Planning application
6 Canterbury Crescent And 49 Brixton Station Road, Brixton London SW9 8PQ
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Refurbishment and extension of 6 Canterbury Crescent and development of 49 Brixton Station Road to provide a residential-led mixed use development comprising residential dwellings, flexible commercial, workspace, enterprise and community hub and market trader infrastructure, together with servicing, car parking, public realm and associated works. Information for the purpose of consultation (floorspace measured as Gross Internal Area): - 3 buildings on the 49 Brixton Station Road site at 20, 18 and 6 storeys in height - Residential dwellings: 288 - Office (E)(g)(i): 3, 806sqm including 1,431sqm of affordable workspace - Enterprise and community hub: 134sqm - Retail (E): 217sqm - Market waste facilities (Sui Generis): 543sqm - Market storage facilities (B8): 555sqm
As published by the council, reference 25/03722/RG4
Application record
- Reference
- 25/03722/RG4
- Type
- Approval under Reg 4
- Status
- Awaiting decision
- Received
- 1 Dec 2025
- Validated
- 11 Dec 2025
- Ward
- Brixton Windrush
- Postcode
- SW9 8PQ
Timeline
Dates from the published record
-
1 Dec 2025
Received by Lambeth
-
11 Dec 2025
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lambeth took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Newmark LLP Agent
923 applications on PlanIndex · across 40 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordLONDON SQUARE DEVELOPMENTS LTD Applicant, a developer registered in Uxbridge
Active · incorporated 2010 · Uxbridge
10 applications on PlanIndex · across 3 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
330 documents on file for this application
- LPA REVIEW OF DSO ASSESSMENT
- DRAFT S106 - UU
- DRAFT S106 - BILATERAL
- DRAFT S106 - PLANS
- COVER LETTER
- FINANCIAL VIABILITY ASSESSMENT
- TRANSPORT ASSESSMENT
- THE LOCATION PLAN
- PRE-DEMOLITION AUDIT
- VENTILATION SUMMARY STATEMENT
- LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 4
- LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 0
- FLOOD RISK ASSESSMENT
- DERTER BLOCK 4 UNIT 8
- DERTER BLOCK 4 UNIT 6
- DERTER BLOCK 2 UNIT 6
- DERTER BLOCK 2 UNIT 5
- DERTER BLOCK 4 UNIT 5
- DERTER BLOCK 4 UNIT 3
- DERTER BLOCK 2 UNIT 5
- DERTER BLOCK 2 UNIT 3
- DESK STUDY AND GROUND INVESTIGATION
- DAYLIGHT, SUNLIGHT AND OVERSHADOWING ASSESSMENT
- PROPOSED SITE PLAN LEVEL 10
- PROPOSED SITE ELEVATION FF
- EXISTING SITE SECTIONS 2 OF 2
- BLOCK 4 (INTERNATIONAL HOUSE) ELEVATIONS (2 OF 2)
- BLOCK 4 (INTERNATIONAL HOUSE) - DEMOLITION ELEVATIONS (2 OF 2)
- PROPOSED SITE PLAN - LEVEL 7
- PROPOSED SITE PLAN - LEVEL 5
- BAY STUDY - BLOCK 2 MIDDLE
- BLOCK 2 ELEVATIONS (2 OF 2)
- BLOCK 4 (INTERNATIONAL HOUSE) - LEVEL 9
- BLOCK 4 (INTERNATIONAL HOUSE) - LEVEL 7
- BLOCK 3 - LEVEL 5
- BLOCK 3 - LEVEL 3.
