Planning application
Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at
As published by the council, reference SCR/2026/20
Application record
- Reference
- SCR/2026/20
- Type
- Outline
- Status
- Permitted
- Decision
- Dim Angen AEA / EIA Not Required
- Received
- 17 Apr 2026
- Validated
- 17 Apr 2026
- Decided
- 7 May 2026
- Ward
- Aethwy
- Parish
- Menai Bridge
- Decision by
- Delegated
Timeline
Dates from the published record
-
17 Apr 2026
Received by Isle of Anglesey
-
7 May 2026
Decision issued: Dim Angen AEA / EIA Not Required
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge
Cais llawn i leoli cynhwysydd a lloches yn / Full application for the siting of a container and shelter at
Decided Full applications 10 docs -
Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge
Cais i lleoli arwydd heb ei oleuo yn / Application for the siting of a non-illuminated sign at
Decided Advertising 4 docs -
Llawr Cyntaf, Y Ciwb, 30 Cil-Bedlam, Porthaethwy / First Floor, Y Ciwb, 30 Dale Street, Menai Bridge.
Cais o dan Adran 73 i amrywio amod (03) (Cynlluniau a Ganiatawyd) o ganiatâd cynllunio rhif FPL/2021/325 (addasu ac ehangu gan gynnwys creu uned breswyl ychwanegol i'r llawr cyntaf) er mwyn newid y dyluniad yn / Application under Section 73 for the variation of condition (03) (Approved plans) of planning permission FPL/2021/325 (alterations and extensions to include the creation of an additional residential unit to the first floor) so as to allow an amended design at
Granted Amendments Extension 7 docs -
30 Cil-Bedlam, Porthaethwy / 30 Dale Street Menai Bridge
Cais ol-weithredol ar gyfer lleoli arwydd heb ei oleuo yn / Retrospective application for the siting of a non-illuminated sign at
Granted Advertising 5 docs -
Bryn Aethwy, Lon Pen Nebo/Hill Street, Porthaethwy/Menai Bridge
Cais llawn ar gyfer newid defnydd llety gwyliau tymor byr (dosbarth defnydd C6) yn gartref preswyl i blant yn / Full application for the change of use of a short term holiday let (use class C6) into a residential children's home (use class C2) at
Refused Amendments 8 docs -
Dolgoed Ffordd Mona Road, Porthaethwy/Menai Bridge
Rhybudd ynghylch gwaith ar goed mewn Ardal Gadwraeth yn / Notification of works to trees in a Conservation Area at
Granted Trees 5 docs
Other outline applications
In Isle of Anglesey
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Granted
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at
-
OP/2025/9 Granted
Craig Owen, Llanbedrgoch
Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to
-
SCR/2026/17 Decided
Llanerchymedd Wastewater Treatment Works.
Barn Sgrinio ar gyfer gosod gwaith prosesu newydd a seilwaith cysylltiedig ar dir ger / Screening Opinion for the installation of a new processing plant and associated infrastructure on land adjacent to