Planning application
Lindisfarne Biggar Village Barrow-In-Furness Cumbria LA14 3YG
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of conservatory and replacement with a single storey integrated garden room.
As published by the council, reference B21/2026/0267
Application record
- Reference
- B21/2026/0267
- Type
- Other
- Status
- Undecided
- Received
- 14 Jul 2026
- Validated
- 14 Jul 2026
- Postcode
- LA14 3YG
Timeline
Dates from the published record
-
14 Jul 2026
Received by Lake District National Park
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lake District National Park took a median of 54 days over the applications it decided in the last year.
What happens while it is decided
This application is with Lake District National Park for determination, against a statutory target of eight weeks. Over the last year Lake District National Park decided less common application types in a median of 31 days. More in our guide to how long planning decisions take.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
New Inn Biggar Village Barrow-in-Furness Cumbria LA14 3YG
Listed Building Consent for the division of the New Inn by conversion of existing modern ancillary accommodation and garage into two new separate 3-bedroom dwellings including the division of garden and creation of 6 designated parking spaces to allow 2 spaces for each dwelling - three dwellings in total (Re-submission B23/2020/0345)
Refused Heritage and listed buildingsSeveral homes -
New Inn Biggar Village Barrow-in-Furness Cumbria LA14 3YG
Division of the New Inn by conversion of existing modern ancillary accommodation and garage into two new separate 3-bedroom dwellings including the division of garden and creation of 6 designated parking spaces to allow 2 spaces for each dwelling - three dwellings in total (Re-submission B13/2020/0346)
RefusedSeveral homes -
Lindisfarne Biggar Village Barrow-In-Furness Cumbria LA14 3YG
94% historically approved · decision due ~8 Sep
Demolition of conservatory and replacement with a single storey integrated garden room.
Awaiting decision Other Extension DemolitionSmall domestic
Other less common application types
In Lake District National Park
-
BPA8/2026/0383 Awaiting decision
97 Rawlinson Street Barrow-In-Furness Cumbria LA14 2DT
Internal refurbishment including plasterwork, plumbing, electrical, new kitchen, bathroom and one new window on the ground floor rear elevation
-
2026/1519/OHLI Granted
Land at Low Wood Edge Beetham MILNTHORPE LA7 7AJ
Replacement of existing poles in situ and replace the open wire conductors with Aerial Bundled Conductors (ABC)
-
2026/1508/OHLI Granted
Power Line along Black Dyke Road Arnside CARNFORTH LA5 0HH
Replacement of existing poles in situ and replace the existing open wire conductors with Aerial Bundled Conductor (ABC) under permitted development rights
-
B12/2026/0339 Awaiting decision
North Quay and North Quay Hardstanding, Devonshire Dock Complex, Barrow in Furness, Cumbria, LA14 2JW.
Demolition of existing structures and installation of welfare and office accommodation facilities, security cabin, construction of a build environment structure, materials stores and associated works (amended description)
-
3/26/9001 Awaiting decision
Land to south of septic tank/west of Brampton Beck Brampton Appleby-in-Westmorland Cumbria CA16 6JS
Extension of existing Septic Tank site to accommodate upgraded wastewater treatment infrastructure, alterations to existing highway access, creation of new access track and associated land reprofiling, landscaping and associated ancillary development.