Planning application
Bro Dawel, Llanfaethlu
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais llawn ar gyfer ymestyn y cwrtil preswyl presennol yn / Full application to extend the existing residential curtilage at
As published by the council, reference FPL/2020/147
Application record
- Reference
- FPL/2020/147
- Type
- Full
- Status
- Permitted
- Decision
- Granted As published: Caniatáu / Permit
- Received
- 5 Aug 2020
- Validated
- 21 Aug 2020
- Decided
- 12 Dec 2020
- Ward
- Talybolion
- Parish
- Llanfaethlu
- Decision by
- Delegated
Timeline
Dates from the published record
-
5 Aug 2020
Received by Isle of Anglesey
-
21 Aug 2020
Validated
Checked as complete and ready for consideration.
-
12 Dec 2020
Decision issued: Caniatáu / Permit
-
30 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Isle of Anglesey granted permission on 12 December 2020, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Bryn Maethlu, Llanfaethlu
Rhybudd Eithriad Trydan ar gyfer uwchraddio'r llinell uwchben bresennol i dri cham yn / Electricity Exemption Notice for the upgrade of the existing overhead line to three phase at
Granted Other -
A5025 rhwng y Gyffordd ar yr A5 i’r Dwyrain o’r Fali i’r Orsaf Bwer yng Nghemaes /A5025 between A5 East of Valley Junction to Power Station Cemaes
Cais Adran 73 i amrywio amod (01) (Terfyn Amser) o gais VAR/2020/24 (Cais llawn i wella’r briffordd gyfredol (yr A5025) rhwng y gyffordd ar yr A5 i’r dwyrain o’r Fali i’r Gyffordd wrth y Ffordd Fynediad i’r Orsaf Bwer arfaethedig mewn wyth o leoliadau ar wahân ynghyd ag ailadeiladu a lledu’r pafin presennol a’r gorffenwaith ar yr arwynebedd mewn mannau, gweithredu compownd adeiladu dros dro gan gynnwys cyfleuster dros dro ar gyfer ailgylchu pafinau, creu dau bwll teneuo a mynedfa ar gyfer cynnal a chadw, creu llwybrau beicio a gwyro rhai eraill am gyfnod dros dro, creu cyfleusterau parcio eraill yn sgil colli cilfan ynghyd â gwaith cysylltiedig arall gan gynnwys draenio, trin ffiniau, plannu, gosod arwyddion newydd a marciau ar hyd yr) er mwyn ymestyn cyfnod gweithredu’r datblygiad am dair blynedd arall ar hyd yr / Section 73 application to vary condition (01) of application VAR/2020/24 (Full application for improvements to the existing highway (A5025) between A5 East of Valley Junction to the proposed Power Station Access Road Junction at eight separate locations together with reconstruction and localised widening of existing pavement and surface dressing, temporary construction compound including temporary pavement recycling facility, creation of 2 attenuation ponds and maintenance access, creation/temporary diversion of cycle routes, creation of alternative parking facilities to mitigate loss of lay by together with other associated works including drainage, boundary treatments, planting, new signage and road markings) so as to extend the implementation period of the development by a further three years along the
Granted Advertising 14 docs -
A5025 rhwng y Gyffordd ar yr A5 i’r Dwyrain o’r Fali i’r Orsaf Bwer yng Nghemaes / A5025 between A5 East of Valley Junction to Power Station Cemaes
Cais Adran 73 i amrywio amod (01) (Terfyn Amser) o gais VAR/2023/41 (Gwella’r briffordd gyfredol (yr A5025) rhwng y gyffordd ar yr A5 i’r dwyrain o’r Fali i’r Gyffordd wrth y Ffordd Fynediad i’r Orsaf Bwer arfaethedig mewn wyth o leoliadau ar wahân ynghyd ag ailadeiladu a lledu’r pafin presennol a’r gorffenwaith ar yr arwynebedd mewn mannau, gweithredu compownd adeiladu dros dro gan gynnwys cyfleuster dros dro ar gyfer ailgylchu pafinau, creu dau bwll teneuo a mynedfa ar gyfer cynnal a chadw, creu llwybrau beicio a gwyro rhai eraill am gyfnod dros dro, creu cyfleusterau parcio eraill yn sgil colli cilfan ynghyd â gwaith cysylltiedig arall gan gynnwys draenio, trin ffiniau, plannu, gosod arwyddion newydd a marciau ar hyd yr) er mwyn ymestyn cyfnod gweithredu’r datblygiad am dair blynedd arall ar hyd yr / Section 73 application to vary condition (01) of application VAR/2023/41 (Improvements to the existing highway (A5025) between A5 East of Valley Junction to the proposed Power Station Access Road Junction at eight separate locations together with reconstruction and localised widening of existing pavement and surface dressing, temporary construction compound including temporary pavement recycling facility, creation of 2 attenuation ponds and maintenance access, creation/temporary diversion of cycle routes, creation of alternative parking facilities to mitigate loss of lay by together with other associated works including drainage, boundary treatments, planting, new signage and road markings) so as to extend the implementation period of the development by a further three years along the
Granted Amendments 15 docs -
A5025 rhwng y Gyffordd ar yr A5 i’r Dwyrain o’r Fali i’r Orsaf Bwer yng Nghemaes / A5025 between A5 East of Valley Junction to Power Station Cemaes
