Planning application
Bryn Maethlu, Llanfaethlu
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Rhybudd Eithriad Trydan ar gyfer uwchraddio'r llinell uwchben bresennol i dri cham yn / Electricity Exemption Notice for the upgrade of the existing overhead line to three phase at
As published by the council, reference EXE/2024/9
Application record
- Reference
- EXE/2024/9
- Type
- Other
- Status
- Permitted
- Decision
- Granted As published: Dim Gwrthwynebiad / No Objection
- Received
- 5 Jul 2024
- Validated
- 5 Jul 2024
- Decided
- 16 Aug 2024
- Ward
- Talybolion
- Parish
- Llanfaethlu
- Decision by
- Delegated
Timeline
Dates from the published record
-
5 Jul 2024
Received by Isle of Anglesey
-
16 Aug 2024
Decision issued: Dim Gwrthwynebiad / No Objection
-
16 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Isle of Anglesey granted permission on 16 August 2024, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
A5025 rhwng y Gyffordd ar yr A5 i’r Dwyrain o’r Fali i’r Orsaf Bwer yng Nghemaes /A5025 between A5 East of Valley Junction to Power Station Cemaes
Cais Adran 73 i amrywio amod (01) (Terfyn Amser) o gais VAR/2020/24 (Cais llawn i wella’r briffordd gyfredol (yr A5025) rhwng y gyffordd ar yr A5 i’r dwyrain o’r Fali i’r Gyffordd wrth y Ffordd Fynediad i’r Orsaf Bwer arfaethedig mewn wyth o leoliadau ar wahân ynghyd ag ailadeiladu a lledu’r pafin presennol a’r gorffenwaith ar yr arwynebedd mewn mannau, gweithredu compownd adeiladu dros dro gan gynnwys cyfleuster dros dro ar gyfer ailgylchu pafinau, creu dau bwll teneuo a mynedfa ar gyfer cynnal a chadw, creu llwybrau beicio a gwyro rhai eraill am gyfnod dros dro, creu cyfleusterau parcio eraill yn sgil colli cilfan ynghyd â gwaith cysylltiedig arall gan gynnwys draenio, trin ffiniau, plannu, gosod arwyddion newydd a marciau ar hyd yr) er mwyn ymestyn cyfnod gweithredu’r datblygiad am dair blynedd arall ar hyd yr / Section 73 application to vary condition (01) of application VAR/2020/24 (Full application for improvements to the existing highway (A5025) between A5 East of Valley Junction to the proposed Power Station Access Road Junction at eight separate locations together with reconstruction and localised widening of existing pavement and surface dressing, temporary construction compound including temporary pavement recycling facility, creation of 2 attenuation ponds and maintenance access, creation/temporary diversion of cycle routes, creation of alternative parking facilities to mitigate loss of lay by together with other associated works including drainage, boundary treatments, planting, new signage and road markings) so as to extend the implementation period of the development by a further three years along the
Granted Advertising 14 docs -
A5025 rhwng y Gyffordd ar yr A5 i’r Dwyrain o’r Fali i’r Orsaf Bwer yng Nghemaes / A5025 between A5 East of Valley Junction to Power Station Cemaes
Cais Adran 73 i amrywio amod (01) (Terfyn Amser) o gais VAR/2023/41 (Gwella’r briffordd gyfredol (yr A5025) rhwng y gyffordd ar yr A5 i’r dwyrain o’r Fali i’r Gyffordd wrth y Ffordd Fynediad i’r Orsaf Bwer arfaethedig mewn wyth o leoliadau ar wahân ynghyd ag ailadeiladu a lledu’r pafin presennol a’r gorffenwaith ar yr arwynebedd mewn mannau, gweithredu compownd adeiladu dros dro gan gynnwys cyfleuster dros dro ar gyfer ailgylchu pafinau, creu dau bwll teneuo a mynedfa ar gyfer cynnal a chadw, creu llwybrau beicio a gwyro rhai eraill am gyfnod dros dro, creu cyfleusterau parcio eraill yn sgil colli cilfan ynghyd â gwaith cysylltiedig arall gan gynnwys draenio, trin ffiniau, plannu, gosod arwyddion newydd a marciau ar hyd yr) er mwyn ymestyn cyfnod gweithredu’r datblygiad am dair blynedd arall ar hyd yr / Section 73 application to vary condition (01) of application VAR/2023/41 (Improvements to the existing highway (A5025) between A5 East of Valley Junction to the proposed Power Station Access Road Junction at eight separate locations together with reconstruction and localised widening of existing pavement and surface dressing, temporary construction compound including temporary pavement recycling facility, creation of 2 attenuation ponds and maintenance access, creation/temporary diversion of cycle routes, creation of alternative parking facilities to mitigate loss of lay by together with other associated works including drainage, boundary treatments, planting, new signage and road markings) so as to extend the implementation period of the development by a further three years along the
Granted Amendments 15 docs -
A5025 rhwng y Gyffordd ar yr A5 i’r Dwyrain o’r Fali i’r Orsaf Bwer yng Nghemaes / A5025 between A5 East of Valley Junction to Power Station Cemaes
Barn sgrinio i amrywio amod (01) o gais VAR/2023/41 (Cais Adran 73 i amrywio amod (01) (Terfyn Amser) o gais VAR/2020/24 (Cais llawn i wella’r briffordd gyfredol (yr A5025) rhwng y gyffordd ar yr A5 i’r dwyrain o’r Fali i’r Gyffordd wrth y Ffordd Fynediad i’r Orsaf Bwer arfaethedig mewn wyth o leoliadau ar wahân ynghyd ag ailadeiladu a lledu’r pafin presennol a’r gorffenwaith ar yr arwynebedd mewn mannau, gweithredu compownd adeiladu dros dro gan gynnwys cyfleuster dros dro ar gyfer ailgylchu pafinau, creu dau bwll teneuo a mynedfa ar gyfer cynnal a chadw, creu llwybrau beicio a gwyro rhai eraill am gyfnod dros dro, creu cyfleusterau parcio eraill yn sgil colli cilfan ynghyd â gwaith cysylltiedig arall gan gynnwys draenio, trin ffiniau, plannu, gosod arwyddion newydd a marciau ar hyd yr) er mwyn ymestyn cyfnod gweithredu’r datblygiad am dair blynedd arall) ar hyd y / Screening opinion to vary condition (01) of application VAR/2023/41 (Section 73 application to vary condition (01) of application VAR/2020/24 (Full application for improvements to the existing highway (A5025) between A5 East of Valley Junction to the proposed Power Station Access Road Junction at eight separate locations together with reconstruction and localised widening of existing pavement and surface dressing, temporary construction compound including temporary pavement recycling facility, creation of 2 attenuation ponds and maintenance access, creation/temporary diversion of cycle routes, creation of alternative parking facilities to mitigate loss of lay by together with other associated works including drainage, boundary treatments, planting, new signage and road markings) so as to extend the implementation period of the development by a further three years )) along the
Decided Advertising 10 docs -
A5025 rhwng y Gyffordd ar yr A5 i’r Dwyrain o’r Fali i’r Orsaf Bwer yng Nghemaes /A5025 between A5 East of Valley Junction to Power Station Cemaes
Barn sgrinio i amrywio amod (01) o gais VAR/2020/24 (cais o dan Adran 73 i amrywio amod (01) o gais 27C106E/FR/ECON (Cais llawn i wneud gwelliannau i’r briffordd (A5025) rhwng yr A5 i’r Dwyrain o Gyffordd y Fali i Gyffordd y Lôn Fynediad arfaethedig i’r Orsaf Bŵer mewn wyth lleoliad ar wahân ynghyd ag ailadeiladu’r palmant a’i ledu mewn mannau, ynghyd â thriniaeth wyneb, adeiladu compownd dros dro gan gynnwys cyfleuster ailgylchu palmant dros dro, creu dau bwll gwanhau a mynedfa ar gyfer cynnal a chadw, creu llwybrau beicio/gwyro llwybrau beicio dros dro, creu cyfleusterau amgen i liniaru effaith colli cilfan ynghyd â gwaith cysylltiedig arall gan gynnwys draenio, triniaethau i’r terfynau, gwaith plannu, arwyddion newydd a marciau ffordd) er mwyn ymestyn cyfnod gweithredu’r datblygiad am dair blynedd arall (hyd at 13 Gorffennaf 2023) ar hyd y / Screening opinion to vary condition (01) of application VAR/2020/24 (Section 73 application to vary condition (01) of application 27C106E/FR/ECON (Full application for improvements to the existing highway (A5025) between A5 East of Valley Junction to the proposed Power Station Access Road Junction at eight separate locations together with reconstruction and localised widening of existing pavement and surface dressing, temporary construction compound including temporary pavement recycling facility, creation of 2 attenuation ponds and maintenance access, creation/temporary diversion of cycle routes, creation of alternative parking facilities to mitigate loss of lay by together with other associated works including drainage, boundary treatments, planting, new signage and road markings) so as to extend the implementation period of the development by a further three years (up to 13th July 2023)) along the
Decided Outline 10 docs -
Berth, Llanfaethlu.
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed on land at
Granted Outline 3 docsSmall domestic
Other less common application types
In Isle of Anglesey
-
DAG/2026/11 Granted
Gwyndy, Ffordd Penmynydd Road, Penmynydd
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi gorchudd iard yn / Application to determine whether prior approval is required for the erection of a yard covering at
-
EXE/2026/2 Granted
Rhyd yr Arian, Gaerwen.
Hysbysiad o fwriad i ail-leoli'r llinell uwchben bresennol ar dir / Notice of intention for the repositioning of an existing overhead line at land
-
EXE/2026/1 Granted
Tyddyn Llywarch, Ffordd Yr Ysgol, Llanddaniel
Rhybudd Eithriad Trydan ar gyfer ar gyfer ail-leoli llinell drydan uwchben bresennol ar dir ger / Electricity Exemption Notice for reposition an existing overhead electricity line on land near
-
MIG/2025/1 Decided
Gwyndy Quarry, Llandrygan.
Cais ar gyfer ymestyniad fertigol i chwarel wenithfaen bresennol i gynnwys dwy fonc ychwanegol i -10 metr islaw AOD, a chydgrynhoi amodau cloddio am fwynau sydd ar waith yn y chwarel ehangach yn / Application for a vertical extension to the existing granite quarry comprising two additional benches to -10 metres below AOD, and the consolidation of extant mineral extraction conditions which are in force within the wider quarry at
-
EXE/2025/6 Granted
Rhiwgoch Bach, Carmel.
Hysbysiad eithriad ynni i uwchraddio y llinell uwchben bresennol i gyfnod 3 ar dir ger / Electricity exemption notice to upgrade existing overhead line to phase 3 on land near