Planning application
R G E Engineering And Bridge Place Car Park The Avenue Godmanchester
Relates to 25/01587/FUL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of conditions 23 (Habitat Management and Maintenance Plan), 28 (Ecological Enhancement Method Statement) and 36 (Archaeological investigation) of 25/01587/FUL.
As published by the council, reference 26/80231/COND
Application record
- Reference
- 26/80231/COND
- Category
- Conditions
- Status
- In progress
- Received
- 3 Sep 2026
- Validated
- 9 Sep 2026
Site history
Applications at this address on the Huntingdonshire register
This site has had 5 applications since 2025: 3 approved, 0 refused.
-
26/80272/COND Awaiting decision
R G E Engineering And Bridge Place Car Park The Avenue Godmanchester
Discharge of conditions 5(Outside storage), 10 (Level changes), 11 (Levels detail), 12 (Estate railings), 19 (Access gates), 29 (Contamination), 32 (Surface water drainage scheme), 33 (Surface water mitigation), 34 (Foul water drainage), 35 (Hydrants), 43 (Construction traffic) and 46 (CEMP) of 25/01587/FUL (Demolition and part demolition of factory buildings and phased erection of 82 dwellings, access works, landscaping and associated development)
-
26/01419/NMA Granted
R G E Engineering And Bridge Place Car Park The Avenue Godmanchester
Non material amendment of 25/01587/FUL to amend the proposed build route.
-
26/80186/COND Granted
R G E Engineering And Bridge Place Car Park The Avenue Godmanchester
Discharge of condition 27 (Precautionary working method) of 25/01587/FUL
-
25/01587/FUL Granted
R G E Engineering And Bridge Place Car Park The Avenue Godmanchester
Demolition and part demolition of factory buildings and phased erection of 82 dwellings, access works, landscaping and associated development
Timeline
Dates from the published record
-
3 Sep 2026
Received by Huntingdonshire
-
9 Sep 2026
Validated
Checked as complete and ready for consideration.
-
15 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 4 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Huntingdonshire took a median of 61 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/01587/FUL Granted
R G E Engineering And Bridge Place Car Park The Avenue Godmanchester
Demolition and part demolition of factory buildings and phased erection of 82 dwellings, access works, landscaping and associated development
What happens while it is decided
This application is with Huntingdonshire for determination, against a statutory target of eight weeks. Over the last year Huntingdonshire decided condition discharge and variation applications in a median of 56 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Huntingdonshire
-
26/80238/COND Granted
Brookfield Farm Ermine Street Great Stukeley Huntingdon PE28 4AB
Discharge of condition 18 (Preconstruction Bat Survey) of 25/01922/OUT
-
26/80248/COND Granted
Brookfield Farm Ermine Street Great Stukeley Huntingdon PE28 4AB
Discharge of Condition 44 (Contamination site investigations) of 25/01922/OUT (Outline Planning Application with all matters reserved except for site access for construction of Storage and Distribution (Use Class B8), General Employment (Use Class B2), Bus Depot (Sui Generis) floorspace with ancillary offices and gatehouses, provision of landscaping, access infrastructure (including new and improved vehicular access from the A141, highway, parking, cycle and pedestrian access), utilities (including gas, electricity, water, sewerage, telecommunications), sustainable drainage systems, and all associated engineering works (including demolition of existing structures and buildings, breaking-up and reuse of hardstanding and ground remodelling and enabling works). The proposed development is phased with each phase being a separate and severable part of the development.)
-
26/80271/COND Awaiting decision
13 Berkley Street Eynesbury St Neots PE19 2NB
Discharge of condition 3 (sample of materials required) and 4 (rooflight details) of 26/00400/HHFUL
-
26/80242/COND Granted
1 The Glade The Boulevard Enterprise Campus Alconbury Weald Huntingdon PE28 4XA
Discharge of condition 3 (Plant & Machinery) of 24/02038/FUL
-
26/80208/COND Granted
3 The Avenue Godmanchester Huntingdon PE29 2AF
Dicharge of condition 3 (Schedule of Works) of 25/01266/LBC. Please see survey of the existing ironmongery in drawings 316-C3-01 to 20. Proposed Schedule of Works and justification for replacement ironmongery in document 316-C3-100.