Planning application
25 Cross Street, Great Harwood, Lancashire, BB6 7BT
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Householder: Erection of single storey rear extension
As published by the council, reference 11/24/0383
Application record
- Reference
- 11/24/0383
- Type
- Full Planning Application
- Status
- Decided: APPROVED WITH CONDITIONS
- Decision
- APPROVED WITH CONDITIONS
- Received
- 17 Sep 2024
- Decided
- 5 Nov 2024
- Postcode
- BB6 7BT
Timeline
Dates from the published record
-
17 Sep 2024
Received by Hyndburn
-
5 Nov 2024
Decision issued: APPROVED WITH CONDITIONS
-
21 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Hyndburn granted permission on 5 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Albert Works,Barons Way,Oakenshaw,Great Harwood,BB6 7DL
Prior Approval Telecommunications: The installation of a 25-metre high lattice tower supporting 6no. radio antennas, 1no. transmission dish (the dish will have a radius of 0.3 metres) and ancillary equipment, along with 2no. ground-based cabinets at ground level and ancillary development thereto including a 3-metre high palisade compound fencing
Refused Telecoms 19 docs -
20 St Huberts Street Great Harwood BB6 7BE
Householder Prior Approval: Erection of single storey rear extension
Granted Prior approval Extension 7 docsSmall domestic -
Dorlan Court, Unit 5 Alan Ramsbottom Way Great Harwood BB6 7UR
Full: Demolition of the existing single storey front extension and construction of two storey extension
Granted Full applications Extension Demolition 18 docsSmall domestic -
Land to the north of Heys Lane, Great Harwood, BB6 7UA
85% historically approved · decision due ~28 May
Major: Outline application for up to 14 dwellings and one commercial building
Awaiting decision Outline 44 docsMajor scheme -
86 Queen Street, Great Harwood, BB6 7AL
Full: Change of use and conversion of retail unit with dwelling above, to sunbed/tanning shop
Granted Full applications 16 docsDomestic -
Land off Balfour Street, Great Harwood, Lancashire, BB6 7FY
80% historically approved · decision due ~8 Jun
Full Major: Erection of five employment buildings (Use Classes B2/B8), alterations to existing warehouse, creation of new access with Balfour Street and associated works including boundary treatments, parking and landscaping
Awaiting decision Full applications 80 docs
Other full applications
In Hyndburn
-
11/26/0247 Awaiting decision
St Oswalds Roman Catholic Primary School, Hartley Avenue, Accrington, Lancashire, BB5 0NN
Full: Erection of fencing around school boundary
-
11/26/0136 Granted
2, Lower Aspen Cottage Lower Aspen Lane, Oswaldtwistle, Lancashire, BB5 4NY
Householder: Erection of single storey detached garage
-
11/26/0378 Awaiting decision
Harwood Edge Farm, Wilpshire Road, Rishton, Lancashire, BB1 4AH
Full: Installation of 128 ground mounted solar panels with associated underground cabling to the dwelling
-
11/26/0396 Awaiting decision
Hyndburn Wind Farm, Haslingden Old Road, Oswaldtwistle, Lancashire, BB5 3RP
Non-material Amendment: Of planning permission reference 11/18/0115 to amend the description to "Minor material amendment under Section 73 of the Town and Country Planning Act 1990 to vary conditions 2 and 10 of planning permission 11/15/0351 to allow an increase in tip height of the approved wind turbines (with associated increase of hub height)"
-
11/26/0381 Awaiting decision
Altham Industrial Estate, Metcalf Drive, Altham Business Park, Altham, Lancashire, BB5 5TU
Full: Erection of 9 No. B8 Industrial Units with Associated Parking.