Skip to content
PlanIndex Get alerts
Menu

Planning application

Maes Carafanau Tan Y Graig, Lon St Ffraid, Bae Treaddur, Caergybi / Tan Y Graig Caravan Park, St Ffraid Road, Treaddur Bay, Holyhead

Decided Isle of Anglesey SCR/2020/50 Outline

Works: Extension

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Barn sgrinio ar gyfer FPL/2020/173: Cais llawn am estyn y safle teithiol presennol ar gyfer ychwanegu 10 llain ychwanegol yn / Screening opinion for FPL/2020/173: Full application for the extension of existing touring site for the addition of 10 additional Pitches at

As published by the council, reference SCR/2020/50

Application record

Reference
SCR/2020/50
Type
Outline
Status
Permitted
Decision
Dim Angen AEA / EIA Not Required
Received
15 Sep 2020
Validated
15 Sep 2020
Decided
10 Jun 2020
Ward
Ynys Gybi
Parish
Trearddur
Decision by
Delegated

Site history

Applications at this address on the Isle of Anglesey register

This site has had 5 applications since 2020: 1 approved, 0 refused.

  • SCR/2025/3 Withdrawn

    Maes Carafanau Tan Y Graig, Lon St Ffraid, Bae Treaddur, Caergybi / Tan Y Graig Caravan Park, St Ffraid Road, Treaddur Bay, Holyhead

    Barn sgrinio ar gyfer cais o dan Adran 73 e i amrywio amod (02) (dim mwy na 30 o garafanau teithiol) caniatâd cynllunio VAR/2022/1 (caniatau 4 llain ychwanegol o fewn yr ardal gymeradwy) er mwyn lleoli 6 llain ychwanegol i gynyddu nifer y carafanau teithiol ar y safle i 40 yn / Screening opinion for an application under Section 73 for the variation of condition (02) (no more than 30 touring caravans) of planning permission VAR/2022/1 (to allow an additional 4 pitches within the approved area) so as to site an additional 6 pitches to increase the number of touring caravans on the site to 40 at

    Decided 7 Feb 2025 Outline
  • VAR/2025/2 Withdrawn

    Maes Carafanau Tan Y Graig, Lon St Ffraid, Bae Treaddur, Caergybi / Tan Y Graig Caravan Park, St Ffraid Road, Treaddur Bay, Holyhead

    Cais o dan Adran 73 e i amrywio amod (02) (dim mwy na 30 o garafanau teithiol) caniatâd cynllunio VAR/2022/1 (er mwyn caniatau 4 llain ychwanegol o fewn yr ardal gymeradwy) er mwyn lleoli 6 llain ychwanegol i gynyddu nifer y carafanau teithiol ar y safle i 40 yn / Application under Section 73 for the variation of condition (02) (no more than 30 touring caravans)) of planning permission VAR/2022/1 (so as to allow an additional 4 pitches within the approved area) so as to site an additional 6 pitches to increase the number of touring caravans on the site to 40 at

    Decided 7 Feb 2025 Amendments
  • SCR/2024/57 Decided

    Maes Carafanau Tan Y Graig, Lon St Ffraid, Bae Treaddur, Caergybi / Tan Y Graig Caravan Park, St Ffraid Road, Treaddur Bay, Holyhead.

    Barn sgrinio ar gyfer amrywio amod (02) o gyfeirnod caniatâd cynllunio FPL/2020/173 i ganiatáu 10 llain arall sy'n gwneud cyfanswm o 44 llain yn / Screening opinion for varying condition (02) of planning permission reference FPL/2020/173 to permit a further 10 pitches making a total of 44 pitches at

    Decided 15 Nov 2024 Conditions
  • FPL/2020/173 Granted

    Maes Carafanau Tan Y Graig, Lon St Ffraid, Bae Treaddur, Caergybi / Tan Y Graig Caravan Park, St Ffraid Road, Treaddur Bay, Holyhead

    Cais llawn am ymestyn y safle teithiol presennol ar gyfer 10 llain ychwanegol yn/ Full application to extend the existing touring site for an additional 10 pitches at

    Decided 31 Mar 2021 Full applications

Timeline

Dates from the published record

  1. 10 Jun 2020

    Decision issued: Dim Angen AEA / EIA Not Required

  2. 15 Sep 2020

    Received by Isle of Anglesey

  3. 30 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Maes Carafanau Tan Y Graig, Lon St Ffraid, Bae Treaddur / Tan Y Graig Caravan Park, St Ffraid Road, Treaddur Bay

    VAR/2022/1 Submitted 13 Jan 2022 50 yards away

    Cais o dan Adran 73 i ddiwygio amod (02) (dim mwy na 30 o garafanau teithiol) o ganiatâd cynllunio rhif FPL/2020/173 (ymestyn y safle teithiol presennol ar gyfer 10 llain ychwanegol) er mwyn caniatau 4 llain ychwanegol o fewn yr ardal gymeradwy yn / Application under Section 73 for the variation of condition (02) (no more than 30 touring caravans) of planning permission reference FPL/2020/173 (extend the existing touring site for an additional 10 pitches) so as to allow an additional 4 pitches within the approved area at

    Granted Conditions 4 docs
  • Maes Carafanau Tan Y Graig, Lon St Ffraid, Bae Treaddur / Tan Y Graig Caravan Park, St Ffraid Road, Treaddur Bay

    SCR/2022/4 Submitted 13 Jan 2022 50 yards away

    Barn sgrinio ar gyfer cais o dan Adran 73 i ddiwygio amod (02) (dim mwy na 30 o garafanau teithiol) o ganiatâd cynllunio rhif FPL/2020/173 (ymestyn y safle teithiol presennol ar gyfer 10 llain ychwanegol) er mwyn caniatau 4 llain ychwanegol o fewn yr ardal gymeradwy yn / Screening opinion for an application under Section 73 for the variation of condition (02) (no more than 30 touring caravans) of planning permission reference FPL/2020/173 (extend the existing touring site for an additional 10 pitches) so as to allow an additional 4 pitches within the approved area at

    Decided Conditions 4 docs
  • Maes Carafanau Tan Y Graig, Lon St Ffraid, Bae Treaddur, Caergybi / Tan Y Graig Caravan Park, St Ffraid Road, Treaddur Bay, Holyhead

    VAR/2025/2 Submitted 15 Jan 2025 50 yards away

    Cais o dan Adran 73 e i amrywio amod (02) (dim mwy na 30 o garafanau teithiol) caniatâd cynllunio VAR/2022/1 (er mwyn caniatau 4 llain ychwanegol o fewn yr ardal gymeradwy) er mwyn lleoli 6 llain ychwanegol i gynyddu nifer y carafanau teithiol ar y safle i 40 yn / Application under Section 73 for the variation of condition (02) (no more than 30 touring caravans)) of planning permission VAR/2022/1 (so as to allow an additional 4 pitches within the approved area) so as to site an additional 6 pitches to increase the number of touring caravans on the site to 40 at

    Withdrawn Amendments 7 docs
  • Maes Carafanau Tan Y Graig, Lon St Ffraid, Bae Treaddur, Caergybi / Tan Y Graig Caravan Park, St Ffraid Road, Treaddur Bay, Holyhead

    FPL/2020/173 Submitted 15 Sep 2020 50 yards away

    Cais llawn am ymestyn y safle teithiol presennol ar gyfer 10 llain ychwanegol yn/ Full application to extend the existing touring site for an additional 10 pitches at

    Granted Full applications 10 docs
  • Tan Y Graig, Bae Trearddur Bay.

    FPL/2025/169 Submitted 27 Jun 2025 50 yards away

    Cais llawn ar gyfer newid defnydd ac estyniad i'r safle carafanau teithiol presennol i gynnwys ardal ar gyfer tirlunio a lliniaru ecolegol, ynghyd ag ail-gyflunio mewnol i gynnwys 4 lle ychwanegol gan wneud cyfanswm o 38 lle ar y safle yn / Full application for the change of use and extension to the existing touring caravan site to include an area for landscaping and ecology mitigation, together with internal re-configuration to include an additional 4 pitches making a total of 38 pitches on the site at

    Granted Amendments Extension 7 docs
  • Tan Y Graig, Bae Trearddur Bay.

    SCR/2025/25 Submitted 27 Jun 2025 50 yards away

    Barn sgrinio ar gyfer newid defnydd ac estyniad i'r safle carafanau teithiol presennol i gynnwys ardal ar gyfer tirlunio a lliniaru ecolegol, ynghyd ag ail-gyflunio mewnol i gynnwys 6 lle ychwanegol gan wneud cyfanswm o 40 lle ar y safle yn / Screening opinion for the change of use and extension to the existing touring caravan site to include an area for landscaping and ecology mitigation, together with internal re-configuration to include an additional 6 pitches making a total of 40 pitches on the site at

    Decided Outline Extension 7 docs

In Isle of Anglesey

  • GWY/2026/2 Decided

    Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP

    Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.

    Received 2 Sep, published by the council 16 Sep 2026 Outline
  • OP/2025/1 Granted

    Llanfawr Road, Caergybi / Holyhead.

    Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near

    Received 30 Jan, published by the council 16 Sep 2026 Outline
  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    Received 1 May, published by the council 6 Aug 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    Received 12 Mar, published by the council 6 Aug 2026 Outline
  • DAG/2026/10 Decided

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    Received 22 Apr, published by the council 6 Aug 2026 Outline