Planning application
Penrhos Works, Caergybi/Holyhead
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Barn sgrinio ar gyfer adeiladu a gweithredu is-orsaf 132kV gydag isadeiledd cysylltiedig yn cynnwys ffensys, trac mynediad newydd a cheblau tanddaearol yn / Screening opinion for the construction and operation of a 132kV substation with associated infrastructure, including fencing, new access track and underground cables at
As published by the council, reference SCR/2023/53
Application record
- Reference
- SCR/2023/53
- Type
- Outline
- Status
- Permitted
- Decision
- Dim Angen AEA / EIA Not Required
- Received
- 25 Sep 2023
- Validated
- 25 Sep 2023
- Decided
- 25 Sep 2023
- Ward
- Tref Cybi
- Parish
- Holyhead
- Decision by
- Delegated
Site history
Applications at this address on the Isle of Anglesey register
This site has had 8 applications since 2023: 3 approved, 0 refused.
-
SCR/2025/57 Decided
Penrhos Works, Caergybi/Holyhead
Barn Sgrinio i ddiwygio amod (02) (cynlluniau a gymeradwywyd) o ganiatâd cynllunio rhif FPL/2023/189 (Adeiladu a gweithredu is-orsaf 132kV gydag isadeiledd cysylltiedig yn cynnwys ffensys, trac mynediad newydd a cheblau tanddaearol) er mwyn diwygio'r dyluniad yn / Screening opinion to vary condition (02) (approved plans) of planning permission reference FPL/2023/189 (Construction and operation of a 132kV substation with associated infrastructure, including fencing, new access track and underground cables) so as to amend the design at
-
VAR/2025/57 Granted
Penrhos Works, Caergybi/Holyhead
Cais o dan Adran 73 i ddiwygio amod (02) (cynlluniau a gymeradwywyd) o ganiatâd cynllunio rhif FPL/2023/189 (Adeiladu a gweithredu is-orsaf 132kV gydag isadeiledd cysylltiedig yn cynnwys ffensys, trac mynediad newydd a cheblau tanddaearol) er mwyn diwygio'r dyluniad yn / Application under Section 73 to vary condition (02) (approved plans) of planning permission reference FPL/2023/189 (Construction and operation of a 132kV substation with associated infrastructure, including fencing, new access track and underground cables) so as to amend the design at
-
MAO/2025/23 Withdrawn
Penrhos Works, Caergybi / Holyhead.
Mân newidiadau i gynllun sydd wedi ei ganiatáu yn flaenorol o dan ganiatád cynllunio FPL/2023/189 er mwyn newid uchder a gosodiad yr is-orsaf yn / Minor amendments to scheme previously approved under planning permission FPL/2023/189 so as to amend the height and layout of the substation at
-
SCR/2023/61 Decided
Penrhos Works, Caergybi/Holyhead.
Barn Sgrinio ar gyfer System Storio Ynni Batri (BESS) a gwaith cysylltiedig yn / Screening Opinion Outline for a Battery Energy Storage System (BESS) together with associated development at
-
SCR/2023/57 Decided
Penrhos Works, Caergybi/Holyhead.
Barn sgrinio ar gyfer bennu os oes angen caniatâd blaenorol ar gyfer dymchwel adeiladau a simne yn / Screening Opinion to determine whether prior approval is required for the demolition of buildings and a chimney stack at
-
DEM/2023/6 Granted
Penrhos Works, Caergybi/Holyhead.
Cais i bennu os oes angen caniatâd blaenorol ar gyfer dymchwel adeiladau a simne yn / Application to determine whether prior approval is required for the demolition of buildings and a chimney stack at
-
FPL/2023/189 Granted
Penrhos Works, Caergybi/Holyhead
Cais llawn ar gyfer adeiladu a gweithredu is-orsaf 132kV gydag isadeiledd cysylltiedig yn cynnwys ffensys, trac mynediad newydd a cheblau tanddaearol yn / Full application for the construction and operation of a 132kV substation with associated infrastructure, including fencing, new access track and underground cables at
Timeline
Dates from the published record
-
25 Sep 2023
Received by Isle of Anglesey
-
25 Sep 2023
Decision issued: Dim Angen AEA / EIA Not Required
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Penrhos Works, Caergybi/Holyhead
Cais llawn ar gyfer adeiladu a gweithredu is-orsaf 132kV gydag isadeiledd cysylltiedig yn cynnwys ffensys, trac mynediad newydd a cheblau tanddaearol yn / Full application for the construction and operation of a 132kV substation with associated infrastructure, including fencing, new access track and underground cables at
Granted Full applications 15 docs -
Penrhos Works, Caergybi / Holyhead.
Mân newidiadau i gynllun sydd wedi ei ganiatáu yn flaenorol o dan ganiatád cynllunio FPL/2023/189 er mwyn newid uchder a gosodiad yr is-orsaf yn / Minor amendments to scheme previously approved under planning permission FPL/2023/189 so as to amend the height and layout of the substation at
Withdrawn Amendments 6 docs -
Aluminium Powder Co, London Road, Caergybi / Holyhead.
Barn sgrinio ar gyfer estyniad i'r bloc cawod / newid presennol yn / Screening opinion for an extension to the existing shower / changing block at
Decided Outline Extension 8 docs -
Aluminium Powder Co, London Road, Caergybi / Holyhead.
Cais llawn ar gyfer estyniad i'r bloc cawod / newid presennol yn / Full application for an extension to the existing shower / changing block at
Granted Full applications Extension 8 docs -
Aluminium Powder Co, London Road Caergybi/Holyhead
Cais llawn a'r gyfer dymchwel estyniad croes presennol ac adeiladu estyniad newydd i dŷ cywasgu presennol yn / Full application for the demolition of existing lean-too extension and construction of new extension to an existing compressor house.
Granted Full applications Extension Demolition 8 docs -
Penrhos Works, Caergybi/Holyhead.
Barn Sgrinio ar gyfer System Storio Ynni Batri (BESS) a gwaith cysylltiedig yn / Screening Opinion Outline for a Battery Energy Storage System (BESS) together with associated development at
Decided Outline
Other outline applications
In Isle of Anglesey
-
GWY/2026/2 Decided
Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP
Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.
-
OP/2025/1 Granted
Llanfawr Road, Caergybi / Holyhead.
Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Decided
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at