- BLOCK 2 - LEVEL 14
- COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM
- OPERATIONAL WASTE MANAGEMENT STRATEGY
- EXCEL SPREADSHEET FOR WHOLE LIFE CARBON CYCLE REPORT
- OUTLINE CONSTRUCTION LOGISTICS PLAN
- SOCIAL INFRASTRUCTURE MANAGEMENT PLAN
- INTERNATIONAL HOUSE
- FIRE STATEMENT BLOCKS 1 -2
- DRAINAGE STRATEGY - PART 2
- STATION ROAD - BLOCK 3
- FULL SAP CALCULATION PRINTOUT - UNIT 2
- DERTER BLOCK 4 UNIT 5
- DERTER BLOCK 4 UNIT 1
- DERTER BLOCK 2 UNIT 9
- DERTER BLOCK 2 UNIT 3
- DERTER BLOCK 1 UNIT 4
- DERTER BLOCK 4 UNIT 7
- DERTER BLOCK 4 UNIT 3
- DERTER BLOCK 2 UNIT 8
- DERTER BLOCK 1 UNIT 8
- DERTER BLOCK 1 UNIT 4
- CARBON EMISSIONS REPORT
- ARCHEOLOGICAL DESK BASED ASSESSMENT
- PROPOSED SITE PLAN BASEMENT LEVEL
- PROPOSED SITE PLAN LEVEL 14
- PROPOSED SITE ELEVATION
- PROPOSED SITE SECTION CC
- EXISTING BLOCK 4 (INTERNATIONAL HOUSE) LEVEL 13
- EXISTING BLOCK 4 (INTERNATIONAL HOUSE) LEVEL 12 (ROOF)
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING ELEVATIONS (2 OF 2)
- APPLICATION FORM - WITHOUT PERSONAL DATA
- STATEMENT OF COMMUNITY INVOLVEMENT
- DRAWING ISSUE SHEET
- LANDSCAPE GENERAL ARRANGEMENT PLAN - ROOF PLAN
- DRAINAGE STRATEGY
- ECOLOGICAL APPRAISAL
- DERTER BLOCK 4 UNIT 4
- DERTER BLOCK 4 UNIT 2
- DERTER BLOCK 2 UNIT 8
- DERTER BLOCK 4 UNIT 1
- DERTER BLOCK 3 UNIT 3
- DERTER BLOCK 2 UNIT 9
- DERTER BLOCK 2 UNIT 7
- DESIGN AND ACCESS STATEMENT - PART 3
- TREE REMOVAL PLAN SHOWING EXISTING LAYOUT
- AIR QUALITY ASSESSMENT
- PROPOSED SITE ELEVATION DD
- PROPOSED SITE ELEVATION BB
- PROPOSED SITE SECTION DD
- PROPOSED SITE SECTION BB
- EXISTING BLOCK 4 (INTERNATIONAL HOUSE) LEVEL 12
- EXISTING BLOCK 4 (INTERNATIONAL HOUSE) BASEMENT LEVEL
- PROPOSED SITE PLAN - LEVEL 3
- PROPOSED SITE PLAN - LEVEL 1
- BAY STUDY - ENTERPRISE HUB
- BLOCK 4 (INTERNATIONAL HOUSE) - LEVEL 5
- BLOCK 4 (INTERNATIONAL HOUSE) - LEVEL 3
- BLOCK 3 SECTION PLANS
- M4(3) FLAT TYPE 10 - BLOCK 2
- M4(3) FLAT TYPE 08 - BLOCK 2
- PARKING DESIGN MANAGEMENT PLAN
- SUSTAINABILITY STATEMENT
- FIRE STATEMENT BLOCKS 1 AND 2
- STATION ROAD - BLOCK 1-2
- FULL SAP CALCULATION PRINTOUT - UNIT 4
- DERTER BLOCK 3 UNIT 3
- DERTER BLOCK 3 UNIT 2
- DERTER BLOCK 1 UNIT 6
- DERTER BLOCK 1 UNIT 5
- DERTER BLOCK 3 UNIT 1
- DERTER BLOCK 2 UNIT 10
- DERTER BLOCK 1 UNIT 3
- DERTER BLOCK 1 UNIT 2
- DRAFT EMPLOYMENT AND SKILLS PLAN
- PROPOSED SITE PLAN LEVEL 19
- PROPOSED SITE PLAN LEVEL 16
- PROPOSED SITE PLAN LEVEL 15
- EXISTING SITE ELEVATION 2 OF 2
- EXISTING SITE ELEVATIONS 1 OF 2
- BLOCK 4 (INTERNATIONAL HOUSE) LEVEL 12 DEMOLITION PLAN
