Skip to content
PlanIndex Get alerts
Menu

Planning application

Gwaith Trin Carfosaeth/Sewage Treatment Works, Caergybi/Holyhead

Decided Isle of Anglesey SCR/2021/42 Screening Opinion

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Barn sgrinio ar gyfer codi un twrbin wynt 90kw gyda uchder hwb hyd at uchafswm o 23m, diamedr rotor hyd at uchafswm o 26m a uchder blaen unionsyth hyd at uchafswm o 36m ynghyd a datblygiadau cysylltiedig ar dir yn / Screening opinion for the erection of one 90kw wind turbine with a maximum hub height of up to 23m, rotor diameter of up to 26m and a maximum upright vertical tip height of up to 36m together with associated development on land at

As published by the council, reference SCR/2021/42

Application record

Reference
SCR/2021/42
Type
Screening Opinion
Status
Closed
Decision
Dim Angen AEA / EIA Not Required
Received
10 Jun 2021
Validated
10 Jun 2021
Decided
23 Jul 2021
Ward
Tref Cybi
Parish
Holyhead
Decision by
Dirprwyedig / Delegated

Timeline

Dates from the published record

  1. 10 Jun 2021

    Received by Isle of Anglesey

  2. 23 Jul 2021

    Decision issued: Dim Angen AEA / EIA Not Required

  3. 20 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Isle of Anglesey

  • GWY/2026/2 Decided

    Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP

    Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.

    Received 2 Sep, published by the council 16 Sep 2026 Outline
  • OP/2025/1 Granted

    Llanfawr Road, Caergybi / Holyhead.

    Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near

    Received 30 Jan, published by the council 16 Sep 2026 Outline
  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    Received 1 May, published by the council 6 Aug 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    Received 12 Mar, published by the council 6 Aug 2026 Outline
  • DAG/2026/10 Granted

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    Received 22 Apr, published by the council 6 Aug 2026 Outline