Skip to content
PlanIndex Get alerts
Menu

Planning application

Maes Carafannau Silver Bay Caravan Park, Rhoscolyn.

Decided Isle of Anglesey SCR/2024/56 Outline

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Barn sgrinio ar gyfer diwygio'r ffin llinell goch gymeradwy (a gymeradwywyd yn flaenorol o dan y cyfeirnod caniatâd cynllunio 43C95) i gynnwys tir i'r de a'r de-ddwyrain ynghyd â chadw'r gwaith anawdurdodedig sy'n cynnwys gweithrediadau peirianyddol a'r newid defnydd materol o dir ar gyfer lleoli 7 chalet ychwanegol ar dir ar dir yn / Screening opinion for the amendment to the approved red line boundary (previously approved under planning permission reference 43C95) to include land to the south and south-east together with the retention of the unauthorised works comprising of engineering operations and the material change of use of land for the siting of 7 additional chalets on land at

As published by the council, reference SCR/2024/56

Application record

Reference
SCR/2024/56
Type
Outline
Status
Permitted
Decision
Dim Angen AEA / EIA Not Required
Received
21 Oct 2024
Validated
21 Oct 2024
Decided
15 Nov 2024
Ward
Ynys Gybi
Parish
Rhoscolyn
Decision by
Delegated

Site history

Applications at this address on the Isle of Anglesey register

This site has had 2 applications since 2024.

  • SCR/2026/3 Decided

    Maes Carafannau Silver Bay Caravan Park, Rhoscolyn.

    Barn sgrinio ar gyfer ail-drefnu’r safle er mwyn cadw’r 25 carafán/caban gwyliau (19 o fewn terfyn y parc sydd wedi’i gymeradwyo, 6 i’r dwyrain sy’n ffurfio estyniad i’r parc gwyliau – y cyfanswm o 25 o fewn y cyfanswm a ganiateir ar gyfer y parc yn ei gyfanrwydd), ynghyd â’r holl ddatblygiadau gweithredol (yn cynnwys ffyrdd safle, lleiniau caled a gwaith peirianneg) gyda gwelliannau amgylcheddol ychwanegol yn / Screening opinion for the reorganisation of the site for the retention of 25 holiday caravans/lodges (19 within the approved boundary of the park, 6 to the east forming an extension to the holiday park – all 25 being within the permitted total for the park as a whole), together with all operational development (including site roads, hardstandings and engineering works) with additional environmental improvements at

    Decided 13 Feb 2026 Outline

Timeline

Dates from the published record

  1. 21 Oct 2024

    Received by Isle of Anglesey

  2. 15 Nov 2024

    Decision issued: Dim Angen AEA / EIA Not Required

  3. 16 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Silver Bay Holiday Village, Pentre Gwyddel, Rhoscolyn, LL65 2RZ

    LUE/2023/10 Submitted 6 Apr 2023 50 yards away

    Cais am Dystysgrif Datblygiad Cyfreithlon ar gyfer y defnydd presennol a wneir o'r tir fel rhan cysylltiedig o'r pentref gwyliau yn / Application for a Lawful Development Certificate for the existing use of the land as an incidental part of the holiday village at

    Withdrawn Amendments 5 docs
  • Silver Bay Holiday Park,Pentre Gwyddel, Rhoscolyn.

    LUE/2021/26 Submitted 22 Dec 2021 50 yards away

    Cais am Dystysgrif Datblygiad Cyfreithlon ar gyfer y defnydd presennol a wneir o'r tir fel rhan annatod o'r pentref gwyliau yn / Application for a Lawful Development Certificate for the existing use of the land as an integral part of the holiday village

