Planning application
Land Adjacent To 1 Swains End Swains Road Bembridge Isle Of Wight
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Lawful Development Certificate for proposed replacement static caravan
As published by the council, reference 26/01201/CLPUD
Application record
- Reference
- 26/01201/CLPUD
- Type
- LDC Proposed
- Status
- Registered
- Received
- 1 Sep 2026
- Validated
- 8 Sep 2026
- Ward
- Bembridge
Site history
Applications at this address on the Isle of Wight register
This site has had 3 applications since 2020: 1 approved, 1 refused.
-
25/01254/TW Granted
Land Adjacent To 1 Swains End Swains Road Bembridge Isle Of Wight
Amendments to proposed works (18/11/205): T1; Monterey cyprus (south west corner) - Full removal of end tree of group. T2; Monterey cyprus (next to T3 along boundary) - Full removal. T3; Sycamore (along footpath - southern boundary mid-way) - Full removal. T4; Sycamore (by postbox corner) - Full removal. T5; Sycamore (along wall to sea) - Reduce by half.
-
20/00530/FUL Refused
Land Adjacent To 1 Swains End Swains Road Bembridge Isle Of Wight
Proposed dwelling (revised scheme)(tree and ecology information available)(readvertised application)
Timeline
Dates from the published record
-
1 Sep 2026
Received by Isle of Wight
-
8 Sep 2026
Validated
Checked as complete and ready for consideration.
-
8 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Isle of Wight took a median of 57 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Isle of Wight for determination, against a statutory target of eight weeks. Over the last year Isle of Wight decided outline applications in a median of 56 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Isle of Wight
-
26/01370/OUT Awaiting decision
Norman Court Quarry View Newport Isle Of Wight PO30 5GH
Outline for one building to provide four flats and associated parking
-
26/00731/16APA Granted
Span Farm Radio Mast Stenbury Down Off Rew Lane Wroxall Isle Of Wight
Prior approval for back up power diesel generator and all ancillary development
-
26/00700/CLPUD Granted
Devonia Norton Green Freshwater Isle Of Wight PO40 9RU
Lawful Development Certificate for demolition of existing single storey rear extension; Proposed single storey rear extension
-
26/00666/CLPUD Withdrawn
Vayres Farm Whitcombe Road Newport Isle Of Wight PO30 3DY
Lawful Development Certificate for installation of roof mounted solar panels on existing outbuilding
-
26/00553/CLPUD Refused
Unit 5 7 Riverway Newport Isle Of Wight PO30 5UX
Lawful Development Certificate for proposed installation of four windows on side elevation, new roller shutter door on front elevation, replacement of old shutter door with door and window, new palisade fencing