Skip to content
PlanIndex Get alerts
Menu

Planning application

R G E Engineering And Bridge Place Car Park The Avenue Godmanchester

Granted Huntingdonshire 26/80186/COND Conditions

Relates to 25/01587/FUL

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of condition 27 (Precautionary working method) of 25/01587/FUL

As published by the council, reference 26/80186/COND

Application record

Reference
26/80186/COND
Category
Conditions
Status
Approved
Decision
Granted As published: Condition - Approved
Received
17 Jul 2026
Validated
17 Jul 2026
Decided
11 Sep 2026
Ward
Godmanchester And Hemingford Abbots
Parish
Godmanchester

Site history

Applications at this address on the Huntingdonshire register

This site has had 5 applications since 2025: 3 approved, 0 refused.

  • 26/80272/COND Awaiting decision

    R G E Engineering And Bridge Place Car Park The Avenue Godmanchester

    Discharge of conditions 5(Outside storage), 10 (Level changes), 11 (Levels detail), 12 (Estate railings), 19 (Access gates), 29 (Contamination), 32 (Surface water drainage scheme), 33 (Surface water mitigation), 34 (Foul water drainage), 35 (Hydrants), 43 (Construction traffic) and 46 (CEMP) of 25/01587/FUL (Demolition and part demolition of factory buildings and phased erection of 82 dwellings, access works, landscaping and associated development)

    Submitted 2 Nov 2026 Conditions
  • 26/80231/COND Awaiting decision

    R G E Engineering And Bridge Place Car Park The Avenue Godmanchester

    Discharge of conditions 23 (Habitat Management and Maintenance Plan), 28 (Ecological Enhancement Method Statement) and 36 (Archaeological investigation) of 25/01587/FUL.

    Submitted 3 Sep 2026 Conditions
  • 26/01419/NMA Granted

    R G E Engineering And Bridge Place Car Park The Avenue Godmanchester

    Non material amendment of 25/01587/FUL to amend the proposed build route.

    Decided 2 Sep 2026 Amendments
  • 25/01587/FUL Granted

    R G E Engineering And Bridge Place Car Park The Avenue Godmanchester

    Demolition and part demolition of factory buildings and phased erection of 82 dwellings, access works, landscaping and associated development

    Decided 22 Apr 2026 Full applications

Timeline

Dates from the published record

  1. 17 Jul 2026

    Received by Huntingdonshire

  2. 23 Jul 2026

    Added to PlanIndex

  3. 11 Sep 2026

    Decision issued: Condition - Approved

Cases linked to this one on the register

  • 25/01587/FUL Granted

    R G E Engineering And Bridge Place Car Park The Avenue Godmanchester

    Demolition and part demolition of factory buildings and phased erection of 82 dwellings, access works, landscaping and associated development

    Decided 22 Apr 2026 Full applications

What this grant of permission means

Huntingdonshire granted permission on 11 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Huntingdonshire

  • 26/80238/COND Granted

    Brookfield Farm Ermine Street Great Stukeley Huntingdon PE28 4AB

    Discharge of condition 18 (Preconstruction Bat Survey) of 25/01922/OUT

    Received 9 Sep, published by the council 11 Sep 2026 Conditions
  • 26/80248/COND Granted

    Brookfield Farm Ermine Street Great Stukeley Huntingdon PE28 4AB

    Discharge of Condition 44 (Contamination site investigations) of 25/01922/OUT (Outline Planning Application with all matters reserved except for site access for construction of Storage and Distribution (Use Class B8), General Employment (Use Class B2), Bus Depot (Sui Generis) floorspace with ancillary offices and gatehouses, provision of landscaping, access infrastructure (including new and improved vehicular access from the A141, highway, parking, cycle and pedestrian access), utilities (including gas, electricity, water, sewerage, telecommunications), sustainable drainage systems, and all associated engineering works (including demolition of existing structures and buildings, breaking-up and reuse of hardstanding and ground remodelling and enabling works). The proposed development is phased with each phase being a separate and severable part of the development.)

    Received 1 Oct, published by the council 5 Oct 2026 Conditions
  • 26/80271/COND Awaiting decision

    13 Berkley Street Eynesbury St Neots PE19 2NB

    Discharge of condition 3 (sample of materials required) and 4 (rooflight details) of 26/00400/HHFUL

    Received 2 Nov, published by the council 4 Nov 2026 Conditions
  • 26/80242/COND Granted

    1 The Glade The Boulevard Enterprise Campus Alconbury Weald Huntingdon PE28 4XA

    Discharge of condition 3 (Plant & Machinery) of 24/02038/FUL

    Received 18 Sep, published by the council 22 Sep 2026 Conditions
  • 26/80208/COND Granted

    3 The Avenue Godmanchester Huntingdon PE29 2AF

    Dicharge of condition 3 (Schedule of Works) of 25/01266/LBC. Please see survey of the existing ironmongery in drawings 316-C3-01 to 20. Proposed Schedule of Works and justification for replacement ironmongery in document 316-C3-100.

    Received 12 Aug, published by the council 17 Aug 2026 Conditions