Planning application

Craig Selyf, Ffordd Telford / Telford Road, Porthaethwy / Menai Bridge

Refused Isle of Anglesey FPL/2023/39 Full

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Cais llawn i codi annedd ynghyd a creu mynedfa newydd i gerbydau ar dir yn / Full application for the erection of a dwelling together with the construction of a new vehicular access on land at

As published by the council, reference FPL/2023/39

Application record

Reference
FPL/2023/39
Type
Full
Status
Rejected
Decision
Gwrthod / Refused
Received
13 Feb 2023
Validated
27 Jun 2023
Decided
23 Aug 2023
Ward
Aethwy
Parish
Menai Bridge
Decision by
Delegated

Timeline

Dates from the published record

  1. 13 Feb 2023

    Received by Isle of Anglesey

  2. 27 Jun 2023

    Validated

    Checked as complete and ready for consideration.

  3. 23 Aug 2023

    Decision issued: Gwrthod / Refused

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Craig Selyf, Ffordd Telford Road, Porthaetwhy/Menai Bridge

    TCA/2023/5 Submitted 11 Oct 2023 0m away

    Rhybudd ynghylch gwaith ar goed mewn Ardal Gadwraeth yn / Notification of works to trees in a Conservation Area at

    Decided Trees 5 docs
  • Craig Selyf, Porthaethwy/Menai Bridge

    HHP/2023/25 Submitted 13 Feb 2023 0m away

    Cais llawn ar gyfer addasu ac ehangu ynghyd a addasu'r fynedfa bresennol / Full application for alterations and extensions together with alterations to the existing access at

    Granted Householder Extension 9 docs
    Domestic
  • Craig Selyf, Ffordd Telford Road, Porthaethwy / Menai Bridge.

    TPO/2026/4 Submitted 11 Feb 2026 0m away

    Cais i wneud gwaith ar goed sydd wedi eu gwarchod gan Orchymyn Diogelu Coed yn / Application for works to trees protected by a Tree Preservation Order at

    Withdrawn Trees 3 docs
  • Craig Selyf, Ffordd Telford Road, Porthaethwy / Menai Bridge

    FPL/2025/253 Submitted 27 Oct 2025 0m away

    Cais llawn i godi annedd ynghyd a chreu mynedfa newydd i gerbydau yn / Full application for the erection of a dwelling together with the construction of a new vehicular access at

    Withdrawn Full applications New dwelling 10 docs
    Domestic
  • Y Gilfach, Ffordd Telford Road, Porthaethwy / Menai Bridge.

    HHP/2024/42 Submitted 29 Feb 2024 78m away

    Cais llawn i uwchraddio ffabrig yr adeilad presennol, ynghyd â symud ac amnewid y porth ceir presennol yn / Full application for upgrades to the fabric of the existing building, together with the removal and replacement of existing car port at

    Granted Full applications 13 docs
  • Y Gilfach, Ffordd Telford Road, Porthaethwy / Menai Bridge.

    HHP/2022/303 Submitted 26 Oct 2022 78m away

    Cais llawn i uwchraddio ffabrig yr adeilad presennol, ynghyd â symud ac amnewid y porth ceir presennol yn / Full application for upgrades to the fabric of the existing building, together with the removal and replacement of existing car port at

    Decided Full applications 10 docs

In Isle of Anglesey

  • FPL/2026/85 Granted

    31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.

    Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at

    17 Apr 2026 Full applications
  • FPL/2026/69 Granted

    Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead

    Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at

    31 Mar 2026 Full applications
  • FPL/2026/40 Granted

    Cumbria, High Street, Rhosneigr.

    Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at

    23 Feb 2026 Full applications
  • FPL/2026/38 Granted

    Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.

    Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at

    18 Feb 2026 Full applications
  • FPL/2025/285 Granted

    Cefn Coch, Llanfechell

    Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at

    25 Nov 2025 Full applications