Planning application
Land At Former Copperfield College Cross Green Lane Cross Green Leeds
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of 123 affordable dwellings, relocation and enhancement of existing rugby pitch, training areas and erection of ball stop fencing and all associated landscaping, infrastructure and engineering works
As published by the council, reference 26/01764/FU
Application record
- Reference
- 26/01764/FU
- Type
- Full Planning Application
- Status
- Current
- Received
- 16 Apr 2026
- Validated
- 16 Apr 2026
- Ward
- Burmantofts & Richmond Hill
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
16 Apr 2026
Received by Leeds
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Leeds took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Carter Jonas LLP Agent
1,104 applications on PlanIndex · across 146 councils · 89% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordIncommunities Group Ltd And Leeds City Council Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
102 documents on file for this application
- ACCESS OFFICER
- EQUIVALENT QUALITY AND QUANTITY ASSESSMENT (EQQA)
- - LANDSCAPE TEAM
- - ENVIRONMENTAL STUDIES TRANSPORT STRATEGY TEAM
- - DESIGN TEAM
- SPORT ENGLAND
- - ENVIRONMENT AND DESIGN GROUP ACOUSTICS
- - NATURE TEAM
- - FLOOD RISK MANAGEMENT
- CROSSGREEN LANE TRIAL HOLE REPORT
- DRAINAGE CCTV
- E-MAIL CORRESPONDENCE WITH YW
- YORKSHIRE WATER
- H9 FORM
- - HISTORIC ENGLAND
- MINING REMEDIATION AUTHORITY
- INFLUENCING TRAVEL BEHAVIOUR TEAM
- - CONTAMINATED LAND TEAM
- - CLIMATE AND ENERGY
- - ENVIRONMENTAL STUDIES TRANSPORT STRATEGY TEAM
- WEST YORKSHIRE ARCHAEOLOGICAL SERVICE
- - FLOOD RISK MANAGEMENT
- - RAMBLERS LEEDS GROUP -
- STATEMENT OF COMMUNITY INVOLVEMENT
- PLANNING STATEMENT FINAL
- SUPPLEMENTARY GEOENVIRONMENTAL APPRAISAL
- ARBORICULTURAL REPORT
- STATUTORY BIODIVERSITY METRIC
- GROUND INVESTIGATION REPORT
- GEOTECHNICAL RISK ASSESSMENT
- COVERING LETTER
- BIODIVERSITY NET GAIN ASSESSMENT
- SOIL AND LEACHATES ANALYTICS
- SOIL ANALYTICS
- ECOLOGICAL IMPACT ASSESSMENT
- THE THORNTON (HOUSING TYPE) DRAWING PACK
- THE WALBROOK (HOUSING TYPE) DRAWING PACK
- THE WALKHAM (HOUSING TYPE) DRAWING PACK
- LANDSCAPE MASTERPLAN
- 1.8M FENCE 1.8M TIMBER LAP FENCE
- 1.8M FENCE/WALL BRICK PIER WITH TIMBER PANEL
- MATERIALS PLAN
- STREET SCENES
- BOUNDARY TREATMENT LAYOUT
- SITE LOCATION
- PLANT FENCING SPECIFICATION SHEET
- EXISTING SITE LAYOUT
- SITE SURVEY
- FIGURE 3 - TREE CONSTRAINTS PLAN (SHEET 1 OF 2)
- GROUND INVESTIGATION
- RUGBY BALL STRIKE ASSESSMENT
- DRAINAGE PLAN
- THE FARLEY (HOUSING TYPE) DRAWING PACK
- THE HOLGATE (HOUSING TYPE) DRAWING PACK
- TREE SURVEY REPORT
- NOISE IMPACT ASSESSMENT
- AIR QUALITY ASSESSMENT
- TRANSPORT ASSESSMENT
- PROPOSED LAYOUT RUGBY PITCH LAYOUT
- BALL STOP FENCING INDICATIVE ELEVATIONS/SECTIONS
- JACKSON BALL STOP FENCING 1 OF 2
- JACKSON BALL STOP FENCING 2 OF 2
- STANDARD BALLSTOP FENCING - CONNECTORS
- DRAINAGE DOCUMENTATION
- SUPPLEMENTAL EXPLORATORY HOLE LOCATION PLAN (PITCH 2)
- PROPOSED BELOW GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- ELECTRIC VEHICLE CHARGING
- DESIGN AND ACCESS STATEMENT (KEEPMOAT)
- THE OULSTON (HOUSING TYPE) DRAWING PACK
- THE SELSET (HOUSING TYPE) DRAWING PACK
- REMEDIATION STRATEGY
- ARBORICULTURAL IMPACT ASSESSMENT
- TRAVEL PLAN
- FLOOD RISK ASSESSMENT
- ARBORICULTURAL REPORT, IMPACT ASSESSMENT AND METHOD STATEMENT
