Skip to content
PlanIndex Get alerts
Menu

Planning application

Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge

Decided Isle of Anglesey SCR/2026/20 Outline

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at

As published by the council, reference SCR/2026/20

Application record

Reference
SCR/2026/20
Type
Outline
Status
Permitted
Decision
Dim Angen AEA / EIA Not Required
Received
17 Apr 2026
Validated
17 Apr 2026
Decided
7 May 2026
Ward
Aethwy
Parish
Menai Bridge
Decision by
Delegated

Timeline

Dates from the published record

  1. 17 Apr 2026

    Received by Isle of Anglesey

  2. 7 May 2026

    Decision issued: Dim Angen AEA / EIA Not Required

  3. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

In Isle of Anglesey

  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    1 May 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    12 Mar 2026 Outline
  • DAG/2026/10 Granted

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    22 Apr 2026 Outline
  • OP/2025/9 Granted

    Craig Owen, Llanbedrgoch

    Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to

    20 Nov 2025 Outline
  • SCR/2026/17 Decided

    Llanerchymedd Wastewater Treatment Works.

    Barn Sgrinio ar gyfer gosod gwaith prosesu newydd a seilwaith cysylltiedig ar dir ger / Screening Opinion for the installation of a new processing plant and associated infrastructure on land adjacent to

    26 Mar 2026 Outline