- EXISTING BLOCK 4 (INTERNATIONAL HOUSE) MEZZANINE LEVEL
- EXISTING BLOCK 4 (INTERNATIONAL HOUSE) LEVEL 11
- BLOCK 4 SECTIONS (INTERNATIONAL HOUSE) (1 OF 2)
- BLOCK 4 SECTIONS (INTERNATIONAL HOUSE) (2 OF 2)
- BAY STUDY - BLOCK 4 (INTERNATIONAL HOUSE) TOP
- BAY STUDY - BLOCK 4 (INTERNATIONAL HOUSE) MIDDLE
- BAY STUDY - CLASS E RETAIL
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING LEVEL 7
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING LEVEL 6
- WORKSPACE STRATEGY
- TRAVEL PLAN
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 4
- FIRE STATEMENT BLOCK 4
- STATION ROAD - BLOCK 4
- FULL SAP CALCULATION PRINTOUT - UNIT 5
- DERTER BLOCK 3 UNIT 1
- DERTER BLOCK 2 UNIT 11
- DERTER BLOCK 1 UNIT 8
- DERTER BLOCK 1 UNIT 7
- DERTER BLOCK 2 UNIT 11
- DESIGN AND ACCESS STATEMENT - PART 1
- CIRCULAR ECONOMY STATEMENT
- TREE REMOVAL PLAN SHOWING EXISTING LAYOUT
- PROPOSED SITE PLAN LEVEL 18
- PROPOSED SITE PLAN LEVEL 17
- PROPOSED SITE SECTION GG
- PROPOSED SITE SECTION FF
- EXISTING BLOCK 4 (INTERNATIONAL HOUSE) LEVEL 1
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING SECTIONS (2 OF 2)
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING SECTIONS (1 OF 2)
- BAY STUDY - BLOCK 4 (INTERNATIONAL HOUSE) ENTRANCE
- BAY STUDY - WORKSPACE ENTRANCE
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING LEVEL 8
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING LEVEL 5
- BLOCK 4 (INTERNATIONAL HOUSE) - LEVEL 1
- BLOCK 4 (INTERNATIONAL HOUSE) - GROUND LEVEL
- M4(3) FLAT TYPE 07 - BLOCK 2
- BLOCK 2 - LEVEL M1 (MEZZANINE)
- UTILITIES ASSESSMENT
- NOISE AND VIBRATION IMPACT ASSESSMENT
- LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 5
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 2
- FIRE STATEMENT BLOCK 3
- STATION ROAD - BLOCK 4
- STATION ROAD - BLOCK 1-2
- DERTER BLOCK 4 UNIT 3
- DERTER BLOCK 2 UNIT 10
- DERTER BLOCK 2 UNIT 1
- DERTER BLOCK 1 UNIT 2
- DERTER BLOCK 4 UNIT 2
- DERTER BLOCK 2 UNIT 6
- DERTER BLOCK 1 UNIT 6
- CARBON EMISSIONS REPORT
- DESIGN AND ACCESS STATEMENT - PART 2
- CIL FORM
- PROPOSED SITE ELEVATION GG-C01
- PROPOSED SITE PLAN LEVEL 12
- PROPOSED SITE ELEVATION CC
- PROPOSED SITE SECTION EE
- BLOCK 4 (INTERNATIONAL HOUSE) - LEVEL M1 (MEZZANINE)
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING ELEVATIONS (1 OF 2)
- PROPOSED SITE PLAN - LEVEL 2
- BAY STUDY - BLOCK 2 TOP
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING LEVEL 10
- BLOCK 4 (INTERNATIONAL HOUSE) - LEVEL 2
- BLOCK 3 - LEVEL 1
- M4(3) FLAT TYPE 09 - BLOCK 2
- BLOCK 2 - LEVEL 19
