Skip to content
PlanIndex Get alerts
Menu

Planning application

30 Flass Lane Barrow-in-Furness Cumbria LA13 0AD

Awaiting decision Lake District National Park B21/2026/0041 Other

Works: Extension Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of existing garage and creation of double storey side extension comprising garage and 2 bedrooms.

As published by the council, reference B21/2026/0041

Application record

Reference
B21/2026/0041
Type
Other
Status
Undecided
Received
17 Mar 2026
Validated
17 Mar 2026
Postcode
LA13 0AD

Timeline

Dates from the published record

  1. 17 Mar 2026

    Received by Lake District National Park

  2. 27 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 12 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Lake District National Park took a median of 54 days over the applications it decided in the last year.

What happens while it is decided

This application is with Lake District National Park for determination, against a statutory target of eight weeks. Over the last year Lake District National Park decided less common application types in a median of 31 days. More in our guide to how long planning decisions take.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 30 Flass Lane Barrow-in-Furness Cumbria LA13 0AD

    B21/2026/0041 Submitted 17 Mar 2026 50 yards away

    94% historically approved · decision due ~12 May

    Demolition of existing garage and creation of double storey side extension comprising garage and 2 bedrooms.

    Awaiting decision Other Extension Demolition
  • Bevan House Stackwood Avenue Barrow-in-Furness Cumbria LA13 9HQ

    B28/2019/0724 Submitted 15 Oct 2019 200 yards away

    Application for approval of details reserved by Condition No. 3 (asbestos survey) and No 4 (Construction Traffic Management Plan) of planning permission 2017/0168 (Demolition of existing care home and the erection of 18 dwellings including parking spaces and associated site works (amended description)

    Granted Conditions Demolition
    Major scheme
  • Bevan House Stackwood Avenue Barrow-in-Furness Cumbria LA13 9HQ

    B28/2019/0724 Submitted 15 Oct 2019 200 yards away

    Application for approval of details reserved by Condition No. 3 (asbestos survey) and No 4 (Construction Traffic Management Plan) of planning permission 2017/0168 (Demolition of existing care home and the erection of 18 dwellings including parking spaces and associated site works (amended description)

    Granted Conditions Demolition
    Major scheme
  • Land opposite 78-92 Flass Lane Barrow-In-Furness Cumbria LA13 0DE

    B28/2025/0510 Submitted 11 Dec 2025 250 yards away

    Establishment of a Combined Sewer Overflow (CSO) facility including permanent ground level changes, associated infrastructure (above ground vent stack and control kiosk) fencing, hardstanding and new vehicular access.

    Granted
  • Land opposite 78-92 Flass Lane Barrow-In-Furness Cumbria LA13 0DE

    BCO/2025/0510 Submitted 11 Dec 2025 250 yards away

    94% historically approved · decision due ~5 Feb

    Consultation _ Establishment of a Combined Sewer Overflow (CSO) facility including permanent ground level changes, associated infrastructure (above ground vent stack and control kiosk) fencing, hardstanding and new vehicular access.

    Awaiting decision Outline
  • Opposite 70-78 Flass Lane Barrow-In-Furness Cumbria LA13 0DE

    B28/2026/0003 Submitted 6 Jan 2026 250 yards away

    98% historically approved · decision due ~3 Mar

    Application for hedgerow removal notice - Removal of 60m of hedgerow to facilitate construction works on behalf United Utilities

    Awaiting decision Trees

In Lake District National Park

  • BPA8/2026/0383 Awaiting decision

    97 Rawlinson Street Barrow-In-Furness Cumbria LA14 2DT

    Internal refurbishment including plasterwork, plumbing, electrical, new kitchen, bathroom and one new window on the ground floor rear elevation

    Received 24 Sep, published by the council 6 Oct 2026 Other
  • 2026/1519/OHLI Granted

    Land at Low Wood Edge Beetham MILNTHORPE LA7 7AJ

    Replacement of existing poles in situ and replace the open wire conductors with Aerial Bundled Conductors (ABC)

    Received 30 Jul, published by the council 9 Aug 2026 Other
  • 2026/1508/OHLI Granted

    Power Line along Black Dyke Road Arnside CARNFORTH LA5 0HH

    Replacement of existing poles in situ and replace the existing open wire conductors with Aerial Bundled Conductor (ABC) under permitted development rights

    Received 28 Jul, published by the council 9 Aug 2026 Other
  • B12/2026/0339 Awaiting decision

    North Quay and North Quay Hardstanding, Devonshire Dock Complex, Barrow in Furness, Cumbria, LA14 2JW.

    Demolition of existing structures and installation of welfare and office accommodation facilities, security cabin, construction of a build environment structure, materials stores and associated works (amended description)

    Received 8 Sep, published by the council 22 Sep 2026 Other
  • 3/26/9001 Awaiting decision

    Land to south of septic tank/west of Brampton Beck Brampton Appleby-in-Westmorland Cumbria CA16 6JS

    Extension of existing Septic Tank site to accommodate upgraded wastewater treatment infrastructure, alterations to existing highway access, creation of new access track and associated land reprofiling, landscaping and associated ancillary development.

    Received 7 Sep, published by the council 11 Sep 2026 Other