Planning application
Bramshill Quarry Warren Heath Brickhouse Hill Eversley
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed retention of existing concrete batching plant and ancillary development until June 2026 [Variation of condition 2 (Time Limit) of PP: 20/03158/HCC] at Bramshill Quarry Warren Heath, Brickhouse Hill, Eversley, Hampshire RG27 0QB
As published by the council, reference 26/01191/HCC
Application record
- Reference
- 26/01191/HCC
- Type
- Hampshire County Council Application
- Status
- Registered
- Received
- 15 Jul 2026
- Validated
- 15 Jul 2026
- Ward
- Hartley Wintney
- Parish
- Eversley
- Decision by
- Delegated
Site history
Applications at this address on the Hart register
This site has had 3 applications since 2026.
-
26/01188/HCC Awaiting decision
Bramshill Quarry Warren Heath Brickhouse Hill Eversley
Proposed variation of Condition 1 of planning permission 14/00060/CMA so as to allow the extended use of the conveyor bridge, with its removal by 30 June 2026 [Variation of condition 1 (Timescale) of PP: 21/00052/HCC) at Bramshill Quarry Warren Heath, Brickhouse Hill, Eversley Hampshire RG27 0QB (EIA)
-
26/01186/HCC Awaiting decision
Bramshill Quarry Warren Heath Brickhouse Hill Eversley
Proposed variation of Conditions 1, 31 and 39 of planning permission 14/00063/CMA so as to allow an extension of time to complete extraction, processing and to remove plant, machinery and buildings until 30 June 2026, together with minor amendments to the restoration scheme and submission of the aftercare scheme [Variation of condition 1 (Timescale) of PP: 20/03153/HCC] at Bramshill Quarry Warren Heath, Brickhouse Hill, Eversley Hook RG27 0QB
Timeline
Dates from the published record
-
15 Jul 2026
Received by Hart
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hart took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Hart for determination, against a statutory target of eight weeks. Over the last year Hart's median decision took 56 days. More in our guide to how long planning decisions take.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Other less common application types
In Hart
-
26/00853/OHL Decided
Birchayes Branksomewood Road Fleet
Install a new section of Underground Electricity Cable.
-
26/00744/OHL Decided
Land Adjacent Nevills Hook Road North Warnborough
Install a Ground Mounted Electricity Substation.
-
26/01070/HCC Awaiting decision
Eversley Recycling The Welsh Drive Eversley Hook RG27 0QB
Phased extraction of approximately 263,000 net tonnes of sand and gravel and 2,553,000 net tonnes of fine/soft sand within two sites in Warren Heath, Eversley, Hampshire over an estimated period of 16-19 years and subsequent restoration using in situ material and inert materials and soil forming materials arising from Collard Group Limited wider operations at Eversley Recycling, The Welsh Drive, Eversley Hook Hampshire RG27 0QB
-
25/02123/HCC Decided
Cemex Fox Lane Eversley Cross RG27 0NQ
Planning application to vary conditions 1, 2 and 22 of planning permission 19/02866/HCC dated 5 April 2023 to extend the duration of the permission for the completion at Land at Chandlers Farm, Fox Lane, Eversley Cross Hook Hampshire RG27 0NQ
-
26/00188/OHL Decided
Terminal Building Blackbushe Airport London Road Blackwater Camberley GU17 9LQ
Proposed Sub Station installation.