Planning application
Tir yn / Land at Carrog Ganol, Rhosgoch,
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais llawn i osod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Full application for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
As published by the council, reference FPL/2025/325
Application record
- Reference
- FPL/2025/325
- Type
- Full Planning Permission
- Status
- Closed
- Decision
- Caniatáu gyda Amodau / Permitted with Conditions
- Received
- 23 Dec 2025
- Validated
- 23 Dec 2025
- Decided
- 19 Jun 2026
- Ward
- Twrcelyn
- Parish
- Llanbadrig
- Decision by
- Dirprwyedig / Delegated
Timeline
Dates from the published record
-
23 Dec 2025
Received by Isle of Anglesey
-
19 Jun 2026
Decision issued: Caniatáu gyda Amodau / Permitted with Conditions
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
50 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
System Storio Ynni Batri / Battery Energy Storage System, Rhosgoch
Barn sgrinio ar gyfer yr is-orsaf barhaol a'r cebl tanddaearol er mwyn gysylltu i'r System Storio Ynni Batri a ganiatawyd yn flaenorol yn / Screening opinion for the permanent substation and underground cable to allow the connection of a previously approved Battery Energy Storage System at
Decided Outline 2 docs -
Tir yn / Land at Carrog Ganol, Rhosgoch,
Gosod system storio ynni batri, ynghyd ag is-orsaf, gorsafoedd newidyddion, mynedfeydd i’r safle, traciau mynediad mewnol, mesurau diogelwch, giatiau mynediad, isadeiledd ategol arall a gwelliannau tirlunio a bioamrywiaeth ar / Installation of battery energy storage system, together with substation, transformer stations, site accesses, internal access tracks, security measures, access gates, other ancillary infrastructure and landscaping and biodiversity enhancements on
Decided 25 docs -
Land at Carrog Ganol, Rhosgoch
Barn sgrinio ar gyfer system storio ynni batri ar dir amaethyddol yn / Screening opinion for a battery energy storage system on an area of agricultural land at
Decided Outline 3 docs -
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
Decided Outline 2 docs
Other full applications applications
In Isle of Anglesey
-
FPL/2026/85 Granted
31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.
Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at
-
FPL/2026/69 Granted
Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead
Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at
-
FPL/2026/40 Granted
Cumbria, High Street, Rhosneigr.
Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at
-
FPL/2026/38 Granted
Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.
Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at
-
FPL/2025/285 Granted
Cefn Coch, Llanfechell
Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at