Barn sgrinio i amrywio amod (01) o gais VAR/2023/41 (Cais Adran 73 i amrywio amod (01) (Terfyn Amser) o gais VAR/2020/24 (Cais llawn i wella’r briffordd gyfredol (yr A5025) rhwng y gyffordd ar yr A5 i’r dwyrain o’r Fali i’r Gyffordd wrth y Ffordd Fynediad i’r Orsaf Bwer arfaethedig mewn wyth o leoliadau ar wahân ynghyd ag ailadeiladu a lledu’r pafin presennol a’r gorffenwaith ar yr arwynebedd mewn mannau, gweithredu compownd adeiladu dros dro gan gynnwys cyfleuster dros dro ar gyfer ailgylchu pafinau, creu dau bwll teneuo a mynedfa ar gyfer cynnal a chadw, creu llwybrau beicio a gwyro rhai eraill am gyfnod dros dro, creu cyfleusterau parcio eraill yn sgil colli cilfan ynghyd â gwaith cysylltiedig arall gan gynnwys draenio, trin ffiniau, plannu, gosod arwyddion newydd a marciau ar hyd yr) er mwyn ymestyn cyfnod gweithredu’r datblygiad am dair blynedd arall) ar hyd y / Screening opinion to vary condition (01) of application VAR/2023/41 (Section 73 application to vary condition (01) of application VAR/2020/24 (Full application for improvements to the existing highway (A5025) between A5 East of Valley Junction to the proposed Power Station Access Road Junction at eight separate locations together with reconstruction and localised widening of existing pavement and surface dressing, temporary construction compound including temporary pavement recycling facility, creation of 2 attenuation ponds and maintenance access, creation/temporary diversion of cycle routes, creation of alternative parking facilities to mitigate loss of lay by together with other associated works including drainage, boundary treatments, planting, new signage and road markings) so as to extend the implementation period of the development by a further three years )) along the
Decided Advertising 10 docs -
A5025 rhwng y Gyffordd ar yr A5 i’r Dwyrain o’r Fali i’r Orsaf Bwer yng Nghemaes /A5025 between A5 East of Valley Junction to Power Station Cemaes
Barn sgrinio i amrywio amod (01) o gais VAR/2020/24 (cais o dan Adran 73 i amrywio amod (01) o gais 27C106E/FR/ECON (Cais llawn i wneud gwelliannau i’r briffordd (A5025) rhwng yr A5 i’r Dwyrain o Gyffordd y Fali i Gyffordd y Lôn Fynediad arfaethedig i’r Orsaf Bŵer mewn wyth lleoliad ar wahân ynghyd ag ailadeiladu’r palmant a’i ledu mewn mannau, ynghyd â thriniaeth wyneb, adeiladu compownd dros dro gan gynnwys cyfleuster ailgylchu palmant dros dro, creu dau bwll gwanhau a mynedfa ar gyfer cynnal a chadw, creu llwybrau beicio/gwyro llwybrau beicio dros dro, creu cyfleusterau amgen i liniaru effaith colli cilfan ynghyd â gwaith cysylltiedig arall gan gynnwys draenio, triniaethau i’r terfynau, gwaith plannu, arwyddion newydd a marciau ffordd) er mwyn ymestyn cyfnod gweithredu’r datblygiad am dair blynedd arall (hyd at 13 Gorffennaf 2023) ar hyd y / Screening opinion to vary condition (01) of application VAR/2020/24 (Section 73 application to vary condition (01) of application 27C106E/FR/ECON (Full application for improvements to the existing highway (A5025) between A5 East of Valley Junction to the proposed Power Station Access Road Junction at eight separate locations together with reconstruction and localised widening of existing pavement and surface dressing, temporary construction compound including temporary pavement recycling facility, creation of 2 attenuation ponds and maintenance access, creation/temporary diversion of cycle routes, creation of alternative parking facilities to mitigate loss of lay by together with other associated works including drainage, boundary treatments, planting, new signage and road markings) so as to extend the implementation period of the development by a further three years (up to 13th July 2023)) along the
Decided Outline 10 docs -
Berth, Llanfaethlu.
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed on land at
Refused Outline 3 docsSmall domestic
Other full applications
In Isle of Anglesey
-
FPL/2025/297 Withdrawn
Bryn Gwyn, Brynrefail, Dulas
Cais llawn ar gyfer dymchwel yr annedd a garej bresennol, codi annedd a garej newydd yn ei le a gwaith cysylltiedig yn / Full application for the demolition of the existing dwelling and garage, the erection of a replacement dwelling and garage and associated works at
-
FPL/2025/295 Granted
58 Stryd y Glorian / Machine Street, Amlwch.
Cais llawn ar gyfer codi garej newydd ar dir ger / Full application for the erection of a new garage on land adjacent to
-
FPL/2026/45 Granted
Rallt, Nebo.
Cais llawn i godi bloc stabl ar dir ger / Full application for the erection of a stable block on land near
-
FPL/2025/311 Granted
Tai Lewis Rogers, Ffordd Penmynydd, Penmynydd
Cais llawn ar gyfer trosi'r 5 eiddo preswyl presennol yn 3, yn ogystal ag addasu ac ehangu, creu mynedfa newydd, gosod pecyn trin carthion a phaneli solar ar y ddaear yn / Full application for the conversion of the 5 existing residential properties into 3, together with alterations and extensions, creation of a new access, installation of a treatment plant and ground mounted solar panels at
-
FPL/2026/33 Granted
M-SParc, Gaerwen
Cais llawn ar gyfer gosod paneli solar PV ar y ddaear, ynghyd ag offer cysylltiedig ar dir yn / Full application for the installation of ground mounted PV solar panels, together with associated equipment on land at