- SUPPLEMENTARY GROUND INVESTIGATION REPORT AND HUMAN HEALTH RISK ASSESSMENT
- STANDARD BALLSTOP FENCING ELEVATIONS
- DESIGN AND ACCESS STATEMENT (NPS GROUP)
- SOUTH WEST NORSE - FLOOD RISK ASSESSMENT
- PROPOSED LAYOUT TRAINING AREA LAYOUT DRAINAGE STRATEGY
- PROPOSED LAYOUT RUGBY PITCH LAYOUT DRAINAGE STRATEGY
- PROPOSED LAYOUT SOFT LANDSCAPE
- SITE CIRCULATION
- LOCATION PLAN
- PLANNING APPLICATION FORM
- THE PADBURY (HOUSING TYPE) DRAWING PACK
- THE SWARBOURN (HOUSING TYPE) DRAWING PACK
- LANDSCAPING DETAILS
- TREE IMPACT PLAN
- SUSTAINABILITY STATEMENT
- KNEE RAIL 600-900MM
- BIODIVERSITY SURVEY AND REPORT
- TREE SURVEY SCHEDULE
- RUGBY PITCH DEVELOPMENT SITE INVESTIGATION
- GROUND INVESTIGATION REPORT
- PLANT FENCING BROCHURE AND SPEC 1 OF 2
- FIGURE 4 - TREE CONSTRAINTS PLAN (SHEET 2 OF 2)
- BIODIVERSITY STATEMENT
- PROPOSED LAYOUT GENERAL ARRANGEMENT
- PROPOSED LAYOUT TRAINING AREA LAYOUT
- TREE RETENTION/REMOVAL PLAN TREE PROTECTION PLAN
- PLANNING LAYOUT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Leeds for determination, against a statutory target of eight weeks. Over the last year Leeds decided full applications in a median of 56 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
16 Copperfield Drive Cross Green Leeds LS9 0BR
Consent, agreement or approval required by conditions 3 and 4 of Planning Application 22/06372/FU
Split decision Conditions 14 docs -
Land At Long Causeway Cross Green Leeds LS9 0NY
Demolition of all existing buildings/structures and erection of new flexible industrial/logistics units falling within Use Classes E(g)(ii)/(iii), B2 and/or B8 (and ancillary office floorspace) and all associated infrastructure works, access arrangements, parking, and hard and soft landscaping
Granted Full applications Demolition 92 docs -
85 Cross Green Lane Cross Green Leeds LS9 0DG
Certificate of Existing Lawful Development for a use of former dwellinghouse (C3) as a house in multiple occupation (C4)
Granted Lawful development 1 docDomestic -
Coating Plant South Accommodation Road Hunslet Leeds LS9 0RT
Continued temporary use of land for the recovery, storage and recycling of waste road planings
Granted Full applications 20 docs -
Land At Long Causeway Cross Green Leeds LS9 0NY
Consent, agreement or approval required by condition Biodiversity Net Gain of Planning Application 25/07502/FU
Refused Conditions -
Land At Long Causeway Cross Green Leeds LS9 0NY
Consent, agreement or approval required by condition 28 (Construction Environmental Management Plan) of Planning Application 25/07502/FU
Granted Conditions
Other full applications
In Leeds
-
26/03783/FU Granted
New Barn House Hall Mews Boston Spa Wetherby LS23 6DT
Change of use of former office to one C3 dwellinghouse, erection of two front dormers, fenestration alterations to front, replacement windows to front, fencing and bike store to front.
-
25/07381/FU Granted
Ridgeways 44 Woodhouse Lane East Ardsley WF3 2LE
Erection of two dewllings with new access and dropped kerb
-
26/05577/FU Awaiting decision
62 Denton Avenue Gledhow Leeds LS8 1LE
Single-storey extension to side and rear; new window to side
-
26/05572/FU Awaiting decision
66 Vesper Way Kirkstall Leeds LS5 3LN
Demolition of existing detached garage; single-storey side and rear extension; new window to side; new steps to rear
-
26/05532/FU Awaiting decision
27 Meadow Drive Micklefield Leeds LS25 4FQ
Replacement of garage door to front with window to form habitable room