Planning application
Caban Iago, Llanfair Yn Neubwll.
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Cais am Dystysgrif Datblygiad Cyfreithlon ar gyfer defnydd presennol y garafan statig fel uned preswyl yn / Application for a Lawful Development Certificate for the existing use of the static caravan as a residential unit at
As published by the council, reference LUE/2026/3
Application record
- Reference
- LUE/2026/3
- Type
- Lawful development: Existing use
- Status
- Under Review
- Decision
- Heb Benderfyniad / Not yet determined
- Received
- 6 Mar 2026
- Validated
- 15 Apr 2026
- Ward
- Bro'r Llynnoedd
- Parish
- Llanfair-yn-Neubwll
- Decision by
- Dirprwyedig / Delegated
Timeline
Dates from the published record
-
6 Mar 2026
Received by Isle of Anglesey
-
15 Apr 2026
Validated
Checked as complete and ready for consideration.
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Ty Newydd, Llanfair yn Neubwll
Cais llawn ar gyfer addasu ac ehangu yn cynnwys codi uchder y to i greu ystafelloedd ar y llawr cyntaf ynghyd a codi balconi yn / Full application for alterations and extensions including the raising of the height of the roof to provide first floor accommodation together with the erection of a balcony at
Refused Full applications Extension 15 docs -
Ty Newydd, Llanfair yn Neubwll.
Cais llawn ar gyfer dymchwel ac amnewid yr annedd bresennol ynghyd â chreu 8 uned glampio (defnydd drwy'r flwyddyn), ystafell gemau gymunol, â gwaith cysylltiedig yn / Full application for demolition and replacement of the existing dwelling together with creation of 8 glamping units (all year round use), communal game room, along with associated works at
Decided Full applications Demolition 18 docsDomestic -
Ty Mawr Farm, Y Fali / Valley
Cais llawn ar gyfer gosod mast telathrebu 15m steil polyn telegraff, antenâu, cypyrddau offer ar y ddaear, cyfansawdd wedi ei ffensio a datblygiad cysylltiedig ar dir ger / Full application for the installation of a 15m telegraph pole style telecommunication mast, antennas, ground-based equipment cabinets, a fenced compound and associated development on land near
Withdrawn Telecoms 18 docs -
Tir yn Ty Mawr Farm, Valley / Land at Ty Mawr Farm, Valley,
Cais llawn ar gyfer rhoi hysbysiad ymlaen llaw i osod mast cyfathrebu o fath polyn telegraff 15 Metr, antenau, offer sydd wedi’i osod ar y ddaear ynghyd a datblygiad ategol yn / Full application for prior notification for the installation of a 15M telegraph pole style communications mast, antennas, ground based apparatus together with ancillary development at
Refused Telecoms 8 docs -
Treflesg, Llanfair Yn Neubwll
Cais llawn i addasu ac ehangu ynghyd â gwaith cysylltiedig yn/ Full application for alterations and extensions together with associated works at
Granted Full applications Extension 9 docs -
Cae Ellen, Llanfair yn Neubwll.
Barn sgrinio ôl-weithredol ar gyfer cadw siop amaethyddol a stabl yn / Retrospective screening opinion for the retention of an agricultural store and stable at
Decided Outline 8 docs
Other lawful development applications
In Isle of Anglesey
-
LUE/2025/11 Refused
Trewan Sands Caravan Park, Bryngwran
Cais am Dystysgrif Datblygiad Cyfreithlon ar gyfer defnydd presennol o'r tir fel safle tymhorol ar gyfer carafanau teithiol, pebyll, a chartrefi modur ers dros 10 mlynedd yn / Application for a Lawful Development Certificate for the existing use of the land as a seasonal site for touring caravans, tents, and motorhomes for over 10 years at
-
LUE/2026/2 Granted
Tal y Foel Stables, Dwyran.
Cais am Dystysgrif Cyfreithlondeb ar gyfer lleoli a defnyddio carafan statig fel llety rheolwr/gweithwyr yn / Application for a Certificate of Lawfulness for the siting and use of static caravan as managers/workers accommodation at
-
LUE/2025/47 Granted
Penllain Caravan Park, Tyn y Gongl
Cais am Dystysgrif Datblygiad Cyfreithlon ar gyfer defnydd presennol o un pod ar gyfer llety gwyliau dros yr haf am 10 mlynedd yn / Application for a Lawful Development Certificate for the existing use of one pod as seasonal holiday let for over 10 years at
-
LUE/2026/5 Granted
Bryn Cwr, Gwalchmai
Cais am Dystysgrif Cyfreithlondeb o ddatblygiad presennol mewn perthynas â chychwyn gwaith materol ar ganiatâd cynllunio 48C131C (newid amod (17) er mwyn ail-leoli ag ailgyfeiriadu yr uned peirianneg wedi ei ganiatáu o dan gais rhif 48C131B) ar dir i'r gogledd o / Application for a Certificate of Lawfulness of existing development in relation to a material start having been made on planning permission reference 48C131C (variation of condition (17) so as to allow relocation and reorientation of the engineering unit from planning consent 48C131B) on land north of
-
LUE/2026/6 Granted
Little Chef, Gaerwen
Cais am Dystysgrif Cyfreithlondeb o ddatblygiad presennol mewn perthynas â chychwyn gwaith materol ar ganiatâd cynllunio FPL/2019/124 (codi 5 annedd farchnad agored a 1 annedd fforddiadwy ynghyd a chreu mynedfeydd newydd i gerbydau a gwaith cysylltiedig) ar yr hen safle / Application for a Certificate of Lawfulness of existing development in relation to a material start having been made on planning permission reference FPL/2019/124 (erection of 5 open market dwellings and 1 affordable dwelling together with the creation of new vehicular accesses together with associated development) at the former