- BLOCK 2 - LEVEL 12
- BAY STUDY - BLOCK 1 TOP
- BAY STUDY - BLOCK 1 ENTRANCE
- M4(3) FLAT TYPE 10 - BLOCK 2
- M4(3) FLAT TYPE 8 - BLOCK 2
- BLOCK 1 - LEVEL 9
- BLOCK 1 - LEVEL 7
- PHOTOS
- PHOTOS
- SPREADSHEET OF ACCOMMODATION SCHEDULE - COMMERCIAL
- OUTLINE SITE WASTE MANAGEMENT PLAN
- PRE-REDEVELOPMENT AUDIT
- LANDSCAPE GENERAL ARRANGEMENT PLAN - LEVEL 1
- MARKET STORAGE MANAGEMENT PLAN
- FLOOD RISK ASSESSMENT
- EQUALITIES IMPACT ASSESSMENT
- STATION ROAD - BLOCK 3
- DERTER BLOCK 4 UNIT 7
- DERTER BLOCK 2 UNIT 7
- DERTER BLOCK 4 UNIT 6
- DERTER BLOCK 4 UNIT 4
- DERTER BLOCK 2 UNIT 4
- DERTER BLOCK 1 UNIT 1
- ARBORICULTURAL IMPACT ASSESSMENT
- PROPOSED SITE PLAN LEVEL 9
- PROPOSED SITE ELEVATION EE
- PROPOSED SITE SECTION AA
- EXISTING SITE SECTIONS 1 OF 2
- BLOCK 4 (INTERNATIONAL HOUSE) LEVEL 10 DEMOLITION PLAN
- BLOCK 4 (INTERNATIONAL HOUSE) ELEVATIONS (1 OF 2)
- PROPOSED SITE PLAN - LEVEL 6
- PROPOSED SITE PLAN - LEVEL 4
- BAY STUDY - BLOCK 2 RESIDENTIAL ENTRANCE
- BLOCK 2 ELEVATIONS (1 OF 2)
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING LEVEL 1
- BLOCK 4 (INTERNATIONAL HOUSE) - LEVEL 8
- BLOCK 4 (INTERNATIONAL HOUSE) - LEVEL 6
- BLOCK 3 - LEVEL 6 / ROOF
- BLOCK 3 - GROUND LEVEL
- BLOCK 2 - LEVEL 15
- WHOLE LIFE CARBON CYCLE REPORT
- WIND MICROCLIMATE REPORT
- DELIVERY AND SERVICING PLAN
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 3
- FIRE STATEMENT BLOCK 4
- STATION ROAD - BLOCK 4
- STATION ROAD - BLOCK 2 BREEAM
- FULL SAP CALCULATION PRINTOUT - UNIT 3
- FULL SAP CALCULATION PRINTOUT - UNIT 1
- DERTER BLOCK 2 UNIT 4
- DERTER BLOCK 1 UNIT 3
- DERTER BLOCK 4 UNIT 8
- DERTER BLOCK 1 UNIT 7
- DERTER BLOCK 1 UNIT 5
- CARBON EMISSIONS REPORT
- BSR AND 6 CC ENERGY STRATEGY REPORT
- CIRCULAR ECONOMY STATEMENT - SPREADSHEET
- PROPOSED SITE PLAN LEVEL M1 (MEZZANINE)
- PROPOSED SITE PLAN LEVEL 20 (ROOF)
- PROPOSED SITE PLAN LEVEL 13
- PROPOSED SITE PLAN LEVEL 11
- BLOCK 4 (INTERNATIONAL HOUSE) LEVEL 11 DEMOLITION PLAN
- EXISTING BLOCK 4 (INTERNATIONAL HOUSE) BASEMENTLEVEL
- BLOCK 4 (INTERNATIONAL HOUSE) - DEMOLITION ELEVATIONS (1 OF 2)
- PROPOSED SITE PLAN - LEVEL 8
- BLOCK 4 (INTERNATIONAL HOUSE) - LEVEL 10
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING LEVEL 9
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING LEVEL 4
- BLOCK 2 - LEVEL 20 (ROOF)
- BLOCK 2 - LEVEL 18
- BLOCK 2 - LEVEL 16
- M4(3) FLAT TYPE 6 - BLOCK 2
- BLOCK 1 - LEVEL M1 (MEZZANINE)
- BLOCK 1 - LEVEL 13
- BLOCK 1 - LEVEL 11
- PHOTOS
- PROPOSED SITE PLAN - GROUND LEVEL
- BAY STUDY - BLOCK 1 AND 2 BALCONIES
