Planning application
Land Between Hill Crest And Dove Lane Potters Bar Hertfordshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Redevelopment of the site for the erection of 112 dwellings, site access, roads, parking, open space, SuDs and associated infrastructure.
As published by the council, reference 26/0619/FUL
Application record
- Reference
- 26/0619/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 7 May 2026
- Validated
- 7 May 2026
- Ward
- Bentley Heath & The Royds
- Parish
- No Parish
Timeline
Dates from the published record
-
7 May 2026
Received by Hertsmere
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hertsmere took a median of 58 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DMH Stallard LLP Agent, registered in Brighton
Active · incorporated 2008 · Brighton
35 applications on PlanIndex · across 11 councils · 89% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
150 documents on file for this application
- Cpre response
- Herts cc growth and infrastructure response
- Lead local flood authority response
- Growth and infrastructure response
- Urban design comments
- Highways response
- Potters bar society response
- Hcc healthy places response
- Ecology response
- Built heritage response
- Landscape response
- Psear response
- National grid response
- Consultee comment submitted online
- Network rail response
- Affinity water response
- Thames water response
- Natural england response
- Active travel england comments
- Environment agency comments
- Climate change officer comments
- Consultee comment submitted online
- Cil response
- Heathrow response
- Uk power networks comment (neutral) submitted online
- Bng metric tool
- Covering letter
- Application form redacted
- Location plan
- Site layout
- Boundary treatments
- Materials plan
- Refuse strategy
- Cycle strategy
- Parking strategy plan
- Tenure plan
- Type rushton - floor plans
- Type rushton - elevations 1
- Type rushton - elevations 2
- Type rushton - elevations 3
- Type deene - floor plans
- Type deene - elevations
- Type witham - floor plans
- Type witham - elevations 1
- Type witham - elevations 2
- Type witham - elevations 3
- Type stirling - floor plans
- Type stirling - elevations 1
- Type stirling - elevations 2
- Type fernwood - floor plans
- Type fernwood - elevations
- Type maxwell - floor plans
- Type maxwell - elevations 1
- Type maxwell - elevations 2
- Type ha3 - floor plans
- Type ha3 - elevations 1
- Type ha3 - elevations 2
- Type ha3 - elevations 3
- Type ha3 - elevations 4
- Type ha3 - elevations 5
- Type ha3 - elevations 6
- Type ha1 - floor plans
- Type ha1 - elevations 1
- Type ha1 - elevations 2
- Type ha4 - floor plans
- Type ha4 - elevations
- Type afm1_afm2 - floor plans
- Type afm1_ afm2 - elevations
- Apartments plots 85-93 - ground floor plan
- Apartments plots 85-93 - first floor plan
- Apartments plots 85-93 - second floor plan
- Apartments plots 85-93 - front elevation
- Apartments plots 85-93 - rear elevation
- Apartments plots 85-93 - side elevations
- Apartments plots 94-102 - ground floor
- Apartments plots 94-102 - first floor plan
- Apartments plots 94-102 - second floor plan
- Apartments plots 94-102 - front elevation
- Apartments plots 94-102 - side elevation 1
- Apartments plots 94-102 - rear elevation
- Apartments plots 94-102 - side elevation 2
- Apartments plots 103-112 - ground floor plan
- Apartments plots 103-112 - first floor plan
- Apartments plots 103-112 - second floor plan
- Apartments plots 103-112 - front elevation
- Apartments plots 103-112 - side elevation 1
- Apartments plots 103-112 - rear elevation
- Apartments plots 103-112 - side elevation 2
- Street scenes 1-2
- Street scenes 3-4
- Street scenes 5-7
- Street scenes 8-11
- Stores - single store
- Stores - twin store
- Stores - refuse store 1
- Stores - refuse store 2
- Stores - cycle store
- Drawing list 16.04.26
- Site sections
- Design and access statement
- Air quality assessment
- Cultural heritage assessment
- Bng metric - pdf
- Biodiversity net gain report
- Preliminary ecological appraisal
- Planning statement
- Cil form 1: cil additional information
- Sustainability statement
- Flood risk assessment and drainage strategy part 1
- Flood risk assessment and drainage strategy part 2
- Flood risk assessment and drainage strategy part 3
- Flood risk assessment and drainage strategy part 4
- Flood risk assessment and drainage strategy part 5
- Strategy site levels plan
- Strategy site drainage plan
- Pipe reference drained areas plan
- Suds maintenance plan
- Existing exceedance flow routes plan
- Proposed exceedance flow routes plan
- Suds construction details sheet 1 of 2
- Suds construction details sheet 2 of 2
- Tier 1 desk study report - part two
- Tier 1 desk study report - part one
- Tier 2 ground investigation report
- Topsoil analyses
- Soft landscape proposals
- Soft landscape proposals
- Soft landscape proposals
- Soft landscape proposals
- Soft landscape proposals
- Landscape and visual impact assessment
- Soft landscape management and maintenance plan
- Soft landscape specification
- Noise impact assessment
- Tree protection plan
- Arboricultural impact assessment and method statement
- Street scenes 1-2 colour
- Street scenes 3-4 colour
- Street scenes 5-7 colour
- Street scenes 8-11 colour
- Transport assessment - 1 of 2
- Transport assessment - 2 of 2
- Residential travel plan
- General arrangement
- Refuse vehicle swept path analysis
- Fire tender swept path analysis
- Proposed site access arrangements
- Site access - refuse swept path analysis
- Proposed limit of adoption
- Car parking swept path analysis
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Hertsmere for determination, against a statutory target of eight weeks. Over the last year Hertsmere decided full applications in a median of 90 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Hertsmere
-
26/0671/FUL Decided
27A Harcourt Road Bushey Hertfordshire WD23 3PP
Change of Use from C3 Dwelling to Children's residential home (C2).
-
26/0971/FUL Decided
24 Southgate Road Potters Bar Hertfordshire EN6 5DZ
Change of use from class C3 to sui generis 8 bedroom HMO use facilitated by demolition of existing conservatory to facilitate construction of single storey rear extension. Conversion of garage to habitable space to include replacement of garage doors with window. Alterations to hard landscaping, bin and bike storage (additional information received on 31.07.2026 and 13.08.2026).
-
26/0632/FUL Decided
Earls Farm Earls Lane South Mimms Potters Bar Hertfordshire EN6 3LT
Demolition of existing stables block & ancillary building and rebuild of replacement stables building.
-
26/1008/FUL Decided
31 Tempest Avenue Potters Bar Hertfordshire EN6 5JU
Change of use from class C4 (6 Bed HMO) to sui generis (11 bedroom HMO) use facilitated by internal alterations, provision of waste and cycle storage, and installation of new dropped kerb.
-
25/1648/FUL Decided
30 Beech Avenue Radlett Hertfordshire WD7 7DE
Demolition of existing dormer bungalow and construction of two storey detached house with accommodation at loft level, cycle and bin stores, front boundary works, and alterations to front and rear hard and soft landscaping.