINARY CONTAMINATION RISK ASSESSMENT
- PHASE 1 PRELIMINARY CONTAMINATION RISK ASSESSMENT
- BIODIVERSITY NET GAIN ASSESSMENT
- FIRE STATEMENT FORM
- OUTLINE LANDSCAPE MASTERPLAN COURTYARD AND STREET LEVEL
- OUTLINE LANDSCAPE MASTERPLAN ROOF TERRACE
- LEVEL 02-07
- TRANSPORT STATEMENT
- STATUTORY BIODIVERSITY METRIC
- AIR QUALITY ASSESSMENT
- STAGE 2 ENERGY STRATEGY REPORT
- PLANNING APPLICATION FORM
- LEVEL 01
- DESIGN & ACCESS STATEMENT PART 4
- FRAMEWORK TRAVEL PLAN
- PHASE 1 PRELIMINARY CONTAMINATION RISK ASSESSMENT
- HERITAGE STATEMENT
- HOUSING NEEDS ASSESSMENT
- STATUTORY BIODIVERSITY METRIC - TECHNICAL ANNEX 1
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
- PHASE 1 PRELIMINARY CONTAMINATION RISK ASSESSMENT
- STATEMENT OF COMMUNITY ENGAGEMENT
- LOCATION PLAN
- LEVEL 08-09
- DESIGN & ACCESS STATEMENT PART 2
- DESIGN & ACCESS STATEMENT PART 1
- WIND MICROCLIMATE
- NOISE AND VIBRATION IMPACT ASSESSMENT REPORT
- GLINT & GLARE ASSESSMENT
- BAT EMERGENCE SURVEY REPORT
- DESIGN & ACCESS STATEMENT PART 3
- PLANNING STATEMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Leeds for determination, against a statutory target of eight weeks. Over the last year Leeds decided full applications in a median of 55 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land Off Foundry Street And Saxton Lane Leeds LS9 8HE
Variation of condition 32 (wind model) to previously approved planning application 25/02553/FU to update the wind model and wind mitigation measures in order to comply with Condition 11 (sewer easement) - NON MATERIAL AMENDMENT to 25/02553/FU - Modify Condition 22 (Highways Works) and Condition 26 (Planting Replacement)
Granted Amendments 7 docs -
Land Off Foundry Street And Saxton Lane Leeds LS9 8HE
Consent agreement or approval required by conditions 13 and 14 of planning application 23/07065/FU
Granted Conditions 6 docs -
Land Off Foundry Street And Saxton Lane Leeds LS9 8HE
Consent, agreement or approval of condition 35 (accessible hsg cert) to planning application 25/02553/FU
Granted Conditions 23 docs -
Land Off Foundry Street And Saxton Lane Leeds LS9 8HE
Consent, agreement or approval required by conditions 4 (Surfacing Materials), 22 (Car Park and Servicing Management Plan) and 26 (Landscape Management) of Planning Application 23/07065/FU
Granted Conditions 14 docs -
56 - 58 Brussels Street Leeds LS9 8AB
81% historically approved · decision due ~5 Nov
Retrospective change of use to allow for part sui generis bar and live music venue use in the evenings
Awaiting decision Full applications 3 docs -
Underbridge (HUL4/40) At Marsh Lane Viaduct Leeds
Alterations to existing underbridge
Granted Prior approval 14 docs
Other full applications
In Leeds
-
26/04872/FU Awaiting decision
56 - 58 Brussels Street Leeds LS9 8AB
Retrospective change of use to allow for part sui generis bar and live music venue use in the evenings
-
26/04840/FU Awaiting decision
Chapel Allerton Methodist Church Town Street Chapel Allerton Leeds LS7 4NB
Installation of photovoltaic panels and two air source heat pumps; replacement entrance doors and shutters; internal alterations to form an ancillary cafe and seating area
-
26/04780/FU Awaiting decision
11 Meadow Road Garforth Leeds LS25 2EN
Increase in size to dormer window to front; bi-fold doors to rear
-
26/03285/FU Refused
The Grove London Lane Rawdon Leeds LS19 6BR
Deconstruction of existing boundary wall and rebuilding with a bridged section to accommodate tree growth
-
26/04683/FU Awaiting decision
11 Woodbine Terrace Claremont Road Headingley Leeds LS6 4AF
Retrospective application for the Installation of ground mounted air source heat pump