Planning application
25/01090/FUL
Centaur House Ancells Road Fleet Hampshire GU51 2UJ
Proposal
Demolition of two office buildings and erection of six units (E(g)/B2/B8) with access, landscaping and associated works
As published by the council, reference 25/01090/FUL
Timeline
Dates from the published record
-
9 Jun 2025
Received by Hart
-
3 Jul 2025
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Hart for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00444/HOU Refused
19 Fallow Field Fleet Hampshire GU51 2UU
Conversion of loft to habitable accommodation to include the removal and raising of the roof and the erection of a dormer window to rear and the insertion of two rooflights to front and insertion of a window to first floor side
-
25/02138/HOU Granted
23 Oasthouse Drive Fleet Hampshire GU51 2UL
Demolition of conservatory and erection of a single storey rear/side extension
-
23/01645/HOU Granted
6 Drovers End Fleet Hampshire GU51 2XB
Partial demolition of existing conservatory and erection of a single storey rear extension and insertion of window ground floor side.
-
25/02398/TPO Granted
Recreation Ground Farm Drive Fleet Hampshire GU51 2XF
Complete Tree works as per survey "Ancells 2025 Survey" - T1-T30
-
20/01124/TPO Refused
38 Shetland Way Fleet GU51 2UD
T1 Oak - located in the rear garden. To reduce lateral Spread which Overhangs the property by 2 - 2.5 metres selecting suitable growth points whilst retaining a natural shape keeping the pruning wounds no greater than 100 mm in diameter.
-
25/02202/TPO Granted
7 Hanover Drive Fleet Hampshire GU51 2TA
T1 - Oak - Reduce lateral spread of crown to the south by up to 1.5m and reduce lateral spread of crown to the north by up to 3 m. Deadwood and remove damaged branches from crown.
Other full applications applications
In Hart
-
26/01241/FUL Awaiting decision
Terranova Crane Sales Bowenhurst Lane Mill Lane Crondall Farnham GU10 5RP
Erection of extension to maintenance shelter
-
26/01230/FUL Awaiting decision
34 Reading Road South Fleet Hampshire GU52 7QL
Change of use of from Class E to Class C3 (dwelling houses) to form 5 no. self contained flats in relation to 23/00913/GPDCOM (retrospective)
-
26/00735/FUL Granted
Moor Place Farm Plough Lane Bramshill Hook Hampshire RG27 0RF
Erection of an agricultural barn
-
25/00215/FUL Refused
176 Fleet Road Fleet Hampshire GU51 4DE
Erection of first floor front, side and rear extensions, change of use of part of ground floor and whole of first floor to residential and creation of a second floor to provide 9 flats (3 x 1 bed and 6 x 2 bed) and alterations to shopfront and fenestration
-
26/00856/FUL Granted
1 Hill House West Crondall Road Fleet GU51 5SS
Conversion of two flats into single dwelling, erection of single storey front/rear extension, installation of solar panels and external changes