Planning application
Uned 2, 3 a 4 Ystad Ddiwydiannol Morawelon, Caegybi / Unit 2, 3 and 4 Morawelon Industrial Estate, Holyhead
Works: Demolition Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Caniatâd blaenoro ar gyfer dymchwel 3 uned yn/ Prior approval for the demolition of 3 units at
As published by the council, reference DEM/2020/5
Application record
- Reference
- DEM/2020/5
- Type
- Outline
- Status
- Permitted
- Decision
- Granted As published: Datblygiad Caniataëdig / Permitted Development
- Received
- 9 Dec 2020
- Validated
- 9 Dec 2020
- Decided
- 30 Jan 2021
- Ward
- Tref Cybi
- Parish
- Holyhead
- Decision by
- Delegated
Timeline
Dates from the published record
-
9 Dec 2020
Received by Isle of Anglesey
-
30 Jan 2021
Decision issued: Datblygiad Caniataëdig / Permitted Development
-
30 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Isle of Anglesey granted permission on 30 January 2021, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Uned 2, 3 a 4 Ystad Ddiwydiannol Morawelon, Tir Ger Ffordd Beibo, Caergybi / Units 2, 3 and 4 Morawelon Industrial Estate, Land off Ffordd Beibio, Holyhead
Cais amlinellol ar gyfer codi 36 annedd gyda rhai materion wedi gadw yndol ynghyd a manylion o fynedfa yn / Outline application for the erection of 36 dwellings with some matters reserved together with details of access at
Withdrawn Outline 16 docsMajor scheme -
Uned 2, 3 a 4 Ystad Ddiwydiannol Morawelon, Tir Ger Ffordd Beibo, Caergybi / Units 2, 3 and 4 Morawelon Industrial Estate, Land off Ffordd Beibio, Holyhead.
Cais amlinellol ar gyfer codi 36 annedd gyda rhai materion wedi gadw yndol ynghyd a manylion o fynedfa yn / Outline application for the erection of 36 dwellings with some matters reserved together with details of access at
Decided Outline 15 docsMajor scheme -
50 Ffordd Tudur, Holyhead
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
Granted Householder Extension 11 docsDomestic -
39 Ffordd Tudur, Caergybi / Holyhead.
Cais llawn ar gyfer dymchwel y ports presennol ynghyd a addasu ac ehangu yn / Full application for the demolition of the existing porch together with alterations and extensions at
Granted Full applications Extension Demolition 7 docsSmall domestic -
48 Cae Braenar, Caergybi / Holyhead
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
Granted Full applications Extension 5 docs -
Ysgol Llanfawr School, Caergybi / Holyhead
Cais llawn ar gyfer estyniad yn cynnwys lifft llwyfan yn/Full application of an extension containing a platform lift at
Granted Full applications Extension 8 docs
Other outline applications
In Isle of Anglesey
-
GWY/2026/2 Decided
Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP
Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.
-
OP/2025/1 Granted
Llanfawr Road, Caergybi / Holyhead.
Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Decided
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at