    Refused Amendments 11 docs
  • Caravan Park, Silver Bay, Rhoscolyn

    FPL/2026/36 Submitted 17 Feb 2026 50 yards away

    Cais ôl-weithredol ar gyfer ail-drefnu’r safle er mwyn cadw’r 25 carafán/caban gwyliau (19 o fewn terfyn y parc sydd wedi’i gymeradwyo, 6 i’r dwyrain sy’n ffurfio estyniad i’r parc gwyliau – y cyfanswm o 25 o fewn y cyfanswm a ganiateir ar gyfer y parc yn ei gyfanrwydd), ynghyd â’r holl ddatblygiadau gweithredol (yn cynnwys ffyrdd safle, lleiniau caled a gwaith peirianneg) gyda gwelliannau amgylcheddol ychwanegol yn / Retrospective application for the reorganisation of the site for the retention of 25 holiday caravans/lodges (19 within the approved boundary of the park, 6 to the east forming an extension to the holiday park – all 25 being within the permitted total for the park as a whole), together with all operational development (including site roads, hardstandings and engineering works) with additional environmental improvements at

    Decided Full applications Extension 19 docs
  • Caravan Park, Silver Bay, Rhoscolyn, Caergybi/ Holyhead

    LUP/2023/2 Submitted 24 Jan 2023 50 yards away

    Cais am Dystysgrif Cyfreithlondeb ar gyfer y defnydd arfaethedig o dir ar gyfer lleoli 6 carafán statig, ynghyd â mannau caled cysylltiedig, i'w meddiannu at ddibenion gwyliau yn / Application for a Certificate of Lawfulness for the proposed use of land for the siting of 6 static caravan, together with associated hardstanding, to be occupied for holiday purposes at

    Granted Lawful development 8 docs
  • Maes Carafannau / Caravan Park, Silver Bay, Rhoscolyn, Caerbygi / Holyhead

    LUE/2024/10 Submitted 17 Apr 2024 50 yards away

    Cais am Dystysgrif Datblygiad Cyfreithlon ar gyfer defnydd presennol rhan ganolog a dwyreiniol y parc ar gyfer lleoli 190 o garafannau statig, ynghyd â'r defnydd presennol o'r tir fel rhan atodol o'r pentref gwyliau yn / Application for a Lawful Development Certificate for the existing use of the central and eastern section of the park for the siting of 190 static caravans, together with the existing use of the land as an incidental part of the holiday village at

    Decided Amendments 9 docs
  • Maes Carafannau Silver Bay Caravan Park, Rhoscolyn.

    SCR/2026/3 Submitted 16 Jan 2026 50 yards away

    Barn sgrinio ar gyfer ail-drefnu’r safle er mwyn cadw’r 25 carafán/caban gwyliau (19 o fewn terfyn y parc sydd wedi’i gymeradwyo, 6 i’r dwyrain sy’n ffurfio estyniad i’r parc gwyliau – y cyfanswm o 25 o fewn y cyfanswm a ganiateir ar gyfer y parc yn ei gyfanrwydd), ynghyd â’r holl ddatblygiadau gweithredol (yn cynnwys ffyrdd safle, lleiniau caled a gwaith peirianneg) gyda gwelliannau amgylcheddol ychwanegol yn / Screening opinion for the reorganisation of the site for the retention of 25 holiday caravans/lodges (19 within the approved boundary of the park, 6 to the east forming an extension to the holiday park – all 25 being within the permitted total for the park as a whole), together with all operational development (including site roads, hardstandings and engineering works) with additional environmental improvements at

    Decided Outline Extension 3 docs

In Isle of Anglesey

  • GWY/2026/2 Decided

    Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP

    Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.

    Received 2 Sep, published by the council 16 Sep 2026 Outline
  • OP/2025/1 Granted

    Llanfawr Road, Caergybi / Holyhead.

    Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near

    Received 30 Jan, published by the council 16 Sep 2026 Outline
  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    Received 1 May, published by the council 6 Aug 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    Received 12 Mar, published by the council 6 Aug 2026 Outline
  • DAG/2026/10 Granted

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    Received 22 Apr, published by the council 6 Aug 2026 Outline