Planning application
Craig Selyf, Ffordd Telford Road, Porthaethwy / Menai Bridge
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Cais llawn i godi annedd ynghyd a chreu mynedfa newydd i gerbydau yn / Full application for the erection of a dwelling together with the construction of a new vehicular access at
As published by the council, reference FPL/2025/253
Application record
- Reference
- FPL/2025/253
- Type
- Full Planning Permission
- Status
- Closed
- Decision
- Tynnwyd yn ôl / Withdrawn
- Received
- 27 Oct 2025
- Validated
- 28 Oct 2025
- Decided
- 19 Jun 2026
- Ward
- Aethwy
- Parish
- Menai Bridge
- Decision by
- Pwyllgor Cynllunio / Planning Committee
Timeline
Dates from the published record
-
27 Oct 2025
Received by Isle of Anglesey
-
28 Oct 2025
Validated
Checked as complete and ready for consideration.
-
19 Jun 2026
Decision issued: Tynnwyd yn ôl / Withdrawn
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Craig Selyf, Ffordd Telford Road, Porthaetwhy/Menai Bridge
Rhybudd ynghylch gwaith ar goed mewn Ardal Gadwraeth yn / Notification of works to trees in a Conservation Area at
Decided Trees 5 docs -
Craig Selyf, Porthaethwy/Menai Bridge
Cais llawn ar gyfer addasu ac ehangu ynghyd a addasu'r fynedfa bresennol / Full application for alterations and extensions together with alterations to the existing access at
Granted Householder Extension 9 docsDomestic -
Craig Selyf, Ffordd Telford / Telford Road, Porthaethwy / Menai Bridge
Cais llawn i codi annedd ynghyd a creu mynedfa newydd i gerbydau ar dir yn / Full application for the erection of a dwelling together with the construction of a new vehicular access on land at
Refused Full applications New dwelling 14 docsDomestic -
Craig Selyf, Ffordd Telford Road, Porthaethwy / Menai Bridge.
Cais i wneud gwaith ar goed sydd wedi eu gwarchod gan Orchymyn Diogelu Coed yn / Application for works to trees protected by a Tree Preservation Order at
Withdrawn Trees 3 docs -
Y Gilfach, Ffordd Telford Road, Porthaethwy / Menai Bridge.
Cais llawn i uwchraddio ffabrig yr adeilad presennol, ynghyd â symud ac amnewid y porth ceir presennol yn / Full application for upgrades to the fabric of the existing building, together with the removal and replacement of existing car port at
Granted Full applications 13 docs -
Y Gilfach, Ffordd Telford Road, Porthaethwy / Menai Bridge.
Cais llawn i uwchraddio ffabrig yr adeilad presennol, ynghyd â symud ac amnewid y porth ceir presennol yn / Full application for upgrades to the fabric of the existing building, together with the removal and replacement of existing car port at
Decided Full applications 10 docs
Other full applications applications
In Isle of Anglesey
-
FPL/2026/85 Granted
31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.
Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at
-
FPL/2026/69 Granted
Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead
Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at
-
FPL/2026/40 Granted
Cumbria, High Street, Rhosneigr.
Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at
-
FPL/2026/38 Granted
Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.
Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at
-
FPL/2025/285 Granted
Cefn Coch, Llanfechell
Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at