- BLOCK 2 SECTIONS (1 OF 2)
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING LEVEL 2
- BLOCK 4 (INTERNATIONAL HOUSE) - LEVEL 4
- BLOCK 3 ELEVATIONS
- BLOCK 3 - LEVEL 3
- BLOCK 2 SECTIONS (1 OF 2)
- BLOCK 2 - LEVEL 17
- BLOCK 2 - LEVEL 10
- BLOCK 2 - LEVEL 3
- M4(3) FLAT TYPE 1 - BLOCK 1
- BLOCK 1 - LEVEL 3
- PHOTOS
- PHOTOS
- BAY STUDY - BLOCK 3 ENTRANCE & BALCONIES
- M4(3) FLAT TYPE 06 - BLOCK 2
- BLOCK 2 - LEVEL 5
- BLOCK 2 - LEVEL 4
- BLOCK 1 SECTIONS (1 OF 2)
- M4(3) FLAT TYPE 05 - BLOCK 1
- BLOCK 1 - LEVEL 15
- BLOCK 1 - LEVEL 14
- BLOCK 1 - LEVEL 1.
- PHOTOS
- DRAWING ISSUE SHEET
- PROPOSED BLOCK PLANS
- BLOCK 2 - LEVEL 7
- BLOCK 2 - LEVEL 6
- BLOCK 1 SECTIONS (2 OF 2)
- M4(3) FLAT TYPE 04 - BLOCK 1
- M4(3) FLAT TYPE 03 - BLOCK 1
- BLOCK 1 - LEVEL 17
- BLOCK 1 - LEVEL 16
- BLOCK 1 - GROUND LEVEL
- PHOTOS
- EXISTING BLOCK PLANS
- OS MAPS
- BLOCK 2 - LEVEL 8
- BLOCK 2 - LEVEL 1
- BLOCK 1 ELEVATIONS (2 OF 2)
- M4(3) FLAT TYPE 02 - BLOCK 1
- BLOCK 1 - LEVEL 18
- BLOCK 1 - LEVEL 12
- BLOCK 1 - LEVEL 5
- PHOTOS
- PHOTOS
- BLOCK 2 - LEVEL 13
- M4(3) FLAT TYPE 9 - BLOCK 2
- M4(3) FLAT TYPE 7 - BLOCK 2
- BLOCK 1 - LEVEL 10
- BLOCK 1 - LEVEL 8
- BLOCK 1 - LEVEL 6
- PHOTOS
- PHOTOS
- SPREADSHEET OF ACCOMMODATION SCHEDULE - RESIDENTIAL
- ACCOMMODATION SCHEDULE RESIDENTIAL
- BLOCK 4 (INTERNATIONAL HOUSE) - EXISTING LEVEL 3
- BLOCK 3 - LEVEL 2
- BLOCK 2 - LEVEL 11
- BLOCK 2 - LEVEL 9
- BLOCK 2 - LEVEL 2
- BLOCK 2 - GROUND LEVEL
- BLOCK 1 ELEVATIONS (1 OF 2)
- BLOCK 2 SECTIONS (1 OF 2)
- BLOCK 1 - LEVEL 4
- BLOCK 1 - LEVEL 1
- PHOTOS
- PHOTOS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Lambeth for determination, against a statutory target of eight weeks. Over the last year Lambeth's median decision took 56 days. More in our guide to how long planning decisions take.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Pop Brixton 49 Brixton Station Road London SW9 8PQ
Request for a Screening Opinion in respect of an Environmental Impact Assessment (EIA) pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations, 2017 for a proposed mixed-use development comprising four new blocks and retention and refurbishment of International House. The four blocks will comprise of Block 1 which is a 17 storey tower with a 6 storey shoulder, Block 2 which is a 20 storey tower with a 5 storey shoulder and Block 3 which comprises 6 storeys. The development will provide up to 300 units across a mix of tenures throughout the four Blocks and International House, and approximately 2,380sqm of workspace in Block 3.
Decided Outline 2 docsMajor scheme -
Pop Brixton 49 Brixton Station Road London Lambeth SW9 8PQ
Variation of Condition 1 of planning permission ref: 19/01190/VOC (Variation of Condition 1 (Temporary use of land) of planning permission 15/01298/VOC (Variation of Condition 2 (approved plans) of planning permission ref. 14/03314/RG4 (Temporary use of site for a period up to five years for the Grow: Brixton project. Installation of re-purposed shipping containers (up to a maximum of four in height) to provide studios, live/work spaces, workspaces, retail units, workshops, bar/cafe, performance space and green spaces) granted 06.05.2015. Original condition states: This permission shall be for a limited period only, expiring on 30th September 2024. On or before that date any building or works carried out under this permission shall be removed and the land reinstated, unless the prior written approval of the Local Planning Authority is obtained to any variation. Variation sought: To enable the temporary planning permission for Pop Brixton to continue for a further temporary period, expiring on 30 September 2029.
Granted Amendments 6 docs -
St Johns Buildings Canterbury Crescent London SW9 7QH
Internal alterations, installation of partition walls at ground and mezzanine level to 5 St Johns Building.
Granted Heritage and listed buildings 14 docs -
St Johns Buildings Canterbury Crescent London Lambeth SW9 7QH
Front Car Park: T1 Lime: Crown reduction of up to 25% by pruning branches back by a maximum of 2.5 meters and carry out crown lifting to a height of 5 meters above ground level. T2 Lime: Crown reduction of up to 25% by pruning branches back by a maximum of 3.5 meters and carry out crown lifting to a height of 5.5 meters above ground level.
Granted Trees 6 docs -
21 - 25 Beehive Place London SW9 7QR
78% historically approved · decision due ~6 Apr
Change of use from education use (Use Class F1) to 3x residential dwellings (Use Class C3) and installation of balcony for each unit (east elevation).
Awaiting decision Full applications 10 docs -
Arches 22, 23 And 24 Valentia Place London SW9 8PJ
Change of use of Arches 22 and 23 (Use Class B8) to flexible retail/storage (Use Class A1/B8), and creation of new temporary mezzanine floor at first floor level (Use Class A1/A3/A4/D1/D2) to be linked to the temporary mezzanine unit above service yard in Brixton Village Market, and alterations to arches 22, 23 and 24 including the installation of new steel staircase and handrail to first floor level, alterations to elevations including the installation of new roller shutters and new doors , new escape route to Arch 23 and other associated works.
Granted Full applications 22 docs
Other less common application types
In Lambeth
-
26/02491/RG3 Awaiting decision
Rosendale Primary School Grace Church Rosendale Road London SE21 8LR
Demolition of the existing School Keeper's House and erection of a new two-storey building with a new entrance from Turney Road and associated landscape works.
-
26/02343/RG4 Awaiting decision
Brockwell Park Dulwich Road London SE24 0PA
Temporary use of part of Brockwell Park for funfair events to occur twice a calendar year over a five-year period from 2027 to 2031, involving the installation and de-installation of temporary infrastructure including fencing, rides, lighting, and other temporary structures and ancillary works.
-
26/00799/RG3 Granted
14 Fraser House Albion Avenue London Lambeth SW8 2AR
Replacement of single glazed timber framed windows serving flat 14, with single glazed timber framed windows (like for like replacement)
-
26/00185/RG4 Withdrawn
Clapham Common London SW4 9DE
Temporary use of part of Clapham Common at the Clapham Common Event Site for 2026 FIFA World Cup Fan Zone event for up to 59 days in 2026 involving the installation and de-installation of temporary infrastructure including fencing, screens, lighting, public address (PA) systems and other temporary structures and ancillary works
-
25/03407/RG3 Granted
35 Dulwich Road London Lambeth SE24 0NJ
Replacement of single glazed timber sash windows with like-for-like double glazed timber windows (works to flat A, B and C).