Planning application
11/25/0130
Land to the north of Heys Lane, Great Harwood, BB6 7UA
Proposal
Major: Outline application for up to 14 dwellings and one commercial building
As published by the council, reference 11/25/0130
Timeline
Dates from the published record
-
2 Apr 2025
Received by Hyndburn
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Hyndburn for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
11/24/0345 Granted
1 Heys Lane, Great Harwood, BB6 7UA
Advertisement Consent: Ax1) Directional Sign, (Bx1) Directional Sign, (Dx1) Order Point Canopy, (Fx1) Totem Pole, (Gx1) Clearance Bar, (ix1) Single Sided Roundel 900mm, (ix2) Single Sided Roundel 1000mm, (Jx2) Evo 1 Word-mark, (Kx1) Mini Totem Monument Sign, (Sx1) Drive Thru Text
-
11/26/0241 Awaiting decision
Rishton Welding And Engineering Company Limited, Heys Lane, Great Harwood, Lancashire, BB6 7UA
Discharge of Conditions: 6 (Bird & Bat Boxes) attached to full planning permission reference 11/23/0134
-
11/24/0383 Granted
25 Cross Street, Great Harwood, Lancashire, BB6 7BT
Householder: Erection of single storey rear extension
-
11/26/0306 Awaiting decision
Albert Works,Barons Way,Oakenshaw,Great Harwood,BB6 7DL
Prior Approval Telecommunications: The installation of a 25-metre high lattice tower supporting 6no. radio antennas, 1no. transmission dish (the dish will have a radius of 0.3 metres) and ancillary equipment, along with 2no. ground-based cabinets at ground level and ancillary development thereto including a 3-metre high palisade compound fencing
-
11/26/0137 Awaiting decision
Land off Balfour Street, Great Harwood, Lancashire, BB6 7FY
Full Major: Erection of five employment buildings (Use Classes B2/B8), alterations to existing warehouse, creation of new access with Balfour Street and associated works including boundary treatments, parking and landscaping
Other outline applications
In Hyndburn
-
11/26/0104 Awaiting decision
Caravan Site West of Parsonage Street, Church, BB5 0HS
Outline Application: Erection of two light industrial (Use Class B2) buildings with all matters reserved except for access and layout
-
11/26/0242 Awaiting decision
Accrington Victoria Hospital, Haywood Road, Accrington, Lancashire, BB5 6AS
Screening Opinion: Request for screening opinion on demolition and clearance of hospital complex
-
11/26/0234 Awaiting decision
29 Mill Lane, Great Harwood, Lancashire, BB6 7UQ
Permission in Principle: for erection of between 3no. and 4no. residential dwellings within the garden of the existing dwelling.
-
11/26/0129 Awaiting decision
Church Street Garage, 12 Church Street, Church, Lancashire, BB5 4LF
Outline Application: Demolition of existing builders workshop and store. Erection of replacement builders workshop and store with 3 number additional commercial and storage units, including car commercial vehicle parking. All matters reserved except access and layout
-
11/25/0344 Decided
Land South of Blackburn Road, Oswaldtwistle, BB5 3RE
Request for Environmental Impact Assessment (EIA) Screening Opinion for Proposed Proposed Change of Use of Land to Burial Ground, Erection of Pavilion Building, Staff Building, Store and Compound, Creation of New Access Points, Internal Roads, Car Parking, Hard and Soft Landscaping