Planning application
26/01070/HCC
Eversley Recycling The Welsh Drive Eversley Hook RG27 0QB
Proposal
Phased extraction of approximately 263,000 net tonnes of sand and gravel and 2,553,000 net tonnes of fine/soft sand within two sites in Warren Heath, Eversley, Hampshire over an estimated period of 16-19 years and subsequent restoration using in situ material and inert materials and soil forming materials arising from Collard Group Limited wider operations at Eversley Recycling, The Welsh Drive, Eversley Hook Hampshire RG27 0QB
As published by the council, reference 26/01070/HCC
Timeline
Dates from the published record
-
25 Jun 2026
Received by Hart
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Hart for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About other applications
How this application type works
This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.
Nearby applications
Within 500 metres
-
26/00067/PREAPP Decided
Brick House Brickhouse Hill Eversley Hook RG27 0PY
Erection of a covered parking bay over an existing gravel parking area. Wooden structure with 3 bays, 9x5m sitting on top of a dwarf wall and foundations. One of the bays will have doors, the other two will be open.
-
26/00661/FUL Awaiting decision
Copse Farm Brickhouse Hill Eversley Hook Hampshire RG27 0PY
Erection of four buildings following demolition of the existing buildings to provide replacement workshop space (Building 12) and new office space (Use Class E) (Buildings 4 and 5) and storage (Use Class B8) (Building 1) on the footprint of former piggery buildings (part retrospective)
Other other applications
In Hart
-
26/00853/OHL Decided
Birchayes Branksomewood Road Fleet
Install a new section of Underground Electricity Cable.
-
26/00744/OHL Decided
Land Adjacent Nevills Hook Road North Warnborough
Install a Ground Mounted Electricity Substation.
-
25/02123/HCC Decided
Cemex Fox Lane Eversley Cross RG27 0NQ
Planning application to vary conditions 1, 2 and 22 of planning permission 19/02866/HCC dated 5 April 2023 to extend the duration of the permission for the completion at Land at Chandlers Farm, Fox Lane, Eversley Cross Hook Hampshire RG27 0NQ
-
26/00188/OHL Decided
Terminal Building Blackbushe Airport London Road Blackwater Camberley GU17 9LQ
Proposed Sub Station installation.
-
25/02523/HCC Decided
New Mill Sewage Treatment Works New Mill Lane Eversley Hook RG27 0RA
Welfare building at New Mill Sewage Treatment Works, New Mill Lane, Eversley RG27 0RA