Skip to content
PlanIndex Get alerts
Menu

Planning application

Ty Newydd, Llanfair yn Neubwll

Refused Isle of Anglesey HHP/2024/4 Full

Works: Extension

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Cais llawn ar gyfer addasu ac ehangu yn cynnwys codi uchder y to i greu ystafelloedd ar y llawr cyntaf ynghyd a codi balconi yn / Full application for alterations and extensions including the raising of the height of the roof to provide first floor accommodation together with the erection of a balcony at

As published by the council, reference HHP/2024/4

Application record

Reference
HHP/2024/4
Type
Full
Status
Rejected
Decision
Gwrthod / Refused
Received
4 Jan 2024
Validated
4 Jan 2024
Decided
22 May 2024
Ward
Bro'r Llynnoedd
Parish
Llanfair-yn-Neubwll
Decision by
Delegated

Timeline

Dates from the published record

  1. 4 Jan 2024

    Received by Isle of Anglesey

  2. 22 May 2024

    Decision issued: Gwrthod / Refused

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Ty Newydd, Llanfair yn Neubwll.

    FPL/2025/247 Submitted 20 Oct 2025 0m away

    Cais llawn ar gyfer dymchwel ac amnewid yr annedd bresennol ynghyd â chreu 8 uned glampio (defnydd drwy'r flwyddyn), ystafell gemau gymunol, â gwaith cysylltiedig yn / Full application for demolition and replacement of the existing dwelling together with creation of 8 glamping units (all year round use), communal game room, along with associated works at

    Decided Full applications Demolition 18 docs
    Domestic
  • Caban Iago, Llanfair Yn Neubwll.

    LUE/2026/3 Submitted 6 Mar 2026 128m away

    Cais am Dystysgrif Datblygiad Cyfreithlon ar gyfer defnydd presennol y garafan statig fel uned preswyl yn / Application for a Lawful Development Certificate for the existing use of the static caravan as a residential unit at

    Decided Lawful development 7 docs
  • Ty Mawr Farm, Y Fali / Valley

    D56/2022/3 Submitted 20 Jun 2022 254m away

    Cais llawn ar gyfer gosod mast telathrebu 15m steil polyn telegraff, antenâu, cypyrddau offer ar y ddaear, cyfansawdd wedi ei ffensio a datblygiad cysylltiedig ar dir ger / Full application for the installation of a 15m telegraph pole style telecommunication mast, antennas, ground-based equipment cabinets, a fenced compound and associated development on land near

    Withdrawn Telecoms 18 docs
  • Tir yn Ty Mawr Farm, Valley / Land at Ty Mawr Farm, Valley,

    D56/2023/1 Submitted 20 Feb 2023 254m away

    Cais llawn ar gyfer rhoi hysbysiad ymlaen llaw i osod mast cyfathrebu o fath polyn telegraff 15 Metr, antenau, offer sydd wedi’i osod ar y ddaear ynghyd a datblygiad ategol yn / Full application for prior notification for the installation of a 15M telegraph pole style communications mast, antennas, ground based apparatus together with ancillary development at

    Decided Telecoms 8 docs

In Isle of Anglesey

  • FPL/2026/85 Granted

    31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.

    Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at

    17 Apr 2026 Full applications
  • FPL/2026/69 Granted

    Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead

    Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at

    31 Mar 2026 Full applications
  • FPL/2026/40 Granted

    Cumbria, High Street, Rhosneigr.

    Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at

    23 Feb 2026 Full applications
  • FPL/2026/38 Granted

    Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.

    Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at

    18 Feb 2026 Full applications
  • FPL/2025/285 Granted

    Cefn Coch, Llanfechell

    Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at

    25 Nov 